Professional Documents
Culture Documents
Incident Analysis
Incident Analysis
Electrical Dept.
1 Cable Fault
2 Breaker Switch Malfunction
3 Human Maloperation
4
5
Instrumentation Dept.
Reason
Dept.
Eliminated?
Yes - By checking insulation resistance of individual cables from 6.6kV breaker to Interface panel at PH-3 Substation
Yes - Breaker switch operation checked and found working OK after incident. It may or may not repeat in the future
Yes - Breaker operation was not recorded in SCADA