NOTES:

PROCESS WATER 1. FOR GENERAL NOTES REFER TO 000-PR-PID-0001/0002/0003/0004.


2. ALL INSTRUMENT TAGS ARE PREFIXED WITH THE
332-PR-PID-1001
A
AREA NUMBER SHOWN ON THIS P&ID UNLESS OTHERWISE NOTED. A

3. REAGENT ADDITION TO CELL 2 VIA A VENDOR SUPPLIED TUNDISH.


4. FLOTATION CELL DART VALVES MAY BE OPERATED
FLOTATION AIR
INDEPENDENTLY. CONTROL PROGRAMMING SHALL INCLUDE
332-PR-PID-1001 PROVISION FOR INDEPENDENT DART VALVE LEVEL CONTROL.
5. TUNDISH INSTALLED ABOVE WORKING LEVEL.
6. FUTURE RECIRCULATING FEED NOZZLE.
7. LAUNDER SPRAYS SHOWN ON 332-PR-PID-9023.
FIC FIC
FIT FIT

FV FV

B B

ROUGHER 1 CELL 2 AE 1702 AE 1703


PROMOTER PUMP 2 2 ROUGHER 1 CELL 4
389-PP-9105 332-FT-1004
8-RCL-PF2-062
389-PR-PID-9101 332-PR-PID-1003

ROUGHER 1 CELL 2
COLLECTOR PUMP ROUGHER 1 CELL 4
389-PP-9305 NOTE 4 NOTE 4 332-FT-1004
20-RCL-PE3-125 LIC LIC
389-PR-PID-9301 PI LIT PI LIT 332-PR-PID-1003

2 SP-335

SP-928
C C
VSD
NOTE 5 VSD
LV LV VENDOR PACKAGE
REFER TO VENDOR P&ID
SP-928
332-FA-1002 332-FA-1003 1824-V0015-PR-PID-0001
NOTE 5
M M
NOTE 3 M M
LV LV

D D

ROUGHER 1 CELL 1 DN80 DN80


332-FT-1001
332-FT-1002
332-PR-PID-1001
DN400
DN300 DN80 DN80 DN80 NOTE 6

300-SPP-SC1-463
DN50
DN300 DN80 DN80 ROUGHER 1 CELL 4
E
DN150DN150 332-FT-1003 332-FT-1004 E

40BA1-03006
300-SPP-SC1-464 332-PR-PID-1003
2
TO GRADE TO GRADE
DN50 DN150 DN150
40BA1-03007

ROUGHER 1 CELL 3 AND 4


CONC. LAUNDER
332-LA-1004
*
F 332-PR-PID-1003 F

ROUGHER 1 CELL 3 AND 4


CONC. LAUNDER
332-LA-1004
*
332-PR-PID-1003
* * * * * *
ROUGHER 1 AND 2
2nd CONC. BOX 2
332-BX-9002
*
332-PR-PID-9001

332-LA-1003 ROUGHER 1 AND 2


2nd CONC. BOX 1
332-BX-9001
G
* G
332-PR-PID-9001

332-LA-1002

332-FA-1002 332-FA-1003 332-FT-1002 332-FT-1003 332-LA-1002 332-LA-1003


ROUGHER 1 CELL 2 ROUGHER 1 CELL 3 ROUGHER 1 CELL 2 ROUGHER 1 CELL 3 ROUGHER 1 CELL 2 ROUGHER 1 CELL 2 AND 3
GEARBOX FAN GEARBOX FAN CONC. LAUNDER CONC. LAUNDER

DRAWN CHECKED DESIGN ENG. LEAD ENG. DESIGN APP’D PROJ. APP’D CLIENT APP’D

CLIENT DRAWING TITLE

MPSA
COPPER ROUGHER FLOTATION
PROJECT

H MINA DE COBRE PANAMA ROUGHER 1 - SHEET 2 H

PIPING & INSTRUMENTATION DIAGRAM


2 12MAR18 CAMERA AND VALVE NUMBERS ADDED JM VA MT SB BG LG This drawing and its contents are confidential,
SCALE JOB No. DRG No. REV.
are subject to return on demand and may not
1 24FEB17 REVISED AS NOTED (74 MTPA CASE) CB BT DB SB BG SM
be copied or disclosed to any third party NTS
0 08OCT15 ISSUED FOR CONSTRUCTION WG GCP DB SB BG SM Lycopodium Minerals Pty Ltd ABN: 34 055 880 209 or used directly or indirectly for any other
purpose than as determined in writing by DRAWN DATE
DESIGN LEAD DESIGN PROJ. CLIENT
Level 5, 1 Adelaide Terrace, East Perth, Western Australia 6004
Lycopodium Minerals Pty Ltd.
1824 332-PR-PID-1002 2
DRG No REFERENCE DRAWINGS REV DATE DESCRIPTION DRN CHK’D
ENG. ENG. APP’D APP’D APP’D T: +61(0) 8 6210 5222 www.lycopodium.com.au CB 30OCT13
1 2 3 4 5 6 7 8 9 10 11 12

\\MNLFS1\draftingbound$\1824 - Cobre Panama\PR\1824_332PRPID1002_BND_2.dgn, 12/03/2018 8:59:07 AM, lloyd.gaviola, ISO A1