PRH (KUO-213-757)
No Weld Name No Stamp Date Weld
1 ANDRE/MUADIM/BOKIR 25/212/134 1/23/2020
SSHO (KUO-213-753)
No Weld Name No Stamp Date Weld
1 TEGUH/ROHMAN 80/72 1/23/2020
2 SIKAN/ACHSAN 76/160 1/23/2020
SSHI (KUO-213-753)
No Weld Name No Stamp Date Weld
1 SUKACIP/BUDI 277/194 1/23/2020
2 ZAINAL/EKO 229/133 1/23/2020
FIT UP
No Weld Name No Stamp Date Weld
1 SUWARNO 200 1/23/2020
2 ANUAR 150 1/23/2020
3 PRIO S 163 1/23/2020
4 SUGIYARTO/SELAMET S 165/162 1/23/2020
5 KAMALUDDIN 123 1/23/2020
6 PRIO N 195 1/23/2020
7 SUYONO 197 1/23/2020
-214-078-FW1)
No Joint Total
179sd184 6
Total 6
O-214-076-FW1)
No Joint Total
42sd58 17
Total 17
O-213-955-FW1)
No Joint Total
123sd138/140/142/143/144 20
33sd39/51ss54 11
165sd180/157sd160 20
4/5/8/13 4
Total 55
213-949-FW1)
No Joint Total
227sd237 11
31sd41 11
54sd64 11
142sd146 5
187sd191 5
Total 43
13-757)
No Joint Total
FW6/17 1
Total 1
13-753)
No Joint Total
FW2/5 1
FW2/12 1
Total 2
13-753)
No Joint Total
FW1/15 1
FW1/22 1
Total 2
23/01/2020 126
P
Description Total
FURNACE SEPIRAL FRONT 14
FURNACE SEPIRAL RIGHT 40
FURNACE SEPIRAL RIGHT 9
FURNACE SEPIRAL RIGHT 15
FURNACE SEPIRAL LEFT FRONT 35
ROOF TUBE 12
ROOF TUBE 11
23/01/2020 136