Professional Documents
Culture Documents
Article
Article
Article
(http://nokia.com)
Portal Profile | Logout (/portal/logout)
(https://market.alcatel-
lucent.com/myprofile)
Welcome to the
Problem Description
VDP:[002] The VDP storage is nearly full.
Or
VDP:[003] The VDP storage is full.
Diagnostic Steps
The alarms itself are self-explanatory.
Check Filesystem status in vdp.
root@vdp:~/ (mailto:root@vdp:~/)#: df -h
The difference between file system space as above, and reported by vdp as in the screenshot should not be much. Big difference means that
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121
daily VDP maintenance is not able to recover space efficiently. 1/7
Solution
5/9/2019 Product Support Portal - Article
The solution to this problem is to run Garbage collection manually. It may have to be done multiple times to claim more space.
Step1: Delete old backup starting from the oldest date. It has to be done from VDP restore tab as shown below. This step will free raw space in
the filesystem.
Thu Apr 12 08:40:16 ART 2018 [vdp] Thu Apr 12 11:40:16 2018 UTC (Initialized Mon Dec 19 14:58:33 2016 UTC)
Node IP Address Version State Runlevel Srvr+Root+User Dis Suspend Load UsedMB Errlen %Full Percent F
ull and Stripe Status by Disk
0.0 10.105.44.135 7.2.80-118 ONLINE fullaccess mhpu+0hpu+0hpu 1 false 2.99 14485 81137692 43.8% 43%(onl:2
598) 43%(onl:2599) 43%(onl:2597)
System-Status: ok
Access-Status: full
Last checkpoint: cp.20180412110235 finished Thu Apr 12 08:05:27 2018 after 02m 52s (OK)
Last GC: finished Thu Apr 12 08:02:35 2018 after 01m 59s >> recovered 0.00 KB (MSG_ERR_DISKFULL)
Hfscheck in progress: started Thu Apr 12 08:05:27 2018 >> checked 1704 of 6487 stripes (hfscheck)
Next backup window start time: Thu Apr 12 17:00:00 2018 ART
Next maintenance window start time: Fri Apr 13 08:00:00 2018 ART
The above bold line shows that it is running. If running, it is better to wait for it to finish.
Also check the status of maintenance scheduler, and backup scheduler.
root@vdp:~/#: dpnctl status
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 2/7
5/9/2019 Product Support Portal - Article
Identity added: /home/dpn/.ssh/dpnid (/home/dpn/.ssh/dpnid)
dpnctl: INFO: gsan status: up
dpnctl: INFO: MCS status: up.
dpnctl: INFO: emt status: up.
dpnctl: INFO: Backup scheduler status: up.
dpnctl: INFO: axionfs status: down.
dpnctl: INFO: Maintenance windows scheduler status: enabled.
dpnctl: INFO: Unattended startup status: enabled.
dpnctl: INFO: avinstaller status: up.
dpnctl: INFO: [see log file "/usr/local/avamar/var/log/dpnctl.log"]
Step3: Disable all backup jobs in VDP GUI. Wait for all backup jobs to finish if some are running. In NetAct operating documentation,
NetAct Administration > NetAct Administration Operating Procedures > Administering Backups > Taking and Restoring Disk-based Backups >
Taking and restoring backups of virtual machines > Enabling or disabling VDP backup jobs
Step4: Stop Maintenance service, and backup scheduler.
root@vdp:~/ (mailto:root@vdp:~/)#: dpnctl stop maint
Step5: Check services status that they are stopped which are highlighted in bold.
root@vdp:~/ (mailto:root@vdp:~/)#: dpnctl status
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 3/7
5/9/2019 Product Support Portal - Article
Thu Apr 12 08:14:48 ART 2018 [vdp] Thu Apr 12 11:14:48 2018 UTC (Initialized Tue Jul 14 19:32:43 2015 UTC)
Node IP Address Version State Runlevel Srvr+Root+User Dis Suspend Load UsedMB Errlen %Full Percent F
ull and Stripe Status by Disk
0.0 10.105.39.7 7.2.80-129 ONLINE fullaccess mhpu+0hpu+0hpu 1 false 0.85 15354 76059877 52.4% 52%(onl:2
440) 52%(onl:2436) 52%(onl:2441)
System-Status: ok
Access-Status: full
No checkpoint yet
Last GC: finished Thu Apr 12 07:45:59 2018 after 01h 03m >> recovered 201.29 GB (OK)
No hfscheck yet
Next backup window start time: Thu Apr 12 20:00:00 2018 ART
Next maintenance window start time: Fri Apr 13 08:00:00 2018 ART
<garbage-collect-params
gccount="0"
gcmincount="0"
refcheck="true"
killsecs="0"
maxtime="3600"
maxpass="100"
throttle="0"
usehistory="false"
limitadjust="0"
orphansfirst="false"/>
Note: timeout=<how many seconds should GC run>. Keep it sufficient, approximately 2 hours is required because default GC run time is 3600
seconds.
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 4/7
5/9/2019 Product Support Portal - Article
Thu Apr 12 08:57:12 ART 2018 [vdp] Thu Apr 12 11:57:12 2018 UTC (Initialized Tue Jul 14 19:32:43 2015 UTC)
Node IP Address Version State Runlevel Srvr+Root+User Dis Suspend Load UsedMB Errlen %Full Percent F
ull and Stripe Status by Disk
0.0 10.105.39.7 7.2.80-129 ONLINE fullaccess mhpu+0hpu+0hpu 1 false 3.95 15795 76060910 52.4% 52%(onl:2
440) 52%(onl:2436) 52%(onl:2441)
System-Status: ok
Access-Status: full
No checkpoint yet
GC in progress: started Thu Apr 12 08:56:21 2018 >> recovered 0.00 KB (so far)
No hfscheck yet
Next backup window start time: Thu Apr 12 20:00:00 2018 ART
Next maintenance window start time: Fri Apr 13 08:00:00 2018 ART
Step8: After GC is finished. You can check the space recovered using the same command as above. It can also be confirmed with VDP
configuration window in GUI.
root@vdp:~/ (mailto:root@vdp:~/)#: status.dpn
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 5/7
5/9/2019 Product Support Portal - Article
Thu Apr 12 08:14:48 ART 2018 [vdp] Thu Apr 12 11:14:48 2018 UTC (Initialized Tue Jul 14 19:32:43 2015 UTC)
Node IP Address Version State Runlevel Srvr+Root+User Dis Suspend Load UsedMB Errlen %Full Percent F
ull and Stripe Status by Disk
0.0 10.105.39.7 7.2.80-129 ONLINE fullaccess mhpu+0hpu+0hpu 1 false 0.85 15354 76059877 52.4% 52%(onl:2
440) 52%(onl:2436) 52%(onl:2441)
System-Status: ok
Access-Status: full
No checkpoint yet
Last GC: finished Thu Apr 12 07:45:59 2018 after 01h 03m >> recovered 201.29 GB (OK)
No hfscheck yet
Next backup window start time: Thu Apr 12 20:00:00 2018 ART
Next maintenance window start time: Fri Apr 13 08:00:00 2018 ART
Step11: Enable backup jobs in VDP GUI in vcenter. In NetAct operating documentation,
NetAct Administration > NetAct Administration Operating Procedures > Administering Backups > Taking and Restoring Disk-based Backups >
Taking and restoring backups of virtual machines > Enabling or disabling VDP backup jobs
Workaround
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 6/7
Cause
5/9/2019 Product Support Portal - Article
Linked Content
Articles Attachments Videos
Comments
Rate this article: Leave a Comment
PSP Home
https://ps-kb.app.alcatel-lucent.com/portal/search/article/view/21008121 7/7