Tender Inviting Authority: Uttar Pradesh Jal Nigam

Name of Work: Construction, Erection, Testing, including Required Survey & Design Work, Commissioning, Start-up, Operation & Maintenance including Monitoring & Performance Run
for Renovation of Existing Clear Water Reservior, Pump House, Interconnection and segregation works, Extension of Distribution System, Leak Detection & its repair works and Rain
Water Harvesting Works in CW-2 Saraimeeeta, CW-5, Dabauli West, CW-39 Dada Nagar, CW-40 Govind Nagar, CW-41 Govind Nagar, CW-42, Juhi, CW-43 Juhi, CW-44 Shastri Park, Juhi,
CW-45 Bhairav Shanker Park, Transport Nagar, CW-47 Babu Purwa, CW-48 N Block, Kidwai Nagar, SW-1, Kidwai Nagar South, SW-2 Basant Vihar, SW-3, Naubasta, SW-4 Andha Kuan, SW-
5 Karrhi-I, SW-6 Karrahi-II, SW-7 Dabauli West, SW-8 Jarauli, SW-9 Bingawan, GW-1, Gujaini, GW-2 Barra West, GW-3 Ratan Lal Nagar, GW-4 Chedi Singh ka Purwa, GW-5 Barra East-1,
GW-6, Usmanpur zones of South Service District of Kanpur City. (Package-1)

NIT No: 3743/M-4/123, Dated 14.12.2018

Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
Bidders are allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #


Sl. Item Description Quantity Units Estimated Rate TOTAL AMOUNT TOTAL AMOUNT
No. in Without Taxes in In Words
Rs. P Rs. P

1 2 4 5 6 53 55
1 1. Interconnection/ Segregation
work
1.01 Supply of following sizes D.I.(K-7) pipes
Confirming to I.S. 8829:2000 with rubber
gasket and laying of the pipe in true alignment
including supply of all labour material T& P
etc. complete
100 mm dia

2125.000 meter 636.04 #VALUE! #VALUE!


1.02 125 mm dia
15.000 meter 855.98 #VALUE! #VALUE!
1.03 150 mm dia
885.000 meter 893.17 #VALUE! #VALUE!
1.04 200 mm dia
730.000 meter 1153.21 #VALUE! #VALUE!
1.05 250 mm dia
335.000 meter 1519.72 #VALUE! #VALUE!
1.06 300 mm dia
295.000 meter 1933.63 #VALUE! #VALUE!
1.07 350 mm dia
70.000 meter 2357.43 #VALUE! #VALUE!
1.08 400 mm dia
125.000 meter 2967.42 #VALUE! #VALUE!
1.09 450 mm dia
35.000 meter 3423.40 #VALUE! #VALUE!
1.1 500 mm dia
15.000 meter 4047.64 #VALUE! #VALUE!
1.11 600 mm dia
35.000 meter 5268.49 #VALUE! #VALUE!
1.12 Supply of following size of C.I. D/F non-rising
spindle type sluice valve with cap class-I
(working pressure 10 kg/cm2) and scour
valves as per I.S. 780:1980 and fixing the
valve including supply of all jointing, specials,
nut bolt, rubber packing, labour material T& P
etc. complete
100 mm dia

510.000 Nos 5292.18 #VALUE! #VALUE!


1.13 125 mm dia
4.000 Nos 6401.86 #VALUE! #VALUE!
1.14 150 mm dia
203.000 Nos 7830.20 #VALUE! #VALUE!
1.15 200 mm dia
166.000 Nos 12421.04 #VALUE! #VALUE!
1.16 250 mm dia
72.000 Nos 23514.16 #VALUE! #VALUE!
1.17 300 mm dia
61.000 Nos 28552.45 #VALUE! #VALUE!
1.18 350 mm dia
15.000 Nos 49177.23 #VALUE! #VALUE!
1.19 400 mm dia
30.000 Nos 61795.32 #VALUE! #VALUE!
1.2 450 mm dia
7.000 Nos 63246.01 #VALUE! #VALUE!
1.21 500 mm dia
3.000 Nos 88303.21 #VALUE! #VALUE!
1.22 600 mm dia
8.000 Nos 123651.76 #VALUE! #VALUE!
1.23 Dismantling of road surface including sorting
out of serviceable materials and disposal of
unserviceable material upto a distance of 50
m.
Interlocking Tiles Pavement

33800.400 sqm 130.86 #VALUE! #VALUE!


1.24 Bituminous Surface
32805.400 sqm 156.13 #VALUE! #VALUE!
1.25 C.C. Road

14657.170 sqm 196.75 #VALUE! #VALUE!


1.26 a) Excavation for pipe line in ordinary soil (loam,
clay or sand) including lift upto 1.50 m and lead
upto 50 m including filling back watering ramming
of excavated earth in to the trenches and disposal
of surplus earth within 50 m including all, labour
T&P As per computer design.

64321.300 cum 189.53 #VALUE! #VALUE!


1.27 Same as Item No. (a) above but excavation in soil
mixed with muram Kankar and Bazri etc.
13950.210 cum 220.21 #VALUE! #VALUE!
1.28 Cutting of existing following sizes nominal dia
of CI/DI/AC/PVC/HDPE running watermain,
inserting specials or fittings, bailing or
pumping out water, supply and cartage of
required specials, returning the scrap to the
store, etc. complete including the cost of
making joints,backfilling of excavated earth
including supply of all Lbour T&P etc.
complete
100mm dia

1290.000 Nos 9987.97 #VALUE! #VALUE!


1.29 125 mm dia
8.000 Nos 11249.66 #VALUE! #VALUE!
1.3 150 mm dia
269.000 Nos 12952.68 #VALUE! #VALUE!
1.31 200 mm dia
225.000 Nos 22607.63 #VALUE! #VALUE!
1.32 250 mm dia
83.000 Nos 29725.64 #VALUE! #VALUE!
1.33 300 mm dia
69.000 Nos 38870.68 #VALUE! #VALUE!
1.34 350 mm dia
15.000 Nos 54697.82 #VALUE! #VALUE!
1.35 400 mm dia
34.000 Nos 68000.67 #VALUE! #VALUE!
1.36 450 mm dia
7.000 Nos 81016.52 #VALUE! #VALUE!
1.37 500 mm dia
3.000 Nos 109628.48 #VALUE! #VALUE!
1.38 600 mm dia
8.000 Nos 143035.42 #VALUE! #VALUE!
1.39 Excavation in foundation in ordinary soil
(Loam/clay or sand) including lift upto 1.50 m and
lead upto 50.0m, filling watering and ramming of
excavated eart into the trenches or in to the
space between the building and side of
foundation trenches and disposal of surplus earth
upto distance of 50 m from the centre of the
foundation trenches.
4506.040 cum 189.53 #VALUE! #VALUE!
1.4 Plain Cement Concrete with 40 mm stone ballast
local sand and cement in proportion of (8:4:1) in
foundation and floors, including supply of all
materials, labour and T&P etc. required for proper
completion of the work.
517.440 cum 5728.93 #VALUE! #VALUE!
1.41 First class brick work in 1:4 in foundation and
plinth including supply of all materials, labour and
T&P etc. required for the proper completion of the
work.
1509.200 cum 5913.60 #VALUE! #VALUE!
1.42 Cement Concrete with 20mm guage approved
stone ballast, coarse sand and cement in the
proportion 3:1.5:1 including supply of all
materials, labours, T&P etc. required for proper
completion of the work.
269.500 cum 7974.02 #VALUE! #VALUE!
1.43 12mm thick plaster in 1:4 cement & coarse sand
including supply of all mateials labour, T&P etc.
required for proper completion of the work.

6942.320 sqm 183.22 #VALUE! #VALUE!


1.44 M.S. Iron work using 50x50x6 mm size angle iron
welded frame and welding of 10 mm tor steel bar
in 100x100 mm spacing including supply of all
material labour T&P etc all complete
107800.000 kg 79.41 #VALUE! #VALUE!
1.45 Site clearance at sluice valve place and other
unforseen hindrence item etc. 1078.000 Job 550.00 #VALUE! #VALUE!
1.46 Provision for construction of cement
concrete(1:2:4 cement coarse sand stone ballast)
Thurst block on bends & Tees of pipe line etc. all
complete . 233.250 cum 6660.45 #VALUE! #VALUE!
1.47 Reinstatement of Road
Reinstatement of road surface with old and new
material including cost of materials labour T&P
etc. all complete.
Reinstatement of Interlocking road. Excation
of earth and preparation of surface providing
100 mm thick Brick ballast 20-40mm and
spreading 40mm local sand laying of
concrete tile 80mm thick including supply of
all material labour T&P etc all complete.
Interlocking
Tiles Pavement using
Old Tile only
a. Tiles Pavement using Old Tile only

9832.110 sqm 491.15 #VALUE! #VALUE!


1.48 b. Interlocking Tiles Pavement using New Tile
only 4213.760 sqm 1231.20 #VALUE! #VALUE!
1.49 c. Reinstatement of Bituminous road.
Excavation of earth providing GSB, 200 mm,
WBM 150mm, BM 50mm and top coat 25mm
SDBC includingsupply of all material labour T&P
etc all complete.
67865.800 sqm 3276.08 #VALUE! #VALUE!
1.5 d. Reinstatement of CC road Excation of earth
and preparation of surface providing 100 mm
thick PCC 1:4:8 (1cement:5coarse sand:10 stone
grit 40mm) and Cement Concrete 1:2:4
(1cement:2coarse sand:4 stone grit 20mm) over it
and making surface smooth including supply of all
material labour T&P and curing upto 14 days etc
complete.
11444.810 sqm 1533.35 #VALUE! #VALUE!
1.51 Provision for fabricated specials of mild steel for
required size and shape as per site condtion
and as per direction of engineer in charge,
thickness of mild steel plate 6-10mm , seamless
countinous welding, epoxy painting minimum two
layer at inner and outer surface including supply
of all material labour T&P etc all complete.

5050.000 kg 96.90 #VALUE! #VALUE!


2 2. Leak Detection equipment
and Leakage Repairwork
2.01 Supply of Metal Pipe such as MS/CI/DI and Cable
Locator with Transmitter and Receiver unit
including cost of all equipments, accessories and
its installation with field training F.O.R.
destination.
1.000 Nos 267600.00 #VALUE! #VALUE!
2.02 Supply of PVC /HDPEPipe Locator with
Transmitter and Receiver unit including cost of all
equipments, accessories and its installation with
field training F.O.R. destination.
1.000 Nos 1148200.00 #VALUE! #VALUE!
2.03 Supply of Leak Noise Logger System Locator with
Transmitter and Receiver unit including cost of all
equipments, accessories and its installation with
field training F.O.R. destination.
1.000 Nos 1020200.00 #VALUE! #VALUE!
2.04 Supply of Leak Noise Correlator System
including cost of all equipments, accessories and
its installation with field training F.O.R.
destination. 1.000 Nos 1136700.00 #VALUE! #VALUE!
2.05 Provision for repairing of leakages in
following sizes of distribution system
including cost of dismentaling of road,
excavation, cutting of pipe, making
detachable joints and including cost of pipe,
specials and labour, etc. required for proper
repairing of leakage.
100/110 mm dia

460.000 Nos 3689.94 #VALUE! #VALUE!


2.06 125/140 mm dia
24.000 Nos 4030.63 #VALUE! #VALUE!
2.07 150/160 mm dia
11.000 Nos 4214.83 #VALUE! #VALUE!
2.08 200 mm dia
27.000 Nos 7754.29 #VALUE! #VALUE!
2.09 250 mm dia
25.000 Nos 8371.35 #VALUE! #VALUE!
2.1 300 mm dia
11.000 Nos 10433.63 #VALUE! #VALUE!
2.11 350 mm dia
7.000 Nos 15096.64 #VALUE! #VALUE!
2.12 400 mm dia
5.000 Nos 16755.51 #VALUE! #VALUE!
2.13 450 mm dia
3.000 Nos 18108.03 #VALUE! #VALUE!
2.14 500 mm dia
4.000 Nos 23716.43 #VALUE! #VALUE!
2.15 600 mm dia
1.000 Nos 29388.18 #VALUE! #VALUE!
3 3.1 Rain Water Harvesting
3.01 Supply of different type of ISI marked pipes
and laying the same in true alignment
including supply of pipe, specials all labour
T&P etc complete
PVC Pipes 6 Kg/Cm2
110mm dia
1344.000 meter 184.61 #VALUE! #VALUE!
3.02 160 mm dia
1008.000 meter 374.66 #VALUE! #VALUE!
3.03 200 mm dia
504.000 meter 557.01 #VALUE! #VALUE!
3.04 Supply & Fixing in position of precast/plastic Jali
6"x6" at the inlet etc. all complete including its
fixing, materials, labour, T&P etc. required for
Proper completion of the work. 196.000 Nos 501.34 #VALUE! #VALUE!
3.05 Excavation of earth in soil mixed with moorum &
kankar etc. for pipe line trenches including lift
upto 1.5m and lead upto 50m and also including
necessary reffilling watering & ramming of earth
into trenches.
905.800 cum 220.21 #VALUE! #VALUE!
3.06 Provision for construction of
filtration chamber and other related
works
Excavation of earth in the foundation of plinth
lead upto 50m & lift upto 1.50m for collection &
filtration chamber.
959.840 cum 154.96 #VALUE! #VALUE!
3.07 Lift above 1.50m.
658.840 cum 180.48 #VALUE! #VALUE!
3.08 Concrete with 40mm gauge stone ballast, local
sand and cement in proportion 8:4:1 in foundation
and plith, including supply of all materials, labour,
T&P etc. required for proper completion of the
work.
127.960 cum 5728.93 #VALUE! #VALUE!
3.09 Cement concrete with 20mm gauge approved
stone ballast, coarse sand and cement in the
proportion 1:1.5:3 including supply of all
materials, labour, T&P etc. required for proper
completion of the work.
32.480 cum 7974.02 #VALUE! #VALUE!
3.1 First class brick work in 1:4 cement & coarse
sand mortar in foundation and plinth including
supply of all materials, labour, T&P etc. required
for proper completion of the work. 332.640 cum 6380.68 #VALUE! #VALUE!
3.11 Provision for scraping of old & damage plaster of
parapet wall & removal of debries from site of
work to out side of campus including supply of all
material, labour, T&P etc. required for proper
completion of the work.
1920.000 sqm 73.15 #VALUE! #VALUE!
3.12 12mm thick plaster with cement mortar consisting
of 1:4 cement and coarse sand over brick work
minimum thickness not to be less than 10mm
including supply of all materials, labour, T&P etc.
required for proper completion of the work.
2574.320 sqm 183.22 #VALUE! #VALUE!
3.13 Supply and packing of gravel in filtration chamber
including supply of all materials, labour, T&P etc.
required for proper completion of the work.
168.000 cum 3000.00 #VALUE! #VALUE!
3.14 Provision wire mash in filtration chamber
including supply of all materials, labour, T&P etc.
required for proper completion of the work. 28.000 Each 592.49 #VALUE! #VALUE!
3.15 R.C.C. work with cement coarse sand & 20mm
gauge approved stone ballast in proportion of
1:1.5:3 in slab excluding supply of reinforcement
and its bending but including binding the same
with 0.5mm thick binding wire (into be supplied by
the contractor) and including necessary centering
& shuttering supply of all materials, labour, T&P
etc. required for proper completion of the work.

56.840 cum 13667.41 #VALUE! #VALUE!


3.16 Mild steel or iron work in plain work such as
R.C.C. or R.B. work (when not included in over all
rates), brought to required shape as necessary
including bending for proper completion of the
work including supply of steel and wastage labour
T&P etc complete.
4480.000 kg 85.68 #VALUE! #VALUE!
3.17 Provision for making haunch at the joints of the
wall & all the corners for proper completion of the
work including supply of all materials, labour, T&P
etc. complete. 280.000 meter 110.00 #VALUE! #VALUE!
3.18 Roof Treatment by Cleaning of roof top with tar
brush ,removal of dust making surface green,
spreading 1:4 mortor mnimum 20mm thick,
making slope in suface using mortor, finishing
oftopsurface with neat cement etc all complete
including supply of all labour material T&P etc all
complete.
2800.000 sqm 615.00 #VALUE! #VALUE!
3.19 Roof Treatment by Cleaning of roof top with tar
brush ,removal of dust making surface green,
applying water proofing layers as specified,
spreading 1:4 mortor mnimum 20mm thick,
making slope in suface using mortor, finishing
oftopsurface with neat cement etc all complete
including supply of all labour material T&P etc all
complete.
3500.000 sqm 310.00 #VALUE! #VALUE!
3.2 Supply & fixing of 60x60 cm. size C.I. manhole
(heavy duty) cover at the opening into the slab of
filtration chamber and also supply and fixing of
footrests. 56.000 Nos 11849.83 #VALUE! #VALUE!
3.21 Provision for testing of complete pipe line network
and structure, constructed under this scheme.
28.000 Job 2005.36 #VALUE! #VALUE!
3.22 Construction of water containers and silt
collection trap at Juction point of down pipe size
1.00x1.00 1.56 with R.C.C. covers made by MS
angle 50x50x6 frame. 84.000 Each 16407.45 #VALUE! #VALUE!
3.23 Provision for cutting & reinstate the road/B.O.E.
including supply of all material. Labour, T&P etc.
required for proper completion of work.Using 10%
New Brickin place borcken brick.

1515.000 Sqm 241.00 #VALUE! #VALUE!


3.24 Supply & fixing of 110 mm dia PVC 6kg/cm2
pressure pipe instead of damage down pipe. 588.000 meter 231.53 #VALUE! #VALUE!
3.25 Provision for monitoring & maintenance of the
recharge system after execution (Post project
observation) upto 2 monsoon seasion. 28.000 Job 4010.71 #VALUE! #VALUE!
4 3.2 Water Collection System for
Roof Top Rain Water:
4.01 Excavation of earth in the foundation of plinth
lead upto 50m & lift upto 1.50m 305.480 cum 154.96 #VALUE! #VALUE!
4.02 Lift above 1.50m.
305.480 cum 180.48 #VALUE! #VALUE!
4.03 Concrete cutting 40 mm gauge stone ballast wall
standard cemtn in proportion of (8:4:1) in
foundation including supply of all labour, material
and T&P etc. required for proper completion of
work.
122.920 cum 5728.93 #VALUE! #VALUE!
4.04 Laying of C.C. 1:1.5:3 cement course sand & 12-
20mm size stone grit in foundation including
supply of all Labour, T&P etc. required for proper
completion of work. 26.880 cum 7974.02 #VALUE! #VALUE!
4.05 Ist class brick work in 1:4 cement & course sand
in foundation & plinth including supply of all
materials, labour, T&P etc. required for proper
completion of work. 377.720 cum 6380.68 #VALUE! #VALUE!
4.06 R.C.C. work in lintels in 1:1.5:3 cement course
sand & 12-20 size stone ballast excluding supply
of reinforcement and its bending but including
binding the same with 0.50mm thick binding wire
(to be supplied by the contractor) and including
necessary centering & shuttering supply of all
materials labour, T&P etc. required for proper
completion of work. (Above jali)

3.108 cum 11140.66 #VALUE! #VALUE!


4.07 Mild steel or iron work in plain work such as
R.C.C. or R.B. wrok (when not included in over all
rates), brought to required shape as necessary
including bending for proper completion of the
work including supply of steel and wastage labour
T&P etc complete.
252.000 kg 85.68 #VALUE! #VALUE!
4.08 R.C.C. work with cement course sand and 20mm
gauge approved stone ballast in proportion of
1:1.5:3 in slab excluding supply of reinforcement
and its bending and including binding the same
with 0.5mm thick binding wire (to be supplied by
the contractor) and including necessary centering
& shuttering supply of all materials, labour, T&P
etc. required for proper completion of work.

48.440 cum 13667.41 #VALUE! #VALUE!


4.09 Mild steel or iron work in plain work such as
R.C.C. or R.B. wrok (when not included in over all
rates), brought to required shape as necessary
including bending for proper completion of the
work including supply of steel and wastage labour
T&P etc complete.
3808.000 kg 85.68 #VALUE! #VALUE!
4.1 12mm thick plaster with cement mortar consisting
of 1:4 cement and coarse sand over brick work
minimum thickness not to be less than 10mm
including supply of all materials, labour, T&P etc.
required for proper completion of the work in side
the water collecting chamber.

1124.480 sqm 183.22 #VALUE! #VALUE!


4.11 Supply & fixing of 60 cm.x60 cm. C.I. manhole
(heavy duty) cover including all necessary
materials, labour T&P etc. required for proper
completion of work including fixing of foot rest in
56.000 Nos 11849.83 #VALUE! #VALUE!
side the chamber.
4.12 Supply & fixing of 3.23 x 0.30 m. size C.I. Jali.
28.000 Nos 1308.04 #VALUE! #VALUE!
4.13 Provision of making of Injection well
(a) Transportaton of boring equipment upto site of
work and its installation / erection for boring etc.
complete. 28.000 Job 1115.71 #VALUE! #VALUE!
4.14 (b) Drilling of 200mm dia bore 24.00m. Deep
below G.L. or above in different strata as
required.
0-30m. 1344.000 meter 706.43 #VALUE! #VALUE!
4.15 (c) Providing & lowering of 160 mm dia (6 kg.
Cm2 Pressure) ISI Marked P.V.C. pipe in above
bore hole successfully etc. required for proper
completion of work.
1008.000 meter 293.51 #VALUE! #VALUE!
4.16 (d) Providing & lowering of 160 mm dia slotted
P.V.C. pipe in above bore hole successfully
including wrapping of coir etc. required for proper
completion of work.
Required for chamber.
336.000 meter 386.49 #VALUE! #VALUE!
4.17 Supply & fixing of bail plug 160mm dia.
56.000 Nos 125.79 #VALUE! #VALUE!
4.18 Cost of Gravel with local cartage.
38.000 cum 4261.38 #VALUE! #VALUE!
4.19 3.3 SILT COLLETION CHAMBER TRAP
AT JUNCTION OF RAIN WATER PIPE
FOR ROOF TOP RAIN WATER
HARVESTING.
Excavation of earth in the foundation of plinth
lead upto 50m & lift upto 1.50m
155.400 cum 154.96 #VALUE! #VALUE!
4.2 Laying of P.C.C. 8:4:1 cement fine sand & stone
ballast 20-40mm size in foundation including
supply of all Labour, T&P etc. required for proper
completion of work. 24.640 cum 5728.93 #VALUE! #VALUE!
4.21 Laying of C.C. 1:1.5:3 cement course sand & 12-
20mm size stone grit in foundation including
supply of all Labour, T&P etc. required for proper
completion of work. 2.240 cum 7974.02 #VALUE! #VALUE!
4.22 Ist class brick work in 1:4 cement & course sand
in foundation & plinth including supply of all
materials, labour, T&P etc. required for proper
completion of work. 57.680 cum 6380.68 #VALUE! #VALUE!
4.23 R.C.C. work with cement course sand and 20mm
gauge approved stone ballast in proportion of
1:1.5:3 in slab excluding supply of reinforcement
and its bending and including binding the same
with 0.5mm thick binding wire (to be supplied by
the contractor) and including necessary centering
& shuttering supply of all materials, labour, T&P
etc. required for proper completion of work.

2.800 cum 13667.41 #VALUE! #VALUE!


4.24 12mm thick plaster with cement mortar consisting
of 1:4 cement and coarse sand over brick work
minimum thickness not to be less than 10mm
including supply of all materials, labour, T&P etc.
required for proper completion of the work in side
the water collecting chamber.

165.760 sqm 183.22 #VALUE! #VALUE!


4.25 Site clearance and other unforseen item etc.
28.000 Job 128.53 #VALUE! #VALUE!
5 4. Extension of Distribution
5.01 Supply of following sizes H.D.P.E. / DI pipes
Confirming to I.S. 4984:1995./ IS 8329 : 2000
and specials confirming to relevant IS code( DI
pipe fitting IS 9523 -2000 , HDPE pipe fitting Tee
and Bend must be fabricated and confirming to IS
8360 part I,II & III, HDPE pipe other fitting
Reducer and Tale piece confirming to IS code
8008 part 4 to 9 ) , required for jointing of pipe
line ,laying of pipe line in true alignment including
supply of all jointing material labour T&P etc all
complete.
H.D.P.E. pipes PE 100 PN 6
110 mm dia
61449.000 meter 271.51 #VALUE! #VALUE!
5.02 140 mm dia
1635.000 meter 429.96 #VALUE! #VALUE!
5.03 160 mm dia
91.000 meter 550.74 #VALUE! #VALUE!
5.04 D.I. K-7 Pipe
200 mm dia 10.000 meter 1552.85 #VALUE! #VALUE!
5.05 250 mm dia
10.000 meter 2055.45 #VALUE! #VALUE!
5.06 300 mm dia
10.000 meter 2619.47 #VALUE! #VALUE!
5.07 350 mm dia
10.000 meter 3170.11 #VALUE! #VALUE!
5.08 400 mm dia
10.000 meter 3966.24 #VALUE! #VALUE!
5.09 450 mm dia
10.000 meter 4591.44 #VALUE! #VALUE!
5.1 500 mm dia
10.000 meter 5418.10 #VALUE! #VALUE!
5.11 Provision for crossing of pipe line with DI D/F
pipe under culvert and nala falling on
alignment of pipe line including cost of pipe
and specials, all labour, materials, T & P etc.
100mm

300.000 meter 1513.35 #VALUE! #VALUE!


5.12 125mm
180.000 meter 2099.83 #VALUE! #VALUE!
5.13 150mm
50.000 meter 2156.11 #VALUE! #VALUE!
5.14 Provision for repairing of existing demaged
pipe line connection, sewer connectnion,
power and telephone line etc. all complete.
(a) Sewer Connection
80.000 Nos 1710.00 #VALUE! #VALUE!
5.15 (b) Domestic Water Connection
275.000 Nos 1140.00 #VALUE! #VALUE!
5.16 House Connection in New/Existing Pipeline.
Dismantling of road,excavation of earth and
making water supply house connection up to
inside premises of household in following
sizes nominal dia distribution main with
PVC(upto 160mm)/ MS(200mm and above)
saddle piece, fixing of GM ferrule ,20mm PP
adopter 15 mm dia HDPE pipe , 20 mm GI pipe
, HDPE elbow ,GI union , Brass stop cock,
other appurtenant work including supply of all
labour material T&P etc all complete
excluding road reinstatement.

Labour Component, Local Cartage, Sundries,


Road Dismantling and Reinstatement etc.
complete.

5497.000 Nos 1137.68 #VALUE! #VALUE!


5.17
15mm dia HDPE Pipe
16491.000 meter 71.96 #VALUE! #VALUE!
5.18
20mm dia (OD) GI Pipe Class B
10994.000 meter 199.58 #VALUE! #VALUE!
5.19
Elbow 15mm HDPE
21988.000 Nos 76.76 #VALUE! #VALUE!
5.2
Clamp with Saddle upto 110mm
5223.000 Nos 143.93 #VALUE! #VALUE!
5.21
Clamp with Saddle upto 140mmto 160mm
132.000 Nos 279.22 #VALUE! #VALUE!
5.22
Clamp with Saddle upto 200mmto 250mm
68.000 Nos 421.22 #VALUE! #VALUE!
5.23
Clamp with Saddle upto 300mm
40.000 Nos 493.19 #VALUE! #VALUE!
5.24
Clamp with Saddle upto 350mm and above
34.000 Nos 585.30 #VALUE! #VALUE!
5.25
Stop Cock(Brass) weight not less than 200gm
5497.000 Nos 187.10 #VALUE! #VALUE!
5.26
Ferrule brass 15 mm with end cap
5497.000 Nos 95.95 #VALUE! #VALUE!
5.27
20mm PP Adopter
5497.000 Nos 86.36 #VALUE! #VALUE!
5.28
20mm dia CI Unoin
5497.000 Nos 38.38 #VALUE! #VALUE!
5.29 Provision for crossing of IOCL/GAIL Gas pipe line
including getting permission from IOCL/GAIL ,
insurance, excavation of earth, supply and laying
of pipe all labour T&P etc all complete.
7.000 Nos 278587.50 #VALUE! #VALUE!
5.3 Provision for sifting of Existing underground
Electric Cable of KESCO coming in alignment of
pipe line including supply of all labour T&P etc all
complete. 14.000 Nos 9500.00 #VALUE! #VALUE!
6 5. Renovation of Existing CWR

6.01 Providing and erection of scaffolding and


shuttering material like challi, gurra, nail, bans,
balli, patra etc. required for complete of work on
all surface area of O.H.T. from Top dome to G.L.
so as to give strong and safe plate form to
workers to work on all part of O.H.T. for repair
and strengthening as per direction of engineer in
charge.
CW-39 2250 KL
1.000 Nos 108243.59 #VALUE! #VALUE!
6.02 CW-41 2250 KL
1.000 Nos 108243.59 #VALUE! #VALUE!
6.03 CW-47 2250 KL
1.000 Nos 108243.59 #VALUE! #VALUE!
6.04 Provision of following works-
Surface preparation- the surface of structure to
be treated for strengthening shall be roughened
properly either by raking joints or by hacking the
cement concrete surface with a specially made
hacking tool or other wise alternatively to make
the surface rough and dust free by providing
spatter key or wire brush.
CW-39 2250 KL

2040.000 sqm 263.25 #VALUE! #VALUE!


6.05 CW-41 2250 KL
815.360 sqm 263.25 #VALUE! #VALUE!
6.06 CW-47 2250 KL
815.360 sqm 263.25 #VALUE! #VALUE!
6.07 Injection grouting in vertical surface/wall :
Placing and fixing nozzle by drilling machine in
tank wall having minimum dia of Nozzle 15mm
and provided on a regular interval not exceeding
1m including construction joints. Injection of
pidicrete AM (polymer based on shrinkage high
strength grout) admixed with cement through
nozzles under pressure by sump @ 250 gms per
bag of cement. Sealing the nozzle after grouting
with Polymer product mixed with cement.
CW-39 2250 KL

2040.000 sqm 807.93 #VALUE! #VALUE!


6.08 CW-41 2250 KL
815.360 sqm 807.93 #VALUE! #VALUE!
6.09 CW-47 2250 KL
815.360 sqm 807.93 #VALUE! #VALUE!
6.1 Repairing of spalled and lose concrete where
reinforcement is exposed apply like fixit rust
remover by means of brush to the reinforcement
for clearing bars and steel surface then apply a
bonding coat of acreylic based polymer with
cement slurry in 1:1 ratio to the pre-wet cencrete
by brush. Now apply the mixture of 1:1 cement,
coarse sand to the prepared substrate when
primer becomes tacky.
(Taking 10% of total surface area of CWR)
CW-39 2250 KL

204.000 sqm 476.27 #VALUE! #VALUE!


6.11 CW-41 2250 KL
204.000 sqm 476.27 #VALUE! #VALUE!
6.12 CW-47 2250 KL
204.000 sqm 476.27 #VALUE! #VALUE!
6.13 Change of steel ladder inside the tank, repair of
M.H. cover of top dome, change of masquoto jali
with new one complete.
CW-39 2250 KL 1.000 Nos 14949.01 #VALUE! #VALUE!
6.14 CW-41 2250 KL
1.000 Nos 14949.01 #VALUE! #VALUE!
6.15 CW-47 2250 KL
1.000 Nos 14949.01 #VALUE! #VALUE!
6.16 Supply and fixing of 20 mm dia medium class G.I.
pipe railling in stair case and balcony. Post 1-
1.2m in distance G.I. in three rows.
Taking only 25% new and 75% old materials
CW-39 2250 KL
120.000 Rmt 1569.65 #VALUE! #VALUE!
6.17 CW-41 2250 KL
120.000 Rmt 1569.65 #VALUE! #VALUE!
6.18 CW-47 2250 KL
120.000 Rmt 1569.65 #VALUE! #VALUE!
6.19 Supply of all material & fixing of polycarbonate
pipe 200mm dia in vertical and connected before
outlet valve with radium no. marking and fixing all
systems as per direction and upto satisfaction of
engineer-in-charge.
CW-39 2250 KL
1.000 Set 24679.54 #VALUE! #VALUE!
6.2 CW-41 2250 KL
1.000 Set 24679.54 #VALUE! #VALUE!
6.21 CW-47 2250 KL
1.000 Set 24679.54 #VALUE! #VALUE!
6.22 25mm thick 1:2:4 plain cement concrete flooring
in apron with cement, coarse sand and 20mm
gauge stone ballast, laid in panels, finished with
3mm floating coat of neat cement or cement
including 75mm thick base concrete of 1:4:8
including supply of all materials, labour, T&P etc
complete.
CW-39 2250 KL
112.000 sqm 657.26 #VALUE! #VALUE!
6.23 CW-41 2250 KL
112.000 sqm 657.26 #VALUE! #VALUE!
6.24 CW-47 2250 KL
112.000 sqm 657.26 #VALUE! #VALUE!
6.25 Painting of outer surface of CWR with weather
proof paint (like apex etc.) as per direction of
engineer incharge.
CW-39 2250 KL 224.000 sqm 214.76 #VALUE! #VALUE!
6.26 CW-41 2250 KL
224.000 sqm 214.76 #VALUE! #VALUE!
6.27 CW-47 2250 KL
224.000 sqm 214.76 #VALUE! #VALUE!
6.28 Connection of CWR with existing distribution
system by following size D.I. K-7 pipe including
supply of D.I. pipes with rubber gasket as per
I.S.F.O.R. destination including all taxes and local
cartage including cost of dismantling of road
surface and its reinstatement, excavation in
trenches, carting, laying and jointing of pipe,
fitting of required specials including its testing etc.
complete.
300mm DI K-7
CW-39 2250 KL

40.000 meter 4125.93 #VALUE! #VALUE!


6.29 CW-41 2250 KL
40.000 meter 4125.93 #VALUE! #VALUE!
6.3 CW-47 2250 KL
40.000 meter 4125.93 #VALUE! #VALUE!
6.31 Supply of following size of C.I. D/F non-rising
spindle type sluice valve with cap class-I (working
pressure 10 Kg/Cm2) as per I.S. 780/1980 for
destination including all taxes etc. all complete.
300mm
CW-39 2250 KL

1.000 Nos 18686.26 #VALUE! #VALUE!


6.32 CW-41 2250 KL
1.000 Nos 18686.26 #VALUE! #VALUE!
6.33 CW-47 2250 KL
1.000 Nos 18686.26 #VALUE! #VALUE!
6.34 Cartage of sluice valve of following sizes to site of
work from store, lowering already prepared
trenches and fixing in position and making
flanged joints including supply of all jointing
materials such as bolts nuts rubber insertion
sheet. White lead and testing etc. all complete .
300mm
CW-39 2250 KL

1.000 Nos 1040.66 #VALUE! #VALUE!


6.35 CW-41 2250 KL
1.000 Nos 1040.66 #VALUE! #VALUE!
6.36 CW-47 2250 KL
1.000 Nos 1040.66 #VALUE! #VALUE!
6.37 Supply of all materials labour T&P etc. and
construct masonry type sluice valve/scour valve
chamber as per type design including supply &
fixing of RCC cover etc. all complete.
CW-39 2250 KL
1.000 sqm 21018.74 #VALUE! #VALUE!
6.38 CW-41 2250 KL
1.000 sqm 21018.74 #VALUE! #VALUE!
6.39 CW-47 2250 KL
1.000 sqm 21018.74 #VALUE! #VALUE!
7 6. Renovation of Existing Pump
House
7.01 Supply of all materials and reinforced cement
concrete and roofing with 20 mm stone ballast,
coarse sand and cement mortar in 1:1:5:3
excluding supply of reinforcement and its bending
but including its fixing in position with supply of
biding wire, centering and shuttering and
necessarycuring and supply of all materials,
labour and T&P etc. required for proper
completion of the work.
For Slab and Stairs
CW-39 Dada Nagar, 14.5m x 8.5m

10.000 cum 13667.41 #VALUE! #VALUE!


7.02 CW-41 Govind Nagar Existing, 14.5m x 8.5m
10.000 cum 13667.41 #VALUE! #VALUE!
7.03 CW-47 Babu Purwa Existing, 14.5m x 8.5m
10.000 cum 13667.41 #VALUE! #VALUE!
7.04 For Beams and Columns
CW-39 Dada Nagar, 14.5m x 8.5m 15.000 cum 13864.71 #VALUE! #VALUE!
7.05 CW-41 Govind Nagar Existing, 14.5m x 8.5m
15.000 cum 13864.71 #VALUE! #VALUE!
7.06 CW-47 Babu Purwa Existing, 14.5m x 8.5m
15.000 cum 13864.71 #VALUE! #VALUE!
7.07 Ist class brick work in 1:4 cement & coarse sand
mortar including necessary cutting and moulding
of bricks for boundary wall as required and
inluding supply of all material labour T&P etc.
required for proper completion of the work.
For Foundation upto Plinth
CW-39 Dada Nagar, 14.5m x 8.5m

45.000 cum 5913.60 #VALUE! #VALUE!


7.08 CW-41 Govind Nagar Existing, 14.5m x 8.5m
45.000 cum 5913.60 #VALUE! #VALUE!
7.09 CW-47 Babu Purwa Existing, 14.5m x 8.5m
45.000 cum 5913.60 #VALUE! #VALUE!
7.1 For Superstructure
CW-39 Dada Nagar, 14.5m x 8.5m 120.000 cum 6354.33 #VALUE! #VALUE!
7.11 CW-41 Govind Nagar Existing, 14.5m x 8.5m
120.000 cum 6354.33 #VALUE! #VALUE!
7.12 CW-47 Babu Purwa Existing, 14.5m x 8.5m
120.000 cum 6354.33 #VALUE! #VALUE!
7.13 25mm thick 1:2:4 plain cement concrete flooring
in apron with cement, coarse sand and 20mm
gauge stone ballast, laid in panels, finished with
3mm floating coat of neat cement or cement
including 75mm thick base concrete of 1:4:8
including supply of all materials, labour, T&P etc
complete.
CW-39 Dada Nagar, 14.5m x 8.5m
1080.000 sqm 657.26 #VALUE! #VALUE!
7.14 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1080.000 sqm 657.26 #VALUE! #VALUE!
7.15 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1080.000 sqm 657.26 #VALUE! #VALUE!
7.16 12 mm thick plaster with cement mortar 1:4
consisting of cement and coarse sand over brick
works, minimum thickness not to be less than
10mm including supply of all materials labour T&P
etc. required for proper completion of the work.
CW-39 Dada Nagar, 14.5m x 8.5m

1500.000 sqm 183.22 #VALUE! #VALUE!


7.17 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1500.000 sqm 183.22 #VALUE! #VALUE!
7.18 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1500.000 sqm 183.22 #VALUE! #VALUE!
7.19 Painting of Pump House and boundary wall with
one coat primer and two coats of weather proof
paint (like apex etc.) as per direction of engineer
incharge.
CW-39 Dada Nagar, 14.5m x 8.5m
1500.000 sqm 214.76 #VALUE! #VALUE!
7.2 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1500.000 sqm 214.76 #VALUE! #VALUE!
7.21 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1500.000 sqm 214.76 #VALUE! #VALUE!
7.22 Painting of iron work with one coat priming and
two coats of approved high grade enamel paint
including supply of all mateials, labour T&P etc.
required for proper completion of the work.
CW-39 Dada Nagar, 14.5m x 8.5m
80.000 sqm 191.37 #VALUE! #VALUE!
7.23 CW-41 Govind Nagar Existing, 14.5m x 8.5m
80.000 sqm 191.37 #VALUE! #VALUE!
7.24 CW-47 Babu Purwa Existing, 14.5m x 8.5m
80.000 sqm 191.37 #VALUE! #VALUE!
7.25 Mild steel or iron work in plain work such as RCC
work wrought to required shape as necessary
including bending for proper completion of the
wok and including supply of steel and wastage.
CW-39 Dada Nagar, 14.5m x 8.5m
1100.000 kg 85.68 #VALUE! #VALUE!
7.26 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1100.000 kg 85.68 #VALUE! #VALUE!
7.27 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1100.000 kg 85.68 #VALUE! #VALUE!
7.28 Supply & fixing of M.S. Girder I.S.H.B. 200
CW-39 Dada Nagar, 14.5m x 8.5m 1500.000 kg 85.68 #VALUE! #VALUE!
7.29 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1500.000 kg 85.68 #VALUE! #VALUE!
7.3 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1500.000 kg 85.68 #VALUE! #VALUE!
7.31 Supply & fixing of rolling shutter for main door.
CW-39 Dada Nagar, 14.5m x 8.5m 1.000 Nos 19483.85 #VALUE! #VALUE!
7.32 CW-41 Govind Nagar Existing, 14.5m x 8.5m
1.000 Nos 19483.85 #VALUE! #VALUE!
7.33 CW-47 Babu Purwa Existing, 14.5m x 8.5m
1.000 Nos 19483.85 #VALUE! #VALUE!
7.34 Supply & fixing of exhaust fan
CW-39 Dada Nagar, 14.5m x 8.5m 3.000 Nos 4329.74 #VALUE! #VALUE!
7.35 CW-41 Govind Nagar Existing, 14.5m x 8.5m
3.000 Nos 4329.74 #VALUE! #VALUE!
7.36 CW-47 Babu Purwa Existing, 14.5m x 8.5m
3.000 Nos 4329.74 #VALUE! #VALUE!
7.37 Supply & fixing of rain water pipe. (110mm dia)
CW-39 Dada Nagar, 14.5m x 8.5m
18.000 meter 325.60 #VALUE! #VALUE!
7.38 CW-41 Govind Nagar Existing, 14.5m x 8.5m
18.000 meter 325.60 #VALUE! #VALUE!
7.39 CW-47 Babu Purwa Existing, 14.5m x 8.5m

18.000 meter 325.60 #VALUE! #VALUE!


7.4 Mild steel or iron work in chaukhat including
supply of all material, labour T&P etc. required for
proper completion of work.
CW-39 Dada Nagar, 14.5m x 8.5m 100.000 kg 85.68 #VALUE! #VALUE!
7.41 CW-41 Govind Nagar Existing, 14.5m x 8.5m
100.000 kg 85.68 #VALUE! #VALUE!
7.42 CW-47 Babu Purwa Existing, 14.5m x 8.5m
100.000 kg 85.68 #VALUE! #VALUE!
7.43 Making plinth protection 50 mm thick of cement
concrete 1:2:4 (1 Cement:2 Coarse sand:4
graded stone aggreate 20 mm nominal size) over
75 mm bed of dry brick ballast 40 mm nominal
size well rammed and consolidated and grouted
with fine sand inlcluding supply of all materials,
labour, T&P etc. required for proper completion of
work. including floating coat with neat cement &
glass stips including brick edging at sides.
CW-39 Dada Nagar, 14.5m x 8.5m

45.000 sqm 491.86 #VALUE! #VALUE!


7.44 CW-41 Govind Nagar Existing, 14.5m x 8.5m
45.000 sqm 491.86 #VALUE! #VALUE!
7.45 CW-47 Babu Purwa Existing, 14.5m x 8.5m
45.000 sqm 491.86 #VALUE! #VALUE!
7.46 Wirring Point with 1.5 Sqmm PVC Insulated and
PVC conduite with flush type switch mounted on
backlite switch etc. on wooden board complete in
all respect for light, fans, plug with 1sqmm earth
wire.
CW-39 Dada Nagar, 14.5m x 8.5m
10.000 Point 1385.52 #VALUE! #VALUE!
7.47 CW-41 Govind Nagar Existing, 14.5m x 8.5m
10.000 Point 1385.52 #VALUE! #VALUE!
7.48 CW-47 Babu Purwa Existing, 14.5m x 8.5m
10.000 Point 1385.52 #VALUE! #VALUE!
7.49 Wirring Point with 2.5 Sqmm PVC Insulated and
PVC conduite with 1.5 sqmm PVC insulated earth
wire with 15A Piano Type Switch on Wooden
Board etc. complete in all respect.
CW-39 Dada Nagar, 14.5m x 8.5m
10.000 Point 2338.06 #VALUE! #VALUE!
7.5 CW-41 Govind Nagar Existing, 14.5m x 8.5m
10.000 Point 2338.06 #VALUE! #VALUE!
7.51 CW-47 Babu Purwa Existing, 14.5m x 8.5m
10.000 Point 2338.06 #VALUE! #VALUE!
Total in Figures #VALUE!
#VALUE!
Quoted Rate in Figures 0.00 #VALUE!
Select
Quoted Rate in Words #VALUE!