UB - GOA PPT All 21-10-19 PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

PROVIDING BASIC INFRASTRUCTURE FACILITIES

TO PRIMARY SCHOOLS AND ANGANWADIS


Supported by:
Implementing by:
Project at a glance
Providing basic infrastructure facilities to primary schools and Anganwadis &
Project Title
School
Project Partners United Breweries Ltd.& Dilasa Janvikas Pratishthan
Project Location Bethora Village, Ponda Block, North Goa, Goa state
Project Tenure 1 Year

To improve the condition and facilities of Anaganwadi by providing basic


Project Objective
infrastructural like benches, chair, playing kit etc.

Proposed no of Beneficiaries 250+

Beneficiaries Anganwadi children & School students


Sectoral Focus Education
Project Progress
Anganwadi
Reason for
S. Target Achievement
Items/ Activity less
No (No). (No).
achievement
1 Round Table 16 16 -
2 Chair 95 95 -
3 Multi Play Centre 3 3 -
4 Shelf 9 9 -
5 Playing Kit 63 63 -

6 Grill Fabrication 600 kg 600 kg -


Before / After
Snapshots during inauguration

Mr Kiran Nemade, Brewery Head


Mr Binod Kr. Singh, Unit Hr Head
Guests: Mr Sushant Gaonkar, Sarpanch, Bethora village
Dilasa Project team
Feedback from teachers
Sujata Gaonkar- The wall decorations, posters and
pictures as well as the learning items provided in the form of
puzzles are of good quality and have captured the minds and hearts
of the children. They are colorful and interesting, so the children
will enjoy learning from them. It will also enhance their creative
abilities and make the learning process more effective. This kind of
educational material was very much needed and the need has been
addressed very well. The children are indeed very happy

Meenakshi Gaonkar- I am expressing my happiness and


gratitude to the United Breweries Limited and Dilasa for taking
part in this noble cause. I am very happy to see the children
sitting comfortably and studying, which every child deserves. It is
a good initiative. It has contributed to a good and interesting
learning space.
Media Coverage
Project Progress
School
Reason for
S. Target Achievement
Items/ Activity less
No (No). (No).
achievement

1 School Benches 120 120 -

2 Green Board 10 10 -
Digital classroom with
3 01 01 -
educational Painting
Computer set up with
4 06 06 -
table & Chair
Before / After
School Infrastructure
Feedback from teachers

ADEI Goa Educationl Dept School Feedback Talyewada & Gotewada


Media Coverage

You might also like