Professional Documents
Culture Documents
SJ-20140318142747-008-ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide - 615812
SJ-20140318142747-008-ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide - 615812
SJ-20140318142747-008-ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide - 615812
ZTE CORPORATION
100
Address: NO. 55 Hi-tech Road South ShenZhen P.R.China 518057
Tel : +86-755-26771900
Technical Support Website: http://support.zte.com.cn 550
1050
1050
Email: support@zte.com.cn
4-Ø14 377
500
377
CONTENTS
安装孔
Safety Precautions Equipment Installation
550 Unit: mm
Related Documentation 1. Installing the Cabinet
2. Connecting Supervision Signal Cables 600
80
Structure and Components
3. Installing Battery Packs Base
4. Installing Battery Temperature Sensors The following diagram shows how to install an expansion bolt.
Appendix 5. Connecting PE/AC Input Cables 600 600 Vacuum
A Removing a Rectifier 6. Connecting DC Output Cables Cleaner
7. Performing Electrical Check Internal Structure of a Power Cabinet Unit: mm
B Installing a Rectifier Hammer
C Removing the CSU 1 2 Drill Nut
D Installing the CSU Expansion
Bolt Plain Spring
Washer Washer
1 2
ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide
2 . Install the cabinet to the brackets. 2 Connecting Supervision Signal Cables 2. 3 Connecting Communication Cables
The signal interfaces are located in the SIB board of the SIU. Based on the actual Based on the actual requirements for supervision and networking, refer to the
requirements for supervision and alarming, connect signal cables to corresponding following table and connect communication cables to corresponding interfaces.
interfaces.
Interface of SIB Board
Locating of Interface in the SIB Board Label Interface Description
Temperature Temperature
Battery2
+5V
2
1-NC
1 2 3 4 5 6
2. 4 Connecting Sensor Cables
1
2-NC X8 Refer to the following table and connect sensor cables to corresponding interfaces
2-COM +5V
Battery1
(components in the following table are optional).
2
Brackets 3-NO T-B1
1
3-COM Interface of SIB Board
X7
X9
Temperature
+5V Label Interface Description
2
Ambient
4-NO
1 2 3 4 5 6
T-E
1
4-COM X13 In-relay 1-4 and door magnet alarm Pin 5, 6 are corresponding to door magnet
5-NO X6 alarm, be used to connect a door sensor.
5-COM WATER
1 2 3 4
X4 Environment humidity Connects to an ambient humidity sensor.
6-NO AGND
Alarm
Flood
6-COM +5V X5 Flood alarm Connects to a flood sensor.
X10 VW
X6 Environment temperature Connects to an ambient temperature sensor.
X5
X7 Temperature of battery pack 1 Connects to the temperature sensor for
SMOKE GND battery pack 1.
Detection
1 2 3
1 2 3
Humidity
Smoke
Alarm
48VP HUM X8 Temperature of battery pack 2 Connects to the temperature sensor for
48V- +5V battery pack 2.
Installing the Cabinets in Overlay Mounting Mode X11 X4
Online 1,2
BATT2 X11 Smog alarm Connects to a smog sensor.
Battery
A1
RS485
2
Com2
BATT1 B1 X12 Battery online 1, 2 Connects to with the negative pole of
1
Steps: X12 batteries, detecting whether the batteries are
X3 online.
1.Put a thickness of the glass glue on the top fo the cabinet(PC8910A). GND
DOOR
1 2 3 4 5 6
1 2 3
RS232
2.Move the cabinet on the other cabinet(PC8910A) and tighten the expansion
Com
48VP TXD
bolts. S4 RXD
S3 X2
3 Installing Batteries
S2 A0
RS485
Com1
2
S1
B0
The power cabinet can be connected to two battery packs. Each Power cabinet can be
installed with one battery pack, which consists of four 12 V storage batteries connected
1
X13
X1 in series. You need to obey the following correspondence when installing the storage
batteries.
2. 1 Connecting Output Relay Cables Battery circuit breaker
48 V Battery pack 1 48 V Battery pack 2
Steps: GND GND
- 48 V
1 . Connect cables to input relay interfaces in accordance with the following table. 4×12 V
2 . (Optional) After starting the CSU, refer to the “Setting the Level and Output Relay
for an Alarm” section in the Commissioning Guide, set the attributes of alarms
correctly. Positive and negative battery cables must be connected to the corresponding
Interface of SIB Board terminals. Failure to comply can result in damage to the equipment.
Ensure that the battery cables are properly connected to avoid short circuit or
X13 In-relay 1, 2, 3,4 & door Pin 1-4 are corresponding to 4 in-relays. The
magnet alarm user can customize the in-relays’ name, grade
and state.
The default value of input relays’ “State” is
“Close” and “Grade” is “Mask”.
3 4 5
ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide
GND L-PE If the buzzer does not sound, there is no short circuit fault. The
electrical connection is qualified.
An alarm sound given by the multimeter indicates that there is a
L-N short circuit. Locate any short circuit and eliminate it before
48 V Battery pack 1
PE N proceeding to the next step.
L
AC Input AC SPD
Example: Check for short circuit between L and N.
b
6 Connecting DC Output Cables Multimeter
Ensure that all power supply is removed prior to performing the check. Failure to
5. 1 Connecting PE Cable comply can result in damage to the multimeter.
GND
Multimeter
GND
PE busbar on site
Red probe
1 2 3 4 5 6 1 2 3
Turn the knob
DC SPD LLVD1 BLVD to the buzzer scale
Black probe
6 7 8
ZXDU48 H002 (V5.0) DC Power System Quick Installation Guide
Check criterion of terminal voltage of the battery pack is shown in the table below.
Pull out the CSU.
Battery Touching Point Terminal Check Criterion
Pack Voltage B Installing a Rectifier
Battery pack Black probe: Positive value Rectifier model: ZXD1500 V5.0
Negative pole of The electrical connection is qualified.
BATT1 connection
terminal.
Negative value During transportation, internal components may become loose. If there is any D Installing the CSU
It indicates that the positive and sound inside the rectifiers during installation, contact ZTE Corporation for
Red probe: GND negative battery cables are connected maintenance or replacement. CSU model: CSU520B
busbar reversely.
A polarity connection fault may cause
damage to the device. If there is a Verify that the rectifier is installed in position and the bolts are tightened. Failure to When installing the CSU to the slot, never press the display, indicators or interfaces in
polarity connection fault, uninstall a comply can result in damage to the rectifier or even fire because of heating. case the equipment might be damaged.
connection plate in the battery pack,
and modify the connections of battery
cables. Steps:
1 . Remove the film or other obstacles (if any) from the ventilation holes. Failure to 1 2
comply can result in damage to the rectifier because of heating.
Example: Check the terminal voltage of battery pack 1. 2 . Install the rectifier to the slot.When installing the rectifier to the slot, never press the
fan outlet, buttons or indicators in case the equipment might be damaged.
Multimeter
GND
a b
Push the rectifier. Push the CSU.
Pull the handle upwards.
Black probe 1 2
Red probe Turn the knob to
BATT1 the DC voltage scale. 3
9 10 11