Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

(v4.

03)

ArcelorMittal Composite Bridge Predesign

Preliminary design software for composite bridges

PRELIMINARY DESIGN NOTE

Company : ALDOR
User name : BOTA Adrian
Project name : POD 2 Resita
Project reference : C299
Comment : Podul TRIAJ
Date : 07.08.2018
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

All the preliminary design notes done by our company and/or by any other subsidiaries of the ARCELORMITTAL group of
our choice are based on the information received from the Customer. These preliminary design notes are given for guidance
only. As such, they do not commit our company and/or any other subsidiary of the ARCELORMITTAL group to the
achievement of a result expected by the Customer and/or any third person. These preliminary design notes cannot replace
all the preliminary design notes which shall be done by an external engineering office chosen by the Customer. Our
company and/or any other subsidiary of the ARCELORMITTAL group cannot be held liable for any loss or damage, directly
or indirectly sustained as a result of the use of the preliminary design notes done by our company and\or by any other
subsidiaries of the ARCELORMITTAL group, whatever the origin of the damage.

User name : BOTA Adrian


Date : 07.08.2018 Page 1 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

REACTIONS AT SUPPORTS UNDER PERMANENT LOADING

All reaction forces are displayed in kN

Loading : Self-weight - FZ = 5056.64 kN

C0 C1
Line 1 183.16 183.17
Line 2 180.19 180.18
Line 3 180.16 180.15
Line 4 180.16 180.17
Line 5 180.16 180.16
Line 6 180.16 180.16
Line 7 180.16 180.16
Line 8 180.15 180.16
Line 9 180.17 180.16
Line 10 180.16 180.16
Line 11 180.17 180.17
Line 12 180.16 180.15
Line 13 180.18 180.18
Line 14 183.16 183.17
 2528.31 2528.33

Loading : Overhang weight - FZ = 701.91 kN

C0 C1
Line 1 121.66 121.66
Line 2 5.39 5.39
Line 3 31.27 31.27
Line 4 20.45 20.45
Line 5 20.03 20.02
Line 6 18.19 18.19
Line 7 17.33 17.32
Line 8 16.77 16.77
Line 9 16.66 16.67
Line 10 16.84 16.84
Line 11 18.18 18.18
Line 12 17.63 17.63
Line 13 32.60 32.60
Line 14 -2.04 -2.04
 350.96 350.95

User name : BOTA Adrian


Date : 07.08.2018 Page 2 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

Reactions at supports (continued)

All reaction forces are displayed in kN

Loading : SDL1 - FZ = 1113.43 kN

C0 C1
Line 1 240.14 240.13
Line 2 -38.67 -38.69
Line 3 48.72 48.72
Line 4 29.08 29.08
Line 5 32.64 32.64
Line 6 30.97 30.97
Line 7 30.60 30.59
Line 8 30.11 30.11
Line 9 29.87 29.88
Line 10 29.63 29.63
Line 11 30.42 30.42
Line 12 27.81 27.81
Line 13 42.24 42.25
Line 14 -6.82 -6.82
 556.73 556.70

Loading : Increased SDL1 - FZ = 1503.07 kN

C0 C1
Line 1 324.18 324.18
Line 2 -52.22 -52.23
Line 3 65.76 65.77
Line 4 39.26 39.25
Line 5 44.06 44.06
Line 6 41.80 41.80
Line 7 41.30 41.30
Line 8 40.62 40.65
Line 9 40.33 40.34
Line 10 39.99 40.00
Line 11 41.07 41.06
Line 12 37.54 37.54
Line 13 57.03 57.03
Line 14 -9.21 -9.21
 751.52 751.54

User name : BOTA Adrian


Date : 07.08.2018 Page 3 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

Reactions at supports (continued)

All reaction forces are displayed in kN

Loading : Reduced SDL1 - FZ = 1009.91 kN

C0 C1
Line 1 242.59 242.59
Line 2 -43.38 -43.38
Line 3 45.76 45.75
Line 4 25.51 25.51
Line 5 29.08 29.07
Line 6 27.30 27.30
Line 7 26.87 26.87
Line 8 26.33 26.34
Line 9 26.07 26.07
Line 10 25.76 25.76
Line 11 26.69 26.69
Line 12 23.38 23.38
Line 13 41.13 41.14
Line 14 -18.14 -18.14
 504.96 504.95

Loading : SDL2 - FZ = 197.65 kN

C0 C1
Line 1 -7.00 -7.00
Line 2 4.29 4.29
Line 3 2.50 2.50
Line 4 3.03 3.03
Line 5 3.01 3.01
Line 6 3.14 3.14
Line 7 3.28 3.28
Line 8 3.49 3.49
Line 9 3.63 3.63
Line 10 4.29 4.29
Line 11 2.64 2.64
Line 12 10.76 10.75
Line 13 -27.34 -27.34
Line 14 89.09 89.09
 98.83 98.82

User name : BOTA Adrian


Date : 07.08.2018 Page 4 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

ENVELOPES OF THE REACTIONS AT SUPPORTS UNDER LIVE LOADING

All reaction forces are displayed in kN

Loading : Load model 1 UDL - Maximum reaction forces

C0 C1
Line 1 47.86 47.86
Line 2 64.16 64.16
Line 3 40.36 40.37
Line 4 41.15 41.16
Line 5 42.37 42.37
Line 6 42.47 42.47
Line 7 42.57 42.57
Line 8 42.84 42.83
Line 9 42.19 42.18
Line 10 40.23 40.23
Line 11 36.94 36.95
Line 12 55.26 55.27
Line 13 34.21 34.21
Line 14 226.74 226.74

Loading : Load model 1 UDL - Minimum reaction forces

C0 C1
Line 1 -91.28 -91.28
Line 2 0.02 0.02
Line 3 0.02 0.02
Line 4 0.03 0.03
Line 5 0.03 0.03
Line 6 0.03 0.03
Line 7 0.03 0.03
Line 8 0.03 0.03
Line 9 0.03 0.03
Line 10 0.03 0.03
Line 11 0.03 0.03
Line 12 0.03 0.03
Line 13 -28.37 -28.36
Line 14 0.03 0.03

User name : BOTA Adrian


Date : 07.08.2018 Page 5 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

Reactions at supports (continued)

All reaction forces are displayed in kN

Loading : Load model 1 TS - Maximum reaction forces

C0 C1
Line 1 61.70 61.67
Line 2 100.53 100.59
Line 3 106.23 97.14
Line 4 156.89 134.59
Line 5 77.65 77.65
Line 6 156.09 133.25
Line 7 172.96 151.37
Line 8 127.71 120.10
Line 9 132.06 119.88
Line 10 105.65 104.79
Line 11 163.27 142.34
Line 12 107.50 102.55
Line 13 97.24 88.38
Line 14 374.48 363.34

Loading : Load model 1 TS - Minimum reaction forces

C0 C1
Line 1 -140.10 -140.21
Line 2 1.81 1.47
Line 3 1.92 1.56
Line 4 2.59 2.11
Line 5 2.62 2.14
Line 6 2.64 2.16
Line 7 2.64 2.15
Line 8 2.64 2.15
Line 9 2.60 2.12
Line 10 2.65 2.16
Line 11 2.28 1.86
Line 12 2.66 2.17
Line 13 -63.92 -49.10
Line 14 2.63 2.14

User name : BOTA Adrian


Date : 07.08.2018 Page 6 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

Reactions at supports (continued)

All reaction forces are displayed in kN

Loading : Load on footways - Maximum reaction forces

C0 C1
Line 1 209.45 209.45
Line 2 -0.07 -0.07
Line 3 25.56 25.56
Line 4 7.61 7.61
Line 5 10.37 10.37
Line 6 8.96 8.96
Line 7 8.63 8.63
Line 8 8.21 8.21
Line 9 8.11 8.11
Line 10 7.61 7.61
Line 11 9.89 9.89
Line 12 1.58 1.58
Line 13 44.27 44.27
Line 14 -0.21 -0.21

Loading : Load on footways - Minimum reaction forces

C0 C1
Line 1 0.25 0.25
Line 2 -55.73 -55.73
Line 3 0.03 0.03
Line 4 -0.73 -0.73
Line 5 -0.05 -0.05
Line 6 -0.12 -0.12
Line 7 -0.05 -0.05
Line 8 -0.04 -0.04
Line 9 -0.02 -0.02
Line 10 -0.01 -0.01
Line 11 0.01 0.01
Line 12 -0.17 -0.17
Line 13 0.10 0.10
Line 14 -90.81 -90.81

User name : BOTA Adrian


Date : 07.08.2018 Page 7 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM
ALDOR
Project name : POD 2 Resita
ArcelorMittal Composite Bridge Predesign Project reference : C299
(v4.03)
Comment : Podul TRIAJ

ENVELOPES OF THE REACTIONS AT SUPPORTS UNDER CHARACTERISTIC SLS COMBINATIONS

All reaction forces are displayed in kN

Maximum reaction forces

C0 C1
Line 1 857.24 857.21
Line 2 311.14 311.19
Line 3 441.61 432.54
Line 4 445.52 423.21
Line 5 373.52 373.51
Line 6 447.24 424.39
Line 7 462.78 441.18
Line 8 416.51 408.93
Line 9 419.90 407.72
Line 10 391.72 390.88
Line 11 448.20 427.27
Line 12 409.80 404.86
Line 13 400.49 391.62
Line 14 862.08 850.96

Minimum reaction forces

C0 C1
Line 1 309.18 309.09
Line 2 106.04 105.69
Line 3 261.65 261.28
Line 4 231.34 230.87
Line 5 234.91 234.42
Line 6 231.40 230.92
Line 7 230.29 229.80
Line 8 229.39 228.92
Line 9 229.15 228.68
Line 10 229.73 229.23
Line 11 229.98 229.56
Line 12 234.52 234.03
Line 13 134.36 149.18
Line 14 200.24 199.76

User name : BOTA Adrian


Date : 07.08.2018 Page 8 / 11
E:\ACOBRI\ACOBRI 4\Rulate ver 4\1 HEB700.APM