MAGNETIC PARTICLE INSPECTION

DYE PENETRANT TESTING RPT NO: TMSB/EMB/DPT/12/


PROJECT: TA4MS CONTRACT NO:
CLIENT : ESSO MALAYSIA BERHAD DATE: 21/03/2011
SPECIFICATION : ASME VIII ACC/REJ.CRITERIA : ASME B31.3 LOCATION: P.DICKSON
MATERIAL : CARBON STEEL WELDING PROCESS: GTAW/SMAW
SURFACE CONDITION : AS CLEAN MATERIAL THICKNESS: -
HEAT TREATMENT : N/A DRAWING NO:
MAGNETIC PARTICLE INSPECTION DYE PENETRANT TEST
BACKGROUND: N/A REMOVER:
MAGNETIC INK: RED MAGNETIC DUSTING POWDER DYE PENETRANT:
APPARATUS: PERMANENT YOKE DEVELOPER: N/A
CURRENT: N/A METHOD:
METHOD: DRY POWDER
SUMMARY OF RESULT
IDENTIFICATION INSPECTION FINDING ACCEPT/REJECT REMARKS

MPI ON WELDED JOINT


AND WELDED PIPE SUPPORT
AT LINE:
6"-PF-1286A-1B1B-2

JT.1 ACC.
JT.2 NO INDICATION FOUND ACC.
JT.3 DURING INSPECTION TIME ACC.

JT.S1 ACC. FABRICATION DEFECT FOUND


BY VISUAL

REFER SKETCH FOR DETAIL

EXAMINED BY CLIENT REPRESENTATIVE


NAME : NOORULADHA / SHAHERAN NAME :

DATE : 21/03/2012 DATE :

SIGNATURE : SIGNATURE :
DYE PENETRANT INSPECTION & MAGNETIC PARTICLE INSPECTION REPORT
PROJECT T4MS REPORT NO: STSEDAC/DPI/PCP/20/001

CLIENT PETRONAS
REFINERY AND PETROCHEMICAL
CORPORATION SDN BHD (PRPC) DATE: 1/19/2020

SPEC
ASME Section V Nondestructive Examination LOCATION: PCP UNIT 12
MATERIALSTAINLESS STEEL WELDING PROCESS GTAW
CONDITIONCLEAN MATERIAL THICKNESS 4.78mm
PWHT N/A DRAWING NO: MY1008-12LDH05-&MTC030-480214
MAGNETIC PARTICLE INSPECTION DYE PENETRANT TEST
BACKGROUND: NA REMOVER SKC-S Magnaflux
MAGNETIC INK: NA DYE PENETRANT SKL-SP2 Magnaflux
APPARATUS NA DEVELOPER: SKD-S2 Magnaflux
CURRENT: NA METHOD: Colour Contrast
METHOD: NA CURRENT: NA
SUMMARY OF RESULT
IDENTIFICATION INSPECTION FINDING ACCEPT/REJECT REMARKS

DPI ON PIPING WELDED JOINT FABRICATION DEFECT FOUND


(ROOT & CAPPING) INCOMPLETED WELD, NO SIGN OF
INDICATION DETECTED DURING
MPI PERFORM AT BASE METAL OF

JT FW4 ACCEPT
JT FW5 NO INDICATION FOUND ACCEPT
JT SW5A DURING INSPECTION TIME ACCEPT
JT FW1 ACCEPT

EXAMINED BY CLIENT REPRESENTATIVE


NAME NAME

DATE DATE

SIGNATURE SIGNATURE
DYE PENETRANT INSPECTION & MAGNETIC PARTICLE INSPECTION REPORT
PROJECT T4MS REPORT NO: STSEDAC/DPI/PCP/20/001

CLIENT PETRONAS
REFINERY AND PETROCHEMICAL
CORPORATION SDN BHD (PRPC) DATE: 1/19/2020

SPEC
ASME Section V Nondestructive Examination LOCATION: PCP UNIT 12
MATERIALSTAINLESS STEEL WELDING PROCESS GTAW
CONDITIONCLEAN MATERIAL THICKNESS 4.78mm
PWHT N/A DRAWING NO: MY1008-12LDH05-&MTC030-480214
MAGNETIC PARTICLE INSPECTION DYE PENETRANT TEST
BACKGROUND: NA REMOVER SKC-S Magnaflux
MAGNETIC INK: NA DYE PENETRANT SKL-SP2 Magnaflux
APPARATUS NA DEVELOPER: SKD-S2 Magnaflux
CURRENT: NA METHOD: Colour Contrast
METHOD: NA CURRENT: NA
SUMMARY OF RESULT
IDENTIFICATION INSPECTION FINDING ACCEPT/REJECT REMARKS

DPI ON PIPING WELDED JOINT FABRICATION DEFECT FOUND


(ROOT & CAPPING) INCOMPLETED WELD, NO SIGN OF
INDICATION DETECTED DURING
MPI PERFORM AT BASE METAL OF

JT FW4 ACCEPT
JT FW5 NO INDICATION FOUND ACCEPT
JT SW5A DURING INSPECTION TIME ACCEPT
JT FW1 ACCEPT

EXAMINED BY CLIENT REPRESENTATIVE


NAME NAME

DATE DATE

SIGNATURE SIGNATURE