Sample Risk Assessment
Sample Risk Assessment
Sample Risk Assessment
Project Name:
Site Name:
Project No: Date
The following table details the Generic Risk Assessments deemed to be applicable to ANDER-TEKNIX ENGINEERING LTD, activities, those
particular to this project have been indicated as being applicable: -
Additional hazards created by the activities of the Client, Principal Contractor or Contractors will be assessed where they coincide with our
activities.
Z:\\H&S\Atdocs\risk
Page 2 of 30
Schedule of Risk Assessments (RA)
Z:\\H&S\Atdocs\risk
Page 3 of 30
RA 01 – Setting–up Site Facilities Form A-T RA: 01
Collapse of 4 6 24 2 6 12
structure or lifting
equipment
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 4 of 30
RA 02 – Refurbishment Form A-T RA: 01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 5 of 30
RA 03 – Storage of Materials Form A-T RA: 01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 6 of 30
RA 04 – Work at Height Form A-T RA 01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 7 of 30
RA 05 – Use of Ladders Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 8 of 30
RA 06 – Use of Mobile Towers and Aluminium Scaffolds Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 9 of 30
RA 07 – Use of Mobile Working Platforms Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 10 of 30
RA 08 – Manual Handling Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 11 of 30
RA 09 – Use of Hand Tools Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 12 of 30
RA 10 – Use of Portable Electrical Tools Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 13 of 30
RA 11 – Use of Disc Cutters and Abrasive Wheels Form A-T RA:015
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 14 of 30
RA 12 – Use of Cartridge Operated Tools Form A-T RA:01
Cartridge tools shall only be used with the permission of the Client or
Principal Contractor and where there is no risk of fire or explosion.
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 15 of 30
RA 13 - Work in Confined Spaces Form A-T RA:01
Excessive heat 4 4 16 Only operatives trained in Work in Confined Spaces to be allowed enter 2 6 12
confined spaces.
Drowning 4 6 24 2 6 12
Rescue equipment to be provided and all operatives to ware safety harness,
helmets and full protective equipment PPE.
Falls down shafts 4 6 24 2 6 12
A Safe System of Work & Permits to Work procedures to be used to control
Evacuation of sick / 4 6 24 the complete operation. 2 6 12
injured operative
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 16 of 30
RA 14 – Working with Risk of Falling Materials Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 17 of 30
RA15 – Working in the Vicinity of Underground Services Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 18 of 30
RA 16 – Working On or Near Fragile Roof Materials Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 19 of 30
RA 17 – Work with Asbestos Containing Materials (ACMs) Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 20 of 30
RA 18 – Welding Operations / Hot Works Form A-T RA:01
All hot works shall stop 1 hour before the end of day when a final safety
inspection shall be carried out.
See also RA11 for the use of disc cutters and abrasive wheel
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 21 of 30
RA 19 – Installation of Trunking, Tray and Conduit Systems Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 22 of 30
RA 20 – Protection of Electrical Supplies, Installation & Equipment Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 23 of 30
RA 21 – Cable Pulling Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 24 of 30
RA 22 – Electrical Testing & Commissioning Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 25 of 30
RA 23 – Disposal of Waste Materials Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 26 of 30
RA 24 – Fumes Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 27 of 30
RA 25 – Noise Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 28 of 30
RA 26 - Dust Form A-T RA:01
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 29 of 30
RA Form A-T RA:02
Likelihood of Harm Occurring Severity of Injury or Harm Risk Assessment and Action to be taken
H M L H M L High risk = > 24. Eliminate. Discuss with Manager
6 4 2 6 4 2 Medium Risk = 12 – 24. Reduce risk, change work programme
Fatal / Sprain / strain
Probable Possible Remote Cuts / bruises Low Risk = <12. Reduce as far as is reasonably practicable
Major / over 3 days
Z:\\H&S\Atdocs\risk
Page 30 of 30