SAND BED
FOOTING
1 F1 34 Cum 3.600 4.30 0.30 158
2 F2 21 Cum 2.850 3.15 0.30 57
SUB TOTAL 214
PCC
FOOTING
1 F1 34 Cum 3.600 4.30 0.15 79
2 F2 21 Cum 2.850 3.15 0.15 28
RR MASONRY
3 PB 1 4 Cum 6.635 1.10 0.15 4
4 PB 1 4 Cum 6.82 1.10 0.15 5
5 PB 1 4 Cum 7.10 1.10 0.15 5
6 PB 2 2 Cum 7.10 1.10 0.15 2
7 PB 1 24 Cum 7.27 1.10 0.15 29
8 PB 2 12 Cum 7.27 1.10 0.15 14
9 PB 1 4 Cum 7.47 1.10 0.15 5
10 PB 2 2 Cum 7.47 1.10 0.15 2
PLINTH BEAM
11 PB 1 4 Cum 6.635 0.50 0.10 1
12 PB 1 4 Cum 6.82 0.50 0.10 1
13 PB 1 4 Cum 7.10 0.50 0.10 1
14 PB 2 2 Cum 7.10 0.50 0.10 1
15 PB 1 24 Cum 7.27 0.50 0.10 9
16 PB 2 12 Cum 7.27 0.50 0.10 4
17 PB 1 4 Cum 7.47 0.50 0.10 1
18 PB 2 2 Cum 7.47 0.50 0.10 1
GRADE SLAB
19 GS 1 125.08 30.6 0.1 383
SUB TOTAL 577
REINFORCEMENT STEEL
QTY in MT
TOTAL
8mm 10mm 12mm 16mm 20mm 25mm 32mm
FOOTING
3.012 0.860 8.862 0.000 0.000 0.000 0.000 12.734
PEDESTAL
3.337 0.000 2.372 0.000 0.000 0.000 0.000 5.343
COLUMN
0.663 0.000 0.958 1.622 0.000 0.000 0.000 3.243
PLINTH BEAM
1.851 0.000 0.935 4.856 0.000 1.276 0.000 8.918
GRADE SLAB
65.810 0.000 0.000 0.000 0.000 0.000 0.000 65.810
TOTAL REINFORCEMENT STEEL 96.048 MT
RCC- M20
FOOTING
1 F1 34 Cum 3.300 4.00 0.55 246.84
2 F2 21 Cum 2.550 2.85 0.50 76.31
PLINTH BEAM
11 PB 1 4 Cum 6.635 0.30 0.45 4
12 PB 1 4 Cum 6.82 0.30 0.45 4
13 PB 1 4 Cum 7.10 0.30 0.45 4
14 PB 2 2 Cum 7.10 0.30 0.45 2
15 PB 1 24 Cum 7.27 0.30 0.45 24
16 PB 2 12 Cum 7.27 0.30 0.45 12
17 PB 1 4 Cum 7.47 0.30 0.45 4
18 PB 2 2 Cum 7.47 0.30 0.45 2
GRADE SLAB
19 GS 1 Cum 125.08 30.6 0.15 574
VDF FLOORING
1 Cum 125.08 30.6 0.075 287
CUT LINTEL
46 Cum 2.23 0.2 0.2 4
SUB TOTAL 1239
RCC- M25
PEDESTAL
1 P1 30 Cum 0.530 1.20 1.12 21 1
2 P2 4 Cum 0.680 1.20 1.12 4
3 P3 15 Cum 0.530 0.83 1.12 7
4 P4 2 Cum 0.680 0.83 1.12 1
5 P5 4 Cum 0.530 0.90 1.12 2
COLUMN
6 C1 30 Cum 0.530 0.20 3.05 10
7 C2 4 Cum 0.200 1.20 3.05 3
8 C3 15 Cum 0.530 0.20 3.05 5
9 C4 2 Cum 0.680 0.20 3.05 1
10 C5 4 Cum 0.530 0.20 3.05 1
SUB TOTAL 55
SHUTTERING
FOOTING
1 F1 34 Cum 3.300 4.00 0.55 273.02
2 F2 21 Cum 2.550 2.85 0.50 113.40
PLINTH BEAM
1 PB 1 4 Cum 6.635 0.30 0.45 24
2 PB 2 2 Cum 6.82 0.30 0.45 12
3 PB 1 24 Cum 7.10 0.30 0.45 153
4 PB 2 12 Cum 7.10 0.30 0.45 77
5 PB 1 4 Cum 7.27 0.30 0.45 26
6 PB 2 2 Cum 7.27 0.30 0.45 13
7 PB 1 4 Cum 7.47 0.30 0.45 27
8 PB 1 4 Cum 7.47 0.30 0.45 27
PEDESTAL
1 P1 30 Cum 0.530 1.20 2.52 262
2 P2 4 Cum 0.680 1.20 2.52 38
3 P3 15 Cum 0.530 0.83 2.52 103
4 P4 2 Cum 0.680 0.83 2.52 15
5 P5 4 Cum 0.530 0.90 2.52 29
COLUMN
6 C1 30 Cum 0.530 0.20 3.05 134
7 C2 4 Cum 0.200 1.20 3.05 34
8 C3 15 Cum 0.530 0.20 3.05 67
9 C4 2 Cum 0.680 0.20 3.05 11
10 C5 4 Cum 0.530 0.20 3.05 18
SUB TOTAL 1455
RR MASONRY
PLINTH BEAM
1 PB 1 4 Cum 6.635 0.80 0.75 16
2 PB 2 2 Cum 6.82 0.80 0.75 8
3 PB 1 24 Cum 7.10 0.80 0.75 102
4 PB 2 12 Cum 7.10 0.80 0.75 51
5 PB 1 4 Cum 7.27 0.80 0.75 17
6 PB 2 2 Cum 7.27 0.80 0.75 9
7 PB 1 4 Cum 7.47 0.80 0.75 18
8 PB 1 4 Cum 7.47 0.80 0.75 18
SUB TOTAL 239
BLOCK WORK
BLOCK WORK
1 4 Cum 6.635 0.20 3.00 16
2 4 Cum 6.82 0.20 3.00 16
OUTER WALL
3 OUTER WALL 4 Cum 7.10 0.20 3.00 17
4 24 Cum 7.27 0.20 3.00 105
5 4 Cum 7.47 0.20 3.00 18
6 1 Cum 13.8 0.2 3.00 8
MACHNERY SHED
7 1 Cum 13.9 0.2 3.00 8
8 3 Cum 7.27 0.2 3.00 13
QUALITY TESTING ZONE
9 1 Cum 13.985 0.2 3.00 8
10 2 Cum 7.27 0.2 3.00 9
BUFFING ZONE
11 2 Cum 13.985 0.2 3.00 17
12 2 Cum 7.27 0.2 3.00 9
PACKING & DISPATCH
13 1 Cum 13.985 0.2 3.00 8
SUB TOTAL 253
BLOCK WORK- DEDUCTIONS
1 32 Cum 1.22 0.20 1.83 14 WINDOW
OUTER WALL ROLLING
2 1 Cum 3.00 0.20 3.00 2
SHUTTERE
3 4 Cum 1.22 0.20 1.83 2 WINDOW
MACHNERY SHED
4 1 Cum 1.83 0.20 2.10 1 DOOR
5 4 Cum 1.22 0.20 1.83 2 WINDOW
QUALITY TESTING ZONE
6 1 Cum 1.83 0.20 2.10 1 DOOR
7 2 Cum 1.22 0.20 1.83 1 WINDOW
BUFFING ZONE
8 1 Cum 1.83 0.20 2.10 1 DOOR
9 4 Cum 1.22 0.20 1.83 2 WINDOW
PACKING & DISPATCH
10 1 Cum 1.83 0.20 2.10 1 DOOR
SUB TOTAL 25
MS WORKS
WINDOW GRILLS
1 OUTER WALL 32 Sqm 1.22 - 1.83 71 WINDOW
2 MACHNERY SHED 4 Sqm 1.22 - 1.83 9 WINDOW
3 QUALITY TESTING ZONE 4 Sqm 1.22 - 1.83 9 WINDOW
4 BUFFING ZONE 2 Sqm 1.22 - 1.83 4 WINDOW
5 PACKING & DISPATCH 4 Sqm 1.22 - 1.83 9 WINDOW
SUB TOTAL 103
DOORS
6 MACHNERY SHED 1 Sqm 1.83 - 2.10 4 DOOR
7 QUALITY TESTING ZONE 1 Sqm 1.83 - 2.10 4 DOOR
8 BUFFING ZONE 1 Sqm 1.83 - 2.10 4 DOOR
9 PACKING & DISPATCH 1 Sqm 1.83 - 2.10 4 DOOR
SUB TOTAL 15
ROLLING SHUTTER
ROLLING
1 OUTER WALL 1 Sqm 3.00 - 3.00 9
SHUTTER
SUB TOTAL 9
uPVC WINDOW
WINDOW
1 OUTER WALL 32 Sqm 1.22 - 1.83 71 WINDOW
2 MACHNERY SHED 4 Sqm 1.22 - 1.83 9 WINDOW
3 QUALITY TESTING ZONE 4 Sqm 1.22 - 1.83 9 WINDOW
4 BUFFING ZONE 2 Sqm 1.22 - 1.83 4 WINDOW
5 PACKING & DISPATCH 4 Sqm 1.22 - 1.83 9 WINDOW
SUB TOTAL 103
INTERNAL PLASTER - 12MM
WALL
1 4 Sqm 6.635 - 3.00 80
2 4 Sqm 6.82 - 3.00 82
3 OUTER WALL 4 Sqm 7.10 - 3.00 85
4 24 Sqm 7.27 - 3.00 523
5 4 Sqm 7.47 - 3.00 90
6 2 Sqm 13.8 - 3.00 83 BOTH SIDE
MACHNERY SHED
7 2 Sqm 13.9 - 3.00 83 BOTH SIDE
8 6 Sqm 7.27 - 3.00 131 BOTH SIDE
QUALITY TESTING ZONE
9 2 Sqm 13.985 - 3.00 84 BOTH SIDE
10 4 Sqm 7.27 - 3.00 87 BOTH SIDE
BUFFING ZONE
11 4 Sqm 13.985 - 3.00 168 BOTH SIDE
12 4 Sqm 7.27 - 3.00 87 BOTH SIDE
PACKING & DISPATCH
13 2 Sqm 13.985 - 3.00 84 BOTH SIDE
SUB TOTAL 1667
WALL- DEDUCTIONS
1 32 Sqm 1.22 - 1.83 71 WINDOW
OUTER WALL ROLLING
2 1 Sqm 3.00 - 3.00 9
SHUTTERE
3 8 Sqm 1.22 - 1.83 18 WINDOW
MACHNERY SHED
4 2 Sqm 1.83 - 2.10 8 DOOR
5 8 Sqm 1.22 - 1.83 18 WINDOW
QUALITY TESTING ZONE
6 2 Sqm 1.83 - 2.10 8 DOOR
7 4 Sqm 1.22 - 1.83 9 WINDOW
BUFFING ZONE
8 2 Sqm 1.83 - 2.10 8 DOOR
9 8 Sqm 1.22 - 1.83 18 WINDOW
PACKING & DISPATCH
10 2 Sqm 1.83 - 2.10 8 DOOR
SUB TOTAL 174
INTERNAL PAINTING
WALL
1 4 Sqm 6.635 - 3.00 80
2 4 Sqm 6.82 - 3.00 82
3 OUTER WALL 4 Sqm 7.10 - 3.00 85
4 24 Sqm 7.27 - 3.00 523
5 4 Sqm 7.47 - 3.00 90
6 2 Sqm 13.8 - 3.00 83 BOTH SIDE
MACHNERY SHED
7 2 Sqm 13.9 - 3.00 83 BOTH SIDE
8 6 Sqm 7.27 - 3.00 131 BOTH SIDE
QUALITY TESTING ZONE
9 2 Sqm 13.985 - 3.00 84 BOTH SIDE
10 4 Sqm 7.27 - 3.00 87 BOTH SIDE
BUFFING ZONE
11 4 Sqm 13.985 - 3.00 168 BOTH SIDE
12 4 Sqm 7.27 - 3.00 87 BOTH SIDE
PACKING & DISPATCH
13 2 Sqm 13.985 - 3.00 84 BOTH SIDE
SUB TOTAL 1667
WALL- DEDUCTIONS
1 32 Sqm 1.22 - 1.83 71 WINDOW
OUTER WALL ROLLING
2 1 Sqm 3.00 - 3.00 9
SHUTTERE
3 8 Sqm 1.22 - 1.83 18 WINDOW
MACHNERY SHED
4 2 Sqm 1.83 - 2.10 8 DOOR
5 8 Sqm 1.22 - 1.83 18 WINDOW
QUALITY TESTING ZONE
6 2 Sqm 1.83 - 2.10 8 DOOR
7 4 Sqm 1.22 - 1.83 9 WINDOW
BUFFING ZONE
8 2 Sqm 1.83 - 2.10 8 DOOR
9 8 Sqm 1.22 - 1.83 18 WINDOW
PACKING & DISPATCH
10 2 Sqm 1.83 - 2.10 8 DOOR
SUB TOTAL 174