KLIMA-0009-TCO-RFI-HVAC-58-SU-3301-001 Damper Installation
KLIMA-0009-TCO-RFI-HVAC-58-SU-3301-001 Damper Installation
KLIMA-0009-TCO-RFI-
NOTIFICATION OF READINESS FOR INSPECTION
NO: HVAC-58-SU-
(NORFI)
3301-001
Project: AREA- TENGIZCHEVROIL PO No. 0009
058-SU-3301 FGP / AREA 7SS
Contract: FR8000235
Location / Address: PT. Wasco Engineering Indonesia, Date & Time:21 MARCH 2019
Batam
Jl. Brigjen Katamso Km.5
Kel. Tanjung Uncang Kec. Batu Aji Time: 10.15 AM - Finish
Batam Indonesia 29424
Telp: +62 778 392 212/ 396 216
Fax: +62 778 396 211
To avoid unnecessary visits, Supplier herewith declares that:- (Please tick the boxes below)
YES NO N/A
All above-mentioned items are available.
All above mentioned items passed successfully in-house inspection.
Material and / or test-certificates for above mentioned items are available,
checked and approved by Supplier
Applicable 3rd party inspection has taken place / will take place at the same
date*. *(delete as appropriate)
All relevant documents have been processed/reviewed Code 1 or Code 2.
All flange facings are in accordance with the project / order specifications.
All equipment / material is in compliance with the project / order
specifications.
PRINT NAME
DATE
ATTACHMENT 1