Observation of PFC Consulting Ltd. (PFCCL) as PMA on Revised BOQ
(Amendment-2) submitted by the Turnkey Agency, M/S L&T Ltd, for Rural
Electricity Infrastructure Development, Metering works & Agriculture Feeder
Segregation works under DDUGJY in North 24 Parganas District under
Package No. 22°
Reference:
(1) DDUGIY/LOA/PK-22/ N-24 PGS /VIL.&FDR/L&T/SUPPLY/550 DATED 28/06/17
(2) DUGIY/LOA/PK-22/N-24 PGS/VIL.&FOR/L&T/ERECTION/S51 DATED 28/06/17
(3) CE/Project-II/DDUGIY/T-14/2372 DATED: 25.01.2018
(4) CE/Project-il/DDUGIY/T-14/2917 DATED: 01.03.2019
After going through the revised BOQ (Amendment-2) submitted by the turnkey agency M/S
LAT Ltd for the Package Number-22 under DDUGJY in North 24 Parganas District which is
prepared on the basis of approved revised 80Q (1" revision) by North 24 Parganas RE
Project Office WBSEDCL, We have come out with the following observation in seriatim.
1) The requirement of DTR meter of different capacity has been reduced from METERING
scope of work. Consequently 1.1 KV Grade LT XLPE Power cables and accessories will no
longer required .The respective revised BOQ (Amendment-2) have been approved by the
WBSEDCL officials in consultation of PMA. This may be approvec
2) Three (3) nos. of Feeders are reduced from the scope of work as per the advice of
WBSEDCL Authority based on necessity. Accordingly, requirement of 8mtr/9mtr PCC
poles and Rabbit conductor, 25KVA/63KVA DTR are also decreased for this purpose .The
same has been approved by the Project Manager, North 24 Parganas RE Project,
WBSEDCL in consultation with the Project-II wing as well as PMA. This also may be
approved.
3). The requirement of LT AB cable in some more theft prone area as recommended by the
(O&M Divisions has been taken for consideration which has been subsequently approved
by the Project Manager in consultation with the Project-lI wing as well as PMA.
Accordingly, some more requirment of poles are also taken into account for this
purpose.
4), The Requirement of Conductor and AB cable are decreased from the scope of work and.
the same is adjusted towards building up some future infrastructure under DDUGIY
scheme to accommodate connections under SAUBHAGYA scheme. The respective
revised BOQ (Amendment-2) have been approved by the WBSECL officals.
ealtger aratera: 945 aH HAP, 1, arena aa, wake woes, mf FeecA-110001
Regd. Offe : First Foor, “Ujanihi’, 1, Barakramba Lane, Connaught Place, New Det-110005
wih mearer: rot TH (fn) eH wT, Ate a, A Aeeh—r10001 FTG < O11-zs44I900 aR: 011—20449800
Corporate Office ‘9m Foo’ (A Wing) Statesman House, Conneught Place, New Deli-119001 Pane : 011-23443000 Fax: 011-2344 9800
$e! E-mail: preconsuungiptonaia com SararScrwotate : wirnplosindia.comVariation of quantity of different material at North 24 Parganas District under
DDUGIY scheme by the agency M/S L&T Ltd,
MATERIAL DESCRIPTION Revised BOQ | Revised 80Q (2nd Revision)
[eccama eee
pecemmm | 5983 |
ACSR RABBIT CONDUCTOR | 2330
25 kVA TR fos]
S3KVADTIR is 709
TR METER 0
2638.28 | it 2807.28The revised BOQ (Amendment 2)submitted the Agency has been checked for all the items & found
to be justified. The same was discussed in the Joint Meeting with the Project Manager and the
Turn-key Agency.
A sheet showing (+/-) Variation for major items have been attached
Considering all the above reasons for variation, the estimated cost (supply & Erection)
comes to (+) 7.4% above the LOA value, which seems to be justified The matter has also
been discussed with the Project Manager, North 24 Parganas RE Project.