Download as pdf or txt
Download as pdf or txt
You are on page 1of 53

Jiangsu Fengye Technology & Environment Group Corporation Limited

Brochure and FGD Project Introduction

江苏峰业科技环保集团股份有限公司
公司及 FGD 项目简介

Jiangsu Fengye Technology & Environment Group Corporation


江苏峰业科技环保集团股份有限公司
Chairman’s Speech on Glory and Dream
董事长寄语
Perseverance never gives up. With years’ polish, Fengye Group has left a solid pace from the
sandy plateau to the brilliantly illuminated Beijing. From the foundation of Beijing Fengye to
the investment of Jiangsu Fengye, from the foundation of the world ’ s largest SCR
catalystcompany to the investment of the fruitful franchise projects including desulfurization
denitration, dust BOT and BOO, Fengye Group has grown up from an electrical installation
team to a technology group combining the business of electrical environmental project design,
R&D, production, projects engineering, and desulfurization catalystdevelopment and
production, electrical facility operation, pollution remediation and new energy. We have been
committing to environmental protection and social services, and have progressed from weak
to strong. This is the glory for history, for each personal in Fengye and also for those who have
paid attention and concern to Fengye.

Today, Fengye stands at a new height with a new starting point, we will follow the drums of
time, to adjust our structure, to change the growth mode, to catch the rare opportunity of the
industry, seek strategic cooperation and to seek more stable, sustainable and healthier
leapfrog development by taking advantage of capital power. This is not only the requirement
of the times, but also the requirements of us. It is still long way to the final success.

Don’t forget the early heart, and ambition will finally reward. The glory has become the past,
and the dream has been set sail. Anyway we will uphold the inspirit “Honesty Builds Fengye”,
and commit to environmental protection science and technology to guard the green
environment, to create fine brand for customers, and to serve the society by developing
future broader green energy-saving emission reduction and clean energy new markets. We are
aimed to build Fengye as an international, diversified, high-quality green technology,
environmental protection, and the world's strong enterprise. This is not only "Fengye dream",
but also the inevitable request from human beings and times.
目录 Contents

第一部分 公司概况

Part One- A brief Introduction of the Company

第二部分 业务范围

Part Two- Range of Business

第三部分 典型项目介绍

Party Three- Typical Projects Executed by the Company

第四部分 主要项目业绩

Part Four- Major Projects Achievements & Credentials

第五部分 现有合同清单

Part Five- LIST OF CONTRACTS IN HAND

第六部分 核心技术专利

Part Six- Core Technology & Patent

第七部分 国际交流与合作

Part Seven- International Cooperation & Communication

第八部分 资质文件附件

Part Eight- Attachments of Qualifiction Documents


第一部分 公司概况

Part One A brief Introduction of the Company

Jiangsu Fengye Technology & Environment Group Corporation Limited is a large scale
technology based private company that provides integrated services in the fields of production
of environment protection products, EPC contracting, development and production of SCR
catalyst (core consumable in the DeNox process), DeNox, efficiency enhancement
modification, environment restoration, treatment of solid wastes, BOT or concessional O&M
of ultra-low emission and energy conservation and efficiency enhancement projects.

As of now the company consists of eight member companies: Jiangsu Fengye Technology &
Environment Group Corporation Limited, Jiangsu Wande Environmental Protection
Technology Co., Ltd, Beijing Fengye Environmental Protection Technology Co., Ltd, Jiangsu
Fengye Electrical Facility Co., Ltd, Ningxia Fengye Environmental Protection Technology Co.,
Ltd, Inner Mongolia Environmental Protection Technology Co., Ltd, Henan Fengye
Environmental Protection Technology Co., Ltd, Shanxi Baode Fengye Environmental Protection
Technology Co., Ltd.

Jiangsu Fengye Technology & Environment Group Corporation Limited


The company was established in April.2004, with registered capital of 186 million RMB. The
company has Grade-A Environment Project (Air Pollution Prevention Project) Engineering
Credential, Grade-B Environment Project (Water Pollution Prevention Project) Engineering
Credential, Grade II Mechanical & Electrical Erection EPC Credential, Grade II Municipal
Projects EPC Credential, Grade III Civil & Erection EPC Credential, Grade II Environment
Projects Contracting Credential, Grade II Anti-Corrosion & Insulation Projects Contracting
Credential, Grade III Steel Structure Projects Contracting Credential and Credential Certificate
for Operation of Environment Pollution Treatment Facilities. The company is appraised as a
High-Tech, New-Tech enterprise in Jiangsu Province, P.R.C. The company is capable of
manufacturing various FGD & DeNox equipment, wind power equipment, steel-tube type
electricity transmission tower, steel structure, and other electrical environment protection
equipment. The Company mainly includes HQ and 4 to 6 Project offices located at places other
than HQ. It has plant made of steel structure covering an area of 40,000 m2 with over 200
machinery of medium to large scale. There are 300 staff working for the company, among
which 200 people are management and technical staff. Among the 300 staff, 150 of them have
medium-to-high professional titles. The company is capable of providing services covering the
whole process from engineering, manufacturing to erection.
The company has established long-term and extensive cooperation with many universities and
research institutions. The company is also with a provincial level academician workstation. The
company has established joint R&D center with North China Electric Power University,
Zhejiang University, Nanjing Tech University and Tsinghua University, which laid a solid talent
and R&D foundation for sustainable development of the company.

Beijing Fengye Environmental Protection Technology Co., Ltd


The company was established in October.2003 with registered capital of 100.11 million RMB.
It is the wholly owned subsidiary of Jiangsu Fengye Technology & Environment Group
Corporation Limited. The company is member of CAEPI, among the standing committee of
DeNox Industry of CAEPI. The Company is appraised as High-Tech, New-Tech enterprise of
Beijing, P.R.C. It has Grade-A Environment Protection Project Contracting Credential. The
Company mainly includes HQ in Beijing and over 10 Project offices located at places other than
HQ. It has over 300 machinery of medium to large scale. There is 400 staff working for the
company, most of which are technical staff. Among staff, 30 of them have high professional
titles, and 150 people with medium professional titles.

Jiangsu Wande Environmental Protection Technology Co., Ltd


The company was established in January of 2010 with registered capital of 300 million RMB,
the company is a wholly owned subsidiary of Jiangsu Fengye Technology & Environment
Group Corporation Limited. The company is mainly focused on R&D, production and sale of
core product in power plant DeNox, i.e. SCR catalyst, including honeycomb catalyst, plate type
catalyst and regenerative catalyst. The company has acquired 106667m2 of land in the state-
level development zone - Yangzhou Economic and Technological Development Zone. In
September 2009, it established SCR Denitration Catalyst R&D Center jointly with North China
Electric Power University. In 2010, it successfully developed honeycomb SCR denitration
catalyst product, and obtained patent for the said invention (patent number:
ZL2011100052642). In 2013, the company successfully developed plate catalyst and
regenerative catalyst, and obtained plate catalyst invention patent (patent number:
ZL201310315676.5) and the catalyst regeneration invention patent (patent number:
201410165148.0). After testing, the parameters and performance indexes of various catalysts
developed by our company have exceeded or reached the standards of similar foreign
products. Our company has become the first company in China to have independent
intellectual property rights of all kinds of SCR denitration catalysts. With an annual output of
30000m3 of honeycomb SCR denitration catalyst, 25000m3 of plate catalyst and 25000m3 of
regenerated catalyst, the total production capacity is 75000 m3/year. It has the world's largest
production capacity, the most complete product type, the company has maintained all range
cooperation with world renowned companies of the same industry such as Argillon of
Germany, CCIC of Japan, Nano of South Korea in the fields of technology, equipment, service
and products.
Ningxia Fengye Environmental Protection Technology Co., Ltd, Inner Mongolia
Environmental Protection Technology Co., Ltd, Henan Fengye Environmental Protection
Technology Co., Ltd, Shanxi Baode Fengye Environmental Protection Technology Co., Ltd.
These companies are specialized in implementation of concessional O&M of desulfurization,
DeNox and dedusting facilities, registered capital of the companies totaled 500 million RMB,
installed capacity of desulfurization, DeNox, and dedusting facilities reached 12 million KW,
with 10 sets of 660MW and 4 sets of 330MW desulfurization, denitration and dust removal
facilities.

Jiangsu Fengye Electrical Facility Co., Ltd


Established in June 2013 with a registered capital of 100 million yuan, Jiangsu Fengye Electrical
Facility Co., Ltd is a wholly-owned subsidiary of Jiangsu Fengye Technology & Environment
Group Corporation Limited. The company is mainly engaged in development and manufacture
of ultra-high voltage transmission steel tube tower and assembly of wind power tower
downlight, FGD equipment, Denox equipment, dust removal equipment, slag removal
equipment, air cooling equipment, pressure vessels, cable trays, sewage treatment equipment,
electrical panels & cabinets and non-standard equipment. It is a newly established company
for our company to expand into the new power equipment market.
(1) 换热器 Heat Exchanger
A heat exchanger is a device that transfers a portion of the heat of a hot fluid to a cold fluid. It
plays an important role in the production of electricity, chemicals, petroleum, food and many
other industries. In the power industry, heat exchangers can be widely used as low
temperature and low pressure economizers, MGGH, evaporators and reboilers.

(2) 复合电极式高效除尘除雾装置 Composite


Electrode High Efficiency Dust Removal & Mist
Elimination Device
The device is an efficient dust removal and mist
eliminating technology that can be applied to all
working conditions. The successful development of the
device has revolutionized the ultra-low and ultra-clean
emission process technology. It has extremely high
application value in saving project investment,
shortening construction period, lower cost and not
occupying the space outside the absorber tower and its
service life.
(3) 其他设备 Other Equipment
Since its establishment, Jiangsu Fengye Technology & Environment Group Corporation Limited
has been committed to providing comprehensive solutions for the flue gas treatment of
thermal power plants. It is one of the few comprehensive environmental protection
companies in China that integrates equipment manufacturing, environmental protection
materials manufacturing, installation, construction and operation services. The main business
of the company is EPC implementation of FGD, DeNox, dust removal, energy saving renovation,
environment restoration, solid waste treatment and waste water treatment projects, it is also
focused on manufacturing of FGD, DeNox, dust removal, energy saving renovation,
environment restoration, solid waste treatment and waste water treatment main and
peripheral equipment. The company is also engaged in research and development, production
and sales of SCR denitration catalysts, and regeneration of denitration catalysts.

Since entering the fields of flue gas desulfurization, DeNox, dust removal, energy saving
renovation, environment restoration, solid waste treatment and wastewater treatment in
2003, the company has continuously expanded its industrial chain and actively sought higher
value-added products and services to enhance its core competition. At the same time, we
adhere to the enterprise spirit of “Base Development of Company on Honesty and Integrity”,
and we adhere to the business philosophy of “Dedicating to environment protection to create
a clear blue sky”. With providing a full range, whole process, one-stop environment protection
project services as our goal, we strive to make the company the most complete and integrated
environmental protection services provider in the global business market .

Group Development Events


2003 Beijing Fengye Electric Power Environmental Protection Engineering Co. Ltd. was born as
a contract of thermal power plant desulfurization, denitration, dust and power engineering
based environmental protection company. It is also the first station of the power of
environmental protection as the main business of specialized public, and the brand “Fengye”
was born from this company.

2004 Jiangsu Fengye industry technology environmental protection group Limited by Share Ltd
was established, it is the first specialized company, whose business combines facility
development and production of flue gas desulfurization, denitrification, dust and other electric
power environmental protection. Ever since, Fengye Group opened a new chapter in
environmental protection industry.

2010 The world's first SCR catalyst R&D and production site - Jiangsu Wande Environmental
Protection Technology Co., Ltd was founded. Fengye achieved leapfrog development from the
Central Bureau of environmental protection engineering to high-tech environmental friendly
products, extending the industrial chain. And its science innovation, along with the “high, new
and top” products brought new momentum to the group.

2011 The strategic investment was introduced in, and Fengye ’ s development started a new
chapter of BOT mode.

2012 Committing at innovation upgrading, Fengye achieved the forefront of the domestic
industry the comprehensive management on air pollution, with the development mode of EPC
general contractor, SCR catalyst R&D and BOT and so on.

2014 Fengye Group absorbed funds from quality investors, totally about 6 billion to resolve
the funds gaps in licensed projects including desulfurization, denitration and dust removal,
which injected strong momentum into the company's development.

2016 Fengye Group developed its own core technical systems including desulfurization,
denitration, dust removal and SCR catalyst and many other techniques, by cooperating with
parallel universities and science research institutions. Fengye Group maintained this industry’s
worldwide leadership, and at the same time brought the advanced Chinese process and
technique to the world stage.

2017 Fengye signed a strategic cooperation agreement with UK Esmolol group. The both have
committed further strategic cooperation in environment control and mediation, and will
cooperate to develop the environment mediation market both in China and abroad.

第二部分 业务范围
Part Two- Range of Business

Jiangsu Fengye Group since its inception has been committed to comprehensive solutions flue
gas treatment of

coal-fired power plant. The main business contains the flue gas desulfurization, denitration,
dust removal, the implementation of ultra low ultra clean emissions and carbon capture
projects, manufacturing denitration equipments and complete sets of equipments,
development and production and sales of SCR catalyze, and implementation of BT, BOT, BOO
projects, as well as the projects of soil, rivers, oceans and other environmental remediation,
the photovoltaic, wind power and other new energy business.

Since the group entered this field in 2003, it continuously expanded and extended its
industrial chain, and actively seed higher value-added products and services, enhancing its
core competitiveness. Adhering to the "development of the concept of environmental
protection, science and technology is committed to making cotton blue sky", thought that the
thermal power plant to provide a full range of the whole process, one station, a Dragon, the
best environmental protection project service for the purpose of management, and strive to
make the company to become the global business system of the most comprehensive
environmental service supplier.

The enterprise with large thermal power plant flue gas sulfur, iron series, nitrate removal,
mercury removal, waste heat steam recovery and 3009/KWH coal consumption
transformation of environmental protection and energy saving engineering design, project
implementation, franchise enterprise staff ability preparation EPC, wind, new energy EPC, BOT
implementation capacity;
. The enterprise has the implementation ability of wind energy, solar energy and other new
energy EPC.

. The enterprise has EPC power engineering of enterprises BOT implementation ability

. The enterprise has enterprises have the ability to refuse treatment and solid waste
generation Kang EPC, BOT implementation.

. The enterprise is soil remediation, repair, fill river, ocean cure and repair EPC implementation
of the capacity

. The enterprise is capable to manage water supply and drainage engineering, industrial and
domestic sewage treatment, water discharge crime engineering design, project
implementation and project management operation.

. The enterprise can process the SCR cellular and plate type catalyzes development, design and
production, installation, regeneration, testing and raw materials recycling.

. The enterprise has the ability to design and build facilities for desulfurization, denitration,
demercuration, dust removal, water treatment and other special equipment and general
equipment.

. The enterprise has the ability to design and build facilities for wind power facilities, UHV steel
pipe tower integration facilities and all kinds of light and heavy steel structural facilities, as
well as pressure container and other non-standard facilities.

. The enterprise has the ability to design and build high and low voltage electric appliance
panel cabinets, bus and power fittings and other electrical facilities.

. The enterprise has the ability to carry out environmental protection EPC on industrial noise
and nuclear wastes.

. The enterprise has the ability to carry out EPC and BOT on CO2 capture.

. The enterprise masters the core technique of desulfurization, denitration and dust removal
(PM 2.5), and ultra-low and ultra clean emissions.
第三部分 典型项目介绍

Part Three- Typical Projects Executed by the Company

1. Inner Mongolia Huaning Heat and Power Cogeneration Company Limited 2×150MW FGD
EPC Project

The project is 2×150MW units with limestone-gypsum desulfurization process adopted. Each
unit is equipped with an absorption tower. The flue gas volume at the inlet of the
desulfurization system is 680000m3/h (standard, wet base, actual O2), and the untreated flue
gas SO2 concentration is 4800/6000 mg/Nm3 (designed coal/calibrated coal). The designed SO2
emission concentration of the desulfurization system is no more than 200mg/Nm3 (standard
state, dry basis, 6%O2), the desulfurization efficiency is not less than 96.3%, and the annual
utilization hours are not less than 5500h.

The project is a traditional limestone-gypsum process, single tower single cycle, one absorber is
with four spray layers, specification of circulation is 4 x 3700 m3/h. The system mainly includes
limestone slurry system, circulation and absorption system, oxidizing air system, gypsum
dewatering system, process water system, emergency slurry discharge system, electrical and
control system etc.

2、Shanxi Zhangshan Power Generation Company Limited 2×300MW FGD & Dust Removal
Ultra-low Emission Renovation Project
The first phase #1, #2 (2×300MW) unit of the plant is equipped with 1045t/h subcritical
pulverized coal boiler produced by Wuhan Boiler Co., Ltd., and the second phase #3, #4
(2×600MW) unit is Subcritical direct air cooling unit, boiler is SG-2093/17.5-M919 subcritical
pulverized coal boiler produced by Shanghai Boiler Company. Our company is responsible for
the implementation of FGD & Dust Removal ultra-low emission renovation Project for the
second phase #3, #4 (2×600MW) units.

This project is the largest ultra-low emission renovation project ever undertaken by our
company. The project is complex in nature, including ultra-low emission renovation of
desulfurization, DeNox and dust Removal facilities, the project is of short construction period
and complex geological features.

The project adopted a single tower + turbulence efficiency device limestone-gypsum ultra-low
emission desulfurization process. According to the requirement, the sulfur content of coal is
2.40%, and the inlet SO2 concentration is 6000mg/Nm3 (standard state, dry basis, 6%O2).
Under the condition of flue gas parameters at the inlet of FGD, the desulfurization efficiency is
not less than 99.65%. The maximum concentration of SO2 at the outlet of the FGD is not more
than 17.5 mg/Nm3 (standard state, dry basis, 6% O2). The FGD inlet dust concentration is not
more than 15 mg/Nm3, and the maximum concentration of dust and gypsum at the outlet of
the desulfurization unit is not more than 2.5 mg/Nm3 (standard state, dry basis, 6% O2). Dust
concentration include fly ash, calcium salts, and other inert materials (which are suspended in
the flue gas, in solid or liquid form under standard conditions), excluding Free State water.
Under any normal operating conditions, the water content of the flue gas from the
desulfurization system outlet is not more than 15mg/Nm3 (standard, dry basis, 6% O2).

3、Datang Environment Industry Group Co., Ltd 2×1000MW FGD Project

The Datang Dongying 2×1000MW unit is a newly constructed project. The flue gas
desulfurization project adopts wet limestone-gypsum desulfurization technology and one
absorber for one unit (boiler) setting. The desulfurization efficiency is not less than 99%. Under
the condition of design coal quality (Inlet sulfur content at 2453 mg/Nm3), SO2 emission at the
outlet of FGD is not more than 25mg/Nm3 (dry basis, standard state, 6%O2); for calibrated coal
quality (Flue gas SO2 content at the inlet being 3350 mg/Nm3), SO2content at the outlet is not
more 35mg/Nm3 (dry basis, standard state, 6%O2), dust concentration is less than 5mg/Nm3.
This project is the largest ultra-low emission unit most recently undertaken by our company.
The total investment of the project is about 120 million. There will be 5 slurry circulation pumps
as per design, and under the design conditions, the circulating pump which are with flow rate
not less than 10800m3/h are selected, and the turbulent tube grid device is arranged in the
lowermost spray layer of the absorption tower to achieve the purpose of reducing the liquid-
gas ratio and improving the desulfurization efficiency.

4、Hebei Zhuozhou Jingyuan Heat Power Cogeneration Company Limited 2×350MW FGD
EPC

For the 2×350MW supercritical air-cooled coal-fired unit, we were synchronously constructing
wet limestone-gypsum single tower double-cycle desulfurization process FGD for the units
while the main plant was being constructed. The FGD was of one boiler corresponding to one
tower setting, there was no GGH, the induced draft fan and the desulfurization booster fan are
combined, no flue gas bypass is set, and the wet mill processes finished limestone product,
and the desulfurization rate is not less than 99%. Emergency slurry systems, gypsum
dewatering systems, wastewater treatment systems, and limestone pulverizing systems are of
the common system.
Under all operating conditions and design coal conditions, when the inlet concentration of the
desulfurization unit is ≤3967mg/Nm3 (standard state, dry basis, 6%O2), the SO2 concentration
at the outlet of the desulfurization unit (at the entrance of the chimney) does not exceed
20mg/Nm3. (Standard, dry basis, 6% O2), and the desulfurization efficiency is not less than
99.5%, and the FGD system can be operated in a long-term, stable and continuous manner.
This project is the first project of our company to adopt single tower double-cycle
desulfurization process. The project investment is about 150 million. After more than two
years of operation, all the parameters have reached the design requirements.

5、Ningxia Jingneng Ningdong Power Generation Co., Ltd 2×660MW BOT Project

The phase I 2×660MW supercritical coal-fired unit flue gas desulfurization unit of the company
is contracted by us in BOT mode. The flue gas discharged from the boiler is desulfurized after
being dusted by a dust remover. Each boiler is equipped with a wet limestone-gypsum double
tower double cycle desulfurization process. The design of the project is based on the
desulfurization efficiency (designed coal type) not less than 99.10%, and the sulfur dioxide
emission limit ≤ 50mg/Nm3. The total investment of the project is about 300 million. After the
completion of the project, the two units were put into operation in 2014 and 2015 respectively.
It has been in operation for about 5 years, and the system performance has reached the design
parameters.

6、Inner Mongolia Jingneng Shuangxin Power Generation Company 2×350MW FGD EPC

The project is for a power plant with newly constructed 2×350MW supercritical fluidized bed
unit. Two sets of double-tower double-cycle technology of wet limestone-gypsum flue gas
desulfurization devices with full flue gas volume treatment will be built behind the boiler. There
is no flue gas bypass and no GGH. The booster fan and the induced draft fan are combined into
one. The concentration of SO2 at the inlet of FGD is 9018mg/Nm3. Under the condition of
BMCR, the desulfurization efficiency of the desulfurization unit is not less than 99.82%, and the
sulfur dioxide emission concentration of the desulfurization unit is less than 17.5mg/Nm3
(standard condition, dry basis, 6% O2). The wet desulfurization device considers synergistic dust
removal, the comprehensive dust removal efficiency is not lower than 70% (including gypsum,
soot, etc.), and the concentration of dust at the inlet of the desulfurization device is not more
than 15 mg/Nm3 (standard condition, dry basis, 6% O2), Under the 0~100% BMCR load, the
concentration of dust at the outlet of the desulfurization device (including solid materials such
as soot and gypsum) is not more than 4.5mg/Nm3 (standard condition, dry basis, 6%O2), and
the moisture content of the flue gas at the outlet of the desulfurization unit is not more than
20mg/Nm3 (dry base). The total investment of the project is 140 million.
At present, one unit of the project has been put into operation and the operation effect is very
satisfactory. According to the DCS screen data, when only three circulating pumps are in
operation and the inlet SO2 concentration being 5168.6 mg/Nm3, the outlet concentration can
reach 5.7 mg/Nm3, proving that the desulfurization efficiency is 99.89%, which is far superior to
the designed emission index.

7、Jinneng Baode Coal Fired Power Generation Company Limited 2×660M FGD, DeNox, Dust
Removal and Wet ESP BOT Project

The Project is for BOT of environmental protection facilities of 2×660MW ultra-supercritical


low calorific value coal direct air-cooled domestically made generator set, equipped with ultra-
supercritical high-efficiency pulverized coal boiler. The wet limestone-gypsum double tower
double cycle desulfurization process is adopted. When the FGD inlet SO2 is 4282 mg/Nm3
(standard dry, 6% O2), the SO2 removal rate of the FGD device is greater than 99.2%. The FGD
outlet (at the entrance of the chimney) has a SO2 concentration of <35 mg/Nm3 (standard dry,
6% O2).
This environmental protection project including desulfurization, denitrification, dust removal
and wet ESP construction was undertaken by our company in BOT mode. The project
investment is 420 million, and the commercial operation date is expected to be May 2020.
第四部分 主要项目业绩

Part Four- Major Projects Achievements & Credentials


Item Project Capacity Scope Completion Date

Inner Mongolia Daihai Power Generation Company Limited 4×600MW


1 4×600MW DeSOx Dec 2017
unit FGD Capacity Improvement Renovation EPC Project

2 Inner Mongolia Huaning 2×150MW FGD EPC Project 2×150MW DeSOx Aug 2014

Tangshan KaiLuan Dongfang Power Generation Company Limited DeSOx,


3 2×150MW Dec 2015
2×150MW Fluidized Bed FGD & Wet ESP EPC Project Dedust

Kailuan Xiexin Power Generation Company #3 and #4 unit DeSOx,


4 2×300MW Dec 2015
(2x300MW)FGD & Wet ESP EPC Project Dedust

Taicang Port Xiexin Power Generation Company #5 Unit FGD Efficiency


5 2×300MW DeSOx Nov 2015
Enhancement Renovation Project

Langfang Huayuan Shengshi Heat Generation Company Langfa Longhe


6 2×75t/h DeSOx Dec 2015
Industry Park Heat Center FGD Project

Tianjiaan Project #5、#6 unit Integrated FGD-Dust Removal Ultra-Low


7 2×320MW DeSOx Dec 2016
Emission EPC Renovation Project
Shanxi Zhangshan Power Generation Company #3,#4 unit(600MW) DeSOx 3#:Jul 2017
8 2×600MW
FGD Ultra-Low Emission Renovation EPC Project DeNOx 4#:Sep 2017

Shentou Project Company of Datang Environment Industry Group Co.,


DeSOx、
9 Ltd, #4(500MW)unit FGD & DeNox Ultra Low Emission Renovation 2×500MW Dec 2016
DeNOx
EPC Project

Hebei Zhuozhou Jingneng Heat-Power Cogeneration Company Phase 1


10 2×350MW DeSOx Feb 2018
Super-Critical Unit FGD EPC Project

11 Ningxia Pingluo Power Plant 2×660MW Unit FGD EPC Project 2×660MW DeSOx In progress

Wanji Power Generation Company 2×330MW Unit FGD, DeNox, Dust DeSOx、
12 2×330MW Mar 2016
Removal BOT Project DeNOx

13 Inner Mongolia Jingneng Shuangxin 2×350MW Unit FGD EPC Project 2×350MW DeSOx In progress

14 Datang Dongying 2×1000MW FGD EPC Project 2×1000MW DeSOx In progress

Shenhua Shendong Power Company Limited Dianta Power plant


15 2×660MW Unit FGD, Dust Removal Integrated Ultra-Low Emission 2×660MW DeSOx May 2018
Renovation Project

Inner Mongolia Jingneng Kangbashi Heat-Power Cogeneration Co.,Ltd #1 DeSOx、


16 1×350MW June 2018
Unit FGD, DeNox &Dust Removal Integrated Renovation EPC Project DeNOx

17 Jinneng Baode 2×660MW Ultra-supercritical Low Caloric coal Fired 2×660MW DeSOx、 In progress
Power Project Environmental Protection Island EPC Project DeNOx

Wanji Holdings Graphite Product Co., Ltd Graphite Kiln Area 1-4 FGD & DeSOx、
18 Nov 2018
Dust Removal Renovation (BT) Project DeNOx
Jingneng Qinhuangdao Development Zone 2×35 KW Heat-Power
19 2×350MW DeSOx In progress
Cogeneration Plant FGD EPC Project

第五部分 现有合同清单

Part Five- LIST OF CONTRACTS IN HAND

S.No Project Name Value of Project in INR Capacity in MW Present Status


(1RMB:10.2INR)

1 Jineng Baode 2×660MW ultra-super critical 331 Cr INR 2×660MW Scheduled to commissioning on
thermal plant FGD, Denox and De-dust BOT Dec 2019
project

2 Ningxia Pingluo Thermal Power Plant 2×660MW 101 Cr INR 2×660MW In progress
FGD & De-dust EPC project

3 Inner Mongolia Jingneng Shuangxin 2×350MW 108 Cr INR 2×350MW In progress


Thermal Power Plant FGD & De-dust EPC project
4 Jingneng Qinhuangdao Development Area 2× 79 Cr INR 2×350MW In progress
350MW Thermal Power Plant FGD & De-dust EPC
project

5 Datang Dongying 2×1000MW Thermal Power 121 Cr INR 2×1000MW In progress


Plant FGD & De-dust EPC project

6 Datang Gongyi 2X660MW Thermal Power Plant 59 Cr INR 2X660MW In progress


Denox EPC project
7 Jingneng Qinhuangdao Development Area 2× 44.6 Cr INR 2×350MW In progress
350MW Thermal Power Plant Denox EPC project

8 Inner Mongolia Daihai Power Generation Phase II 24.7 Cr INR 2×600MW In progress
2×600MW Expansion and Energy Saving &
Refreshment MGGH Modification (Unit 4)

9 Delong Steel Limited Phase-III Flue Gas MGGH 3.63 Cr INR 1×130t/h In progress
EPC Project

10 Luoyang Wanji Power Generation Limited 2× 54.8 Cr INR 2×330MW In progress


330MW Flue Gas MGGH EPC project

11 Inner Mongolia Daihai Power Generation Phase 10.9 Cr INR/Year 4×600MW In progress
I&II 4×600MW O&M Project

12 Anhui Anqing Wanjiang Power Generation 5.7 Cr INR/Year 2×320MW+2× In progress


Limited 2×320MW FGD, Ash Handling and 2× 1000MW
1000MW FGD, Dedust O&M Project
第六部分 核心技术专利

Part Six- Core Technology & Patents

(1) Core process technology for atmospheric management


1. Double cycle desulfurization technology in two towers
Applicable for coal at any sulfur content, especially for smoke with SO2 concentration over
7000mg/Nm³. The technique is efficient, stable, of low investment and small footprint. SO2
concentration reduced less than 15mg/Nm³, which is 57% lower than the strictest national
standard(35mg/Nm³).
2. Double cycle desulfurization technology in one tower.
Applicable for coal of relatively high sulfur content, especially for smoke with SO2
concentration ranging from 5000-10000mg/Nm ³ .The technique is efficient, stable, of low
investment and small footprint. SO2 concentration reduced less than 15mg/Nm³, which is
57% lower than the strictest national standard(35mg/Nm³).
3. Single tower turbulence tube efficient process desulfurization technology
4. Desulfurization, denitration and dust removal integration technology.
At the main island of the absorption tower, the four units of desulphurization, denitration,
dust removal and demercuration are installed and operated at the same time. The utility
model has the advantages of low cost and little occupation, and is suitable for medium and
small coal burning boilers.
5. SCR desulfurization reactor and catalyzes efficient synergistic process technology.
By optimizing formula of SCR reactor and catalyzes, we can achieve the high coordination
of desulfurization process and catalystdesign technique, and improve the desulfurization
efficiency. The NOx concentration in smoke can be reduced to 30 mg/Nm³.
6. High efficiency dust removal and mist removal technology of composite electrode.
By combining the lower centrifugal vortex tube with the upper cathode and cathode
devices, we can reduce the concentration of dust and PM2.5 down below 2 mg/Nm³. This
method has the advantages of low cost, little occupation, short lead time and flexible usage.
(2) Core technology of catalystproducts
1. Honeycomb type SCR catalyzes.
The honeycomb hole number ranges from 15 to 35, and under the same conditions, the
concentration of NOx in the flue gas can be reduced less than 30mg/Nm³, and the using life
is up to 24000 hours.
2. Plate type SCR catalyzes.
Applicable for different size, and under the same conditions, the concentration of NOx in
the flue gas can be reduced less than 35mg/Nm³, and the using life is up to 24000 hours.
3. Regeneration type SCR catalyze
The using life can be enhanced by 20000 hours, if we recover the activity of dead
honeycomb type or plate type catalyzes, and the activity recovery rate is up to 90%.
4. Middle or low temp catalyze
Maintains efficient desulfurization in the mid or low temp conditions from 150-250℃. The
desulfurization rate is up to 75%, and the using life is up to 20000 hours. Applicable for
desulfurization process in steel plants, cement plants and glass plants.
5. Technology of catalystwaste treatment and raw material recirculation usage.
Extract TiO2 & WO3 from the catalystwaste, and make the granularity up to 1-2μm, then
they can be recycled to produce fresh and quality catalyzes.
6. Non-toxic catalyzes
A catalystnot using V2O2 as active material can be regarded harmless and no-toxic.
7. High-hole honeycomb catalyzes (50-70 holes).
A SCR catalystthat is of high efficiency and hole-numbers, and applied in internal
combustion engines and diesel engines。
(3) Core technology of soil remediation
1. Soil in situ solidification
By using physical or chemical method, we can fix or encapsulate the pollutants in dense
inert substrates. It is applicable for heavy metals and radioactive contamination, and is one
of the few in-situ remediation technologies for metal pollution.
2. Soil vapor extraction (SVE) based on VOC technology
Soil gas extraction steam extraction technology is adopted to reduce soil air pressure, the
pollutants in soil into gaseous form and is removed, it is through the physical removal of
soil volatile organic components (VOCs) is a kind of pollution remediation technology,
application of pollutants to deal with high volatility.
This technique uses the principle that solvent promotes the dissolution or transport of
contaminants in soil environment. The solvent is injected into the contaminated layer
through the head pressure, and then the liquid containing contaminants is extracted from
the soil layer for separation and sewage treatment. This technique can be divided into in-
situ and ectopic chemical elution techniques.
3. Bio remediation of microorganisms
This technique uses the principle of bio degradation and bio absorption on hazardous
pollutants in ground water and groundwater. We can activate microorganisms through
nutrients and other chemicals so that they can rapidly decompose and destroy pollutants.
Bioremediation technologies are applicable for pollutants like gasoline, fuel oil, ethanol,
ketones and so on.
(4) Core technology of device products
1. High efficiency dust removal and mist removal device of composite electrode.
Through the combination of centrifugal separation, water film dust removal and micro wet
electrostatic precipitator technology, we can satisfy that when the unit is under full load,
the dust content at absorption tower entrance is less than 30mg/Nm ³ , and dust
concentration at the absorption tower outlet is below 2mg/N m³, and SO3 and Hg ions can
also be removed.
2. Tube type, plate type wet dust removal device
Non metallic and alloy metal composite manufacturing products. The dust concentration
can be reduced to below 20mg/Nm3 by means of optimized design of the flue gas
distributor, the flushing system and the discharge system.
3. The hot catalyst type flue gas heat exchanger (MGGH) device
It can make the smoke before entering the chimney discharge, so that the flue gas
temperature increased from 55 to 70-75 degrees, to raise the flue gas emission level,
eliminate gypsum rain, and protect the chimney lining.
4. Low-low temp economizer device
It can use tail flue gas exhaust temperature, heating boiler water supply, or one or two
times the wind temperature reduction, unit power consumption of coal is about
3-5g/kwh.
(5) Core technology of intelligent control
1. SO2 ultra low emission inspection technology
The flue gas pretreatment uses a permeable tube to remove water, avoiding S2
dehydration, reduction in the home process, use of a group of permeable tubes,
instrumental analysis, and no reference gas. Double range switching: when the discharge
reaches the standard, the loose measuring range of SO is 50mg/Nm3, and the tunable laser
absorption spectrum is adopted.
2. NOx ultra low emission measurement technology
The NO detection range adopts 100mg/Nm3 to achieve precision inspection; when boiler
emissions abnormally, it will automatically switch to the appropriate range, realizing the
real-time monitoring on high concentrations of pollutants.
3. Dust, PM25 ultra-low emission measurement technology.
We continuous heat the flue gas to avoid the impact of wet smoke, and take large sampling
flow, around 50 times the sampling measurement amount. This method has the
advantages of integrated design, on-line continuous measurement, small amount of
maintenance, high sensitivity probe, and the instrument unit are used for low
concentration measurement.

Anhui Anqing Wanjiang Project


Jiangsu Fengye Technology Environmental Protection Group Ltd, Anqing branch is located
in the Laofeng Town, which is in the eastern part of Anqing City, Anhui province. The town
is about 125km from Anqing City, and it faces the Yangtze River in the south, and near to
the X001 provincial road in the north. The main business is to serve the Anhui Anqing
Wanjiang Power company’s units. We process ash slag for 2x320MW unit #1, 2 DEG
furnaces, and desulfurization and ash removal system of the entrusted operation and coal
sampling and chemical industry project operation for 2x1000MW unit #3, 4 furnaces.
Soil remediation project
The Britain shut down mine remediation project:
The total remediation amount is 2800000 m³. And the recycled materials include: 2000
tons of metal, 80000 tons of stone, 220000 tons of clay, 44000 tons of soil, 12000 of
surface soil and 90000 of biodegraded waste.
Jinze reservoir project
Jinze reservoir raw water project includs Jinze reservoir, water quality improvement project,
connecting pipe project, Minhang branch line project, SongPu pumping station
transformation and suburban branch line and other main projects. Fengye Group and
British RAW group considered the Central Bureau of the Jinze reservoir and its ecological
integrity, targeted constructed of water ecological system, improved the quality of the
aquatic ecosystem of the reservoir purification and maintenance ability. They used
nanometer bubble technology to improve water quality, and the quantity of nanometer
bubble per ml exceeded 200000. After the treatment of water containing rich oxygen,
deodorization, can effectively improve water transparency; reduce sediment organic
content, and ecological restoration of water.

Major patents
patent name description techique resourse technique level

Double tower double loop desulfurization technique can reduce the SO2 from over 7000mg/Nm³ to 15mg/Nm³ Independent R&D worldwide leading

Dingle tower double loop limestone-gypsumwet


can reduce the SO2from 5000-10000mg/Nm³ to 15mg/Nm³ Independent R&D worldwide leading
desulfurization technique

Single tower double loop desulfurization technology. can reduce the SO2 from 5000mg/Nm³ to20mg/Nm³ Independent R&D worldwide leading

SCR desulfurization reactor and catalyzes efficient can increase the denitration efficiency, and reduce the
Independent R&D worldwide leading
synergistic process technology. NOx to 30mg/Nm³

worldwide leading and


High efficiency dust removal and mistremovaldevice of
can reduce dust to 2mg/Nm³ in full load conditions Independent R&D fill the gap in the
composite electrode.
country

Desulfurization, denitration and demercuration can simultaneously process desulfurization, denitration and
Independent R&D worldwide leading
integration technology. demercuration in major tower

Denitration catalystand its produce method and has 15-60 holes and can reduce NOx to 30mg/Nm³; using life
Independent R&D worldwide leading
smoke denitration technology 24000 hours

Plate type denitration catalystand its produce method


can reduce NOx to 35mg/Nm³; using life 24000 hours Independent R&D worldwide leading
and applications

Regeneration liquid of denitration catalystandits 90% reactive the dead catalyzes, and enhances using life
Independent R&D worldwide leading
produce method and applications by 20000 hours

WO3 and V2Q3 recycling method from denitration extracts TiO2 & WO3 from the waste, and recycle them after
Independent R&D worldwide leading
catalyze processing to be 1-2 μm
Ti dioxide extracting method from denitration catalyze
can recycle TiO2 from the waste Independent R&D worldwide leading
waste

Middle and low temp catalyze remain a 75% denitration rate in 150-250℃ condition Independent R&D worldwide leading

Tube type, plate type wet dust removaldevice can reduce the dust to 2.5mg/Nm³ Independent R&D worldwide leading

Hot catalyst type flue gas heat exchanger (MGGH) can increase smoke temp from 55℃ to 75℃ to stop gypsum rain
Independent R&D worldwide leading
device & smoke white

第七部分 国际交流合作

Part Seven- International Cooperation & Communication

In February 15th , 2017, The strategic cooperation agreement signing ceremony between Fengye
Group and UK Esmolol Group was held in Jiangsu Fengye headquarters in Yangzhou. To attend the
signing ceremony of the signing: Fengye Group chairman Defu Xu, vice chairman Feng Xu, group
chief engineer Wenxuan Wang, UK Esmolol general manager Martin, assistant general manager
Junhua Xiang.

This strategic agreement, represents Fengye Group and UK Esmolol official cooperation, and the
both will carry out further the strategic cooperation in environmental protection, and will co-
develop the environmental remediation Chinese and global market.
India-China Sixth Strategic Economic Dialogue

Group Company Chairman Xu Defu was invited for the Dialogue


Sixth India-China Strategic Economic Dialogue

Vice-president & Chief engineer Mr. Wang Wenxuan, Vice-President Mr. Xu Feng presenting
Attendees pose after successful meeting

Mr. Wang Wenxuan and Mr. Xufeng communicating with Indian Friends
Communication with Korean NANO
Visit FISIA BABCOOK ENVIRONMENT, Germany
MOU Signing Ceremony, NANO
Meeting with Jinneng Group
Chairman presenting international meeting and gave speech
第八部分 资质文件附件

Part Eight-Attachments of Qualification Documents

Please see attached notarized owner certificates and patents

Attachment 1 Owner Certificates

JSFAO-11: Owner Certificate issued by Ningxia Jingneng Ningdong Power Generation


Co., Ltd 2×660MW(FGD Project)

JSFAO-12: Owner Certificate issued by Hebei Zhuozhou Jingyuan Heat-Power


Cogeneration Company Limited 2×350MW (FGD Project)
Owner Certificate issued by Luoyang Wanji 2x330MW (FGD, DeNox, Dust Removal
BOT Project)

Attachment 2 Patents

JSFAO-21 Single Tower Double Loop Desulfurization Technique Patent


JSFAO-22 Flue Gas Fairing Device Patent
JSFAO-23 Integrated FGD Island Device Patent
JSFAO-24 : An Even-distribution Turbulent Desulphurizer
JSFAO-25 : Single Tower Double Loop Desulfurization Technique Patent

公 证

(2019 )扬证民外字第 3248 号

申请人:江苏峰业科技环保集团股份有限公司,住所:江

苏省扬州市江都区邵伯镇昭关京杭村。

法定代表人:许德富,男,一九六三年八月二十一日出生,

公民身份号码: 321088196308315099 。

代理人:姚瑶,女,一九八六年四月十六日出生,公民身

份号码: 321011198604160920 。

公证事项:复印件与原件相符

兹证明前面的复印件与江苏峰业科技环保集团股份有限公

司的代理人姚瑶出示给本公证员的《业主证明信》的原件相符。

中华人民共和国江苏省扬州市扬州公证处

/,\、:τ 口
A1-lt 贝

十六日

I V52032 I 72
Ningxia Jingneng Ningdong Power Generation Co., Ltd

End-User Certificate
Dated: A旦W!J.,2019
To Whom It May Concern,

Ningxia Jingneng Ningdong Power Generation C吼叫 Ltd (Shuijiangou Power Plant in Zone A of
Linhe Industrial Park, Ningdong Town, Lingwu city, Ningxia) 2x660MW coal-fired unit flue gas
desulphurization franchise contract (including EPC implementation) is designed, constructed and
contracted by Jiangsu Fengye Technology and Environmental Protection Group Co., Ltd (address:
Jinghang Village, Shaobo Town, Jiangdu, Jia吨su Province, zip code 225263) The design flue

g出 flow is Z豆豆主豆豆 Nm3/h <standard state, wet basis, ill上%02 】, adopting limestone-

gypsum desulphurization system, desulphurization efficiency can be up to~旦i_o/o. Contract


number NDFD/FWHT-2012-04 7.
Since operation in November 2011 (date), this desulphurization system has been operating
stably and meets the d_esign requirements in all indicators without any problem
Sign矶ire: ...-:,磊莽叮
Name: Liyanjun 1

Designation: Deputy general manager


NOTARIAL CERTIFICATE

(2019) YZM矶f Zi, No.3248

Applicant: Jiangsu Fengye Technology & Environment


Group Corporation Limited, address: Zhaoguan Jinghang
Village, Shaobo Town, Jiangdu District, Yangzhou City, Jiangsu
Province.
Legal Repr巳sentative: Xu De旬, male, born on August 3 1,
1963, Citizen ’ s ID Card No. 321088196308315099.
Agent: Yao Yao, female, born on April 16, 1986, Citizen ’ S
ID Card No. 321011198604160920.
Issue und巳r notarization: tru巳 and exact copy
This is to certify that the foregoing copy conforms to the
original End-User Certificate Yao Yao, the Agent of Jiangsu
Fengye Technology & Environment Group Corporation Limit巳d,
showed to me, the notary public.

Yangzhou Notary Public Office, Yangzhou City,


Jiangsu Province
The People ’ s Republic of China
Notary Public: Zhang Yan
August 26, 2019

I V520322 I 2
前公属
证章章

面证实
明和)

书张
文员

上 燕
公的
证签
在 An
JQAE LH 村叫
处名
的(
u-
nM

战露翠嚼1
把业

Date 2~1°/•t1) Receipt No //llν boob/-'/


Signatu~e and Seal of FAO 2,巧川
attested

SEEN IN THE CONSULATE.


NEJHU T

户」

OTt nR nrnuNFa UU
’’』

M叫
A问

E」


E』
乓M

EL
F』

r-O R TH E CONTENT

公 证

(2019 )扬证民外字第 3250号

申请人:江苏峰业科技环保集团股份有限公司,住所:江

苏省扬州市江都区邵伯镇昭关京杭村。

法定代表人:许德富,男,一九六三年八月三十一日出生,

公民身份号码: 321088196308315099 。

代理人:姚瑶,女,一九八六年四月十六日出生,公民身

份号码: 321011198604160920 。

公证事项:复印件与原件相符

兹证明前面的复印件与江苏峰业科技环保集团股份有限公

司的代理人姚瑶出示给本公证员的《业主证明信》的原件相符。

中华人民共和国江苏省扬州市扬州公证处

/,\.、 .-i: 口
A 丑t 贝

十六日
I V52032 I 95
Hebei Zhuozhou Jingyuan Thermal Power Co., Ltd

End嗣User Certificate
Dated: 3 August 2019
To Whom It May Concern,
Hebei Jingneng Zhuozhou Thermal Power Plant project (located at No. 18,Ziqiang Street,
Zhuozhou city, Hebei Province, zip code 072750) desulphurization system EPC project
for phase 1 supercritical unit is designed, constructed and contracted by Jiangsu Fengye
Technology and Environmental Protection Group Co., Ltd (address: Jinghang Village,
Shaobo Town, Jiangdu, Jiangsu Province, zip code 225263).
The design flue gas flow is ~旦旦Nm3/s <standard state, dry basis,豆%02 l , adopting
limestone-gypsum desulphurization system, desulphurization effi ciency can be up
to 99.5 %.
Buyer’ s con仕act number JYRD-2014-SG-005, contractor's contract number
FYKH2014-JYTL-O 1.
Since operation in Februarv 2018 (date), this desulphurization system has been
operating stably and meets the design requirements in all indicators without any problem.
Signature: L;吁〈主'(,J.e,作
Name: Liang Guojie
Designation: Manager of Engineering Technology Department

lectric co., ltd.


NOTARIAL CERTIFICATE

(2019) YZM矶f Zi, No.3250

Applicant: Jiangsu Fengye Technology & Environment


Group Corporation Limited, address: Zhaoguan Jinghang
Village, Shaobo Town, Jiangdu District, Yangzhou City, Jiangsu
Province.
Legal Representative: Xu De旬, male, born on August 31,
1963, Citizen ’ s ID Card No. 321088196308315099.
Agent: Yao Yao, female, born on April 16, 1986, Citizen ’ S
ID Card No. 321011198604160920.
Issue under notarization: true and exact copy
This is to certify that the foregoing copy conforms to the
original End-User Certificate Yao Yao, the Agent of Jiangsu
Fengye Technology & Environment Group Corporation Limit巳d,
showed to me, the notmγpublic.

Yangzhou Notary Public Office, Yangzhou City,


Jiangsu Province
The People ’ s Republic of China
Notary Public: Zhang Yan
August 26, 2019

I V52032208
证青十青+

前公属
面证实

公的
文员
书 张

证签
上燕
牛々

日王町,、
问川叶
JOArrvr

Jn HH
处名
的(
门μ ’ nμ-
•v

11111111 /Ill 1111111111111


8639577

Dat~O '(’ 们 Receipt No 111 立在如Obf-1-i·


Signature and Seal of FAO 丁t 由吨叮 4 吨
attested ..J

SEEN IN THE CONSULATE.


CONSULATE NOT RESPONSIBLE
N此TA
Consulate General of India
FOR THE CONTENT
Single Tower Double Loop Desulfurization Technique Patent
Flue Gas Fairing Device Patent
Integrated FGD Island Device Patent
An Even-distribution Turbulent Desulphurizer
Single Tower Double Loop Desulfurization Technique Patent

You might also like