JANUARY 2020

FORMWORK

eMag - Lounge
Constrofacilitator
Digitized knowledge for Construction
Focus on Formwork

Considering the benets that formwork brings, it is certain that its demand will only continue to shoot
upwards. In today's competitive market, contractors and builders are facing tough competitions which
necessitates the use of formwork even more. India is expected to become the third-largest construction
market globally by 2022. The rapid growth of urbanization, major investments in the infrastructure segment
will drive the Indian construction market. With such growth prospects across construction segments, there
are opportunities in the Indian formwork market.

The construction industry is constantly changing, as structures grow taller and oor plates bigger, end-
users are looking for formwork systems that are cost-effective, light, reusable, safe, easy to assemble and
dismantle, durable and exible. In this edition of Emaglounge, we have focused on the different types of
formwork, good practices of formwork, the design aspects of formwork and the demand for formwork for
mass housing.

January 2020 • Constrofacilitator 2


Different Types of Formwork Used
04
in Construction

FORMWORK
08
- A guide to the good practises

Design Requirements of
14
Formwork System

Formwork Technology demand for mass


19
housing

4 8
14 19

3 Constrofacilitator • January 2020


TYPES OF FORMWORK USED IN CONSTRUCTION

Different Types of Formwork Used in


Construction

O
ne essential reports. There is a need to meet the growing made from timber or plywood. This type of
ingredient used demands for building and industrial mate- formwork is typically built on-site and while it
in concrete con- rial manufacturers, suppliers, and retailers. is easy to produce, it has a short life-span
struction is Formwork system is one of those systems
formwork, which inhibits economic structure with less
which are tem- time needed to complete a project.
porary or per-
m a n e n t Discussed below are different types of
moulds into formwork system, traditional as well as inno-
which concrete vative one which are available and in prac-
is poured until the concrete is self- tice in the market.
supporting. In addition to building materials
like timber and steel, the demand for sus- Traditional timber formwork
tainable and environment-friendly products
such as aluminium formwork and used One of the earliest types of formwork is tra-
materials has also risen, according to ditional timber formwork which is generally

January 2020 • Constrofacilitator 04


TYPES OF FORMWORK USED IN CONSTRUCTION

and is very time-consuming, particularly for made with steel or aluminium the form can Stay-In-Place structural formwork sys-
large structures. Today, timber formwork is achieve up to two thousand uses depend- tems
still used where labour costs are low, or ing on care and the applications).
where there are complicated sections that This formwork is assembled on site, usually
require very flexible formwork. Reusable plastic formwork out of prefabricated fiber-reinforced plastic
forms. These are in the shape of hollow
Steel Formwork These interlocking and modular systems tubes, and are usually used for columns
are used to build widely variable, but rela- and piers. The formwork stays in place after
This consists of panels fabricated out of thin tively simple, concrete structures. The pan- the concrete has cured and acts as axial
steel plates stiffened along the edges by els are lightweight and very robust. They are and shear reinforcement, as well as serving
small steel angles. The panel units can be especially suited for similar structure pro- to confine the concrete and prevent against
held together through the use of suitable jects and low-cost, mass housing environmental effects, such as corrosion
clamps or bolts and nuts. The panels can be schemes. To get an added layer of protec- and freeze-thaw cycles.
fabricated in large number in any desired tion against destructive weather, galvanized
modular shape or size. Steel forms are roofs will help by eliminating the risk of cor-
largely used in large projects or in situations rosion and rust. These types of modular
where large number reuses of the shutter- enclosures can have load-bearing roofs to
ing is possible. This type of shuttering is con- maximize space by stacking on top of one
sidered most suitable for circular or curved another. They can either be mounted on an
structures. existing roof, or constructed without a floor
and lifted onto existing enclosures using a
crane.

Flexible formwork

In contrast to the rigid moulds described


above, flexible formwork is a system that
uses a lightweight, high strength sheets of
fabric to take advantage of the fluidity of con-
crete and create highly optimised, architec-
turally interesting, building forms. Using flex-
Engineered Formwork System ible formwork it is possible to cast opti-
mised structures that use significantly less
This formwork is built out of prefabricated concrete than an equivalent strength pris-
modules with a metal frame (usually steel or Permanent Insulated Formwork matic section, thereby offering the potential
aluminium) and covered on the application for significant embodied energy savings in
(concrete) side with material having the This formwork is assembled on site, usually new concrete structures.
desired surface structure (steel, aluminum, out of insulating concrete forms (ICF). The
timber, etc.). The two major advantages of formwork stays in place after the concrete
formwork systems, compared to traditional has cured, and may provide advantages in
timber formwork, are speed of construction terms of speed, strength, superior thermal
(modular systems pin, clip, or screw and acoustic insulation, space to run utili-
together quickly) and lower life-cycle costs ties within the EPS layer, and integrated fur-
(barring major force, the frame is almost ring strip for cladding finishes.
indestructible, while the covering if made of
wood; may have to be replaced after a few -
or a few dozen - uses, but if the covering is

05 Constrofacilitator • January 2020


TYPES OF FORMWORK USED IN CONSTRUCTION

Slab formwork Growth of innovative formwork sys-


tems
Slab Formwork essentially consists of a hori-
zontal load-bearing structure which sup- The advent of innovative designs keeps
ports the formlining and transfers the forces prompting formwork manufacturers to
into the shoring. Some of its types are - Tim- come up with new and custom solutions to
ber beam slab formwork, Traditional slab meet the needs of abstract projects. Dis-
formwork, Metal beam slab formwork, Mod- cussed below are a few of the innovative
ular slab formwork, Table or flying form sys- formwork technology adopted across the
tems and Tunnel forms. globe.

Modular Formwork

Modular Formwork Systems are generally


easy to assemble and much faster than con- Wireless temperature monitoring
ventional Formwork, saving time, allowing formwork system
you to pour sooner.
The constitution of the existing wireless tem-
In addition, with the option to hire, Modular perature monitoring system is in Korea. The
Formwork Systems save contractors by system transmits the temperature data mea-
reducing the costs associated with conven- sured from the sensors wirelessly in real-
tional purchases. This eliminates the need time into the personal computer in the site
to recover purchase costs by reusing or office, and estimates the maturity and con-
Climbing formwork crete strength. The data are also stored in
reselling materials once the job is complete.
There are many advantages to using a Mod- the computer server, and information is
Climbing formwork is a special type of shared with related experts for technical
formwork for vertical concrete structures ular Formwork System that can assist you in
your scope of work. Adding value to your support.
that rises with the building process. While
relatively complicated and costly, it can be project by providing innovative time saving
solutions but never at the expense of safety Fiberglass Shuttering formwork system
an effective solution for buildings that are
either very repetitive in form (such as towers and quality.
Fiberglass Reinforced Plywood System is
or skyscrapers) or that require a seamless the key to that perfectly cast roof with the
wall structure (using gliding formwork, a smoothest finish that requires no plastering.
special type of climbing formwork). This fiberglass shuttering building systems
represent a revolution in the area of shutter-
Various types of climbing formwork exist, ing because of their lightness, simplicity,
which are either relocated from time to time, durability, solidity, resistance to tempera-
or can even move on their own (usually on ture changes and their price competitive-
hydraulic jacks, required for self-climbing ness. One of the major advantages with
and gliding formworks). these systems is that they offer simplifica-
tion of shuttering with the same mechanical
properties of other systems.

Formwork based on ubiquitous comput-


ing

The recent development of ubiquitous com-


puting has resulted in an improvement of
management performance through real-
time monitoring and control. Especially in Tunnel Formwork system
high-rise building construction with rein-
forced concrete structures, form work Tunnel form is a formwork system that
requires effective management systems to allows the contractor to cast walls and slabs
reduce the duration and cost of structural in one operation on a daily cycle. It com-
framework and subsequent activities. bines the speed, quality and accuracy with
Recently, a concrete curing management the flexibility and economy of in-situ con-
system by adapting a ubiquitous comput- struction. Construction durations are
ing environment has been developed as a reduced significantly by this rapid system
method for effective quality management. when compared to conventional methods.

January 2020 • Constrofacilitator 06


TYPES OF FORMWORK USED IN CONSTRUCTION

are prefabricated formwork items. For exam-


ple there are prefabricated formwork for
slab panels and supports and other struc-
tural parts.

Fabric formwork

Fabric formwork is a building technology


that involves the use of structural mem-
branes as the main facing material for con-
Tunnel Form System brings speed, quality
crete moulds. Unlike traditional formwork,
and accuracy to concrete construction and
the material is highly flexible and can deflect
provides big savings in finishing and M&E
under the pressure of fresh concrete. The ties and renovation of old sites across the
works. Hi-tech technologies for steel
resulting forms exhibit curvature as well as globe. Demand for residential spaces due
formwork production make tunnel forms
excellent surface finishes that are generally to rising population will also present poten-
strong & durable. The system creates effi-
not associated with concrete structures. tial growth opportunities for the global mar-
cient load-bearing structures which are
known as the most earthquake resistant ket. Timber and plywood are the key raw
structures. materials used in manufacturing form-
works. However, aluminum formworks are
The result is a cellular reinforced structure, increasingly gaining popularity as they are
the surfaces of which are sufficiently high lightweight and have low density. Aluminum
quality to require only minimal finishing for formworks have longer lifespan compared
direct decoration, while the end walls and to their counterparts made of timber and ply-
facades are easily completed with thermally wood and therefore are more economical
insulated units that can be clad as required. as well. Over the years to come, the market
The system creates an efficient load- is expected to derive significant growth
bearing structure for use in a wide variety of from aluminum formworks.
applications. It is particularly effective in pro-
jects suited to repetitive cellular construc- Construction companies are growing at a
tion such as residential blocks, hotels, stu- rapid rate where overall formwork market
dent accommodation, barracks and pris- size is estimated to reach around USD 6.12
ons. billion by 2024 from 5.21 Billion in 2017 reg-
istering a healthy CAGR. This growth is tak-
Concrete Forms Lining formwork The Perfect Aluminium Panel Formwork ing place because construction companies
System are paying high attention to labor and
Architectural concrete has developed into severe time-saving methodologies.
one of the most important means of design The Perfect Aluminium Panel System is a
in modern architecture. No other building long life and easy maintenance formwork Conclusion
material can be used and processed in system which guarantees 200 times mono-
such a versatile manner. Therefore, archi- lithic pouring. A special extruded profile Formwork makers are situating their R&D
tectural concrete is used for almost all con- made from a robust aluminum alloy pro- towards turning out on account of item
struction tasks. vides the Perfect Aluminium Panel with its developments keeping the interesting work-
high level of rigidity and versatility. Com- ing states of India. Enter a period of gigantic
Through the design capabilities of the fresh bined with superior quality 15 mm thick advancement of moderate lodging ven-
concrete, virtually any shape and quality formwork panel, birch plywood and plastic tures. Numerous sorts of formwork are
can be economically realised with the help overlay the Perfect Aluminium Panel System accessible for any building venture. In light
of appropriate formwork systems and can absorb high levels of concrete pres- of sort, the formwork market is delegated
formlining. sure. The Perfect Aluminium Panel System designed formwork system, conventional
with its systematic modular design and cor- timber formwork, re-usable plastic
rosion resistance offers high assembly effi- formwork, stay set up auxiliary formwork sys-
ciency and good construction quality mak- tems, lasting protected formwork, and
ing it an ideal formwork for the modern con- adaptable formwork.
struction industry.
Image and info:
Potential of formwork system market
cassaform.com.au, hilti.com.my, kmw.pl,
The global formwork market size is jjo33.com, doka.com, wikiwand.com, uni-
Semi-system formwork expected to reach USD 6.06 billion by 2024. span.com.au, archiexpo.com,
The growth is attributed to rapidly expand- r i n c o n r e a l t y. i n , d i r e c t i n d u s t r y. c o m ,
This is a more advanced formwork type ing residential and commercial construc- polytek.com, liveprojectsnetwork.org,
than the modern conventional type as there tion sector due to new construction activi- meva.net

07 Constrofacilitator • January 2020


FORMWORK

FORMWORK
- A guide to the good practises

I
t is important to understand ered for those working with in-situ solu- work carried out to design, construct,
that each project is unique tions specified by the building stake- erect, alter, maintain, dismantle or
and with this, requirements holders. There are various types of con- remove formwork will be defined as
for architectural concrete solu- crete surface finishes achievable and construction work. Formwork means
tions need to be customised which can be considered for those the surface used to contain and shape
and matched to each con- working with in-situ solutions specified wet concrete until it is self-supporting.
crete element and to the by the building stakeholders. This includes the forms on or within
requirements of each struc- which the concrete is poured and the
ture. Helping support in the Formwork is a temporary structure that frames and bracing which provide sta-
selection process, the great- supports part or the whole of a perma- bility. Although commonly referred to
est results arise from close collabora- nent structure until it is self-supporting. as part of the formwork assembly, the
tion amongst all stakeholders involved Individual components of formwork, for joists, bearers, bracing, foundations
in the construction process – from con- example frames, are plant. Once and footings are technically referred to
tractors to architects and also the assembled the components form the as falsework.
formwork supplier. There are various temporary structure. Some formwork
types of concrete surface finishes systems are designed to remain with A safe practice for formwork during con-
achievable and which can be consid- the permanent structure. Generally struction at site is important for safety

08 Constrofacilitator • January 2020


FORMWORK

humidification; overcrowding; lighting;


clean drinking water; latrines and uri-
nals; and spittoons.

Safety of the worker must be ensured


by installing and maintaining the
machinery, mechanisms, transmission
apparatus, tools, equipment and
machines in the best possible safety
c o n d i t i o n s . To o l s , e q u i p m e n t ,
machines, or products used must be
organized properly guaranteeing the
safety of workers. The employer is
obliged to take care to protect the
worker's health and safety by providing
the means of rescue, first aid, and the
cleanup; and arrangements and orga-
nization of the workplace health and
safety duties require duty holders to
consider all risks associated with work,
not only those for which regulations
of workmen. Improper erection of hazards or risks which may arise. and codes of practice exist.
formwork can cause damage to struc-
tural element as well as pose a threat to In accordance with the Factories Act Formwork Construction work inclu-
the safety of workmen. Given below are 1948, an occupier of an establishment sion
good practises that needs to be main- has to ensure the health, safety and wel-
tained for a safer formwork construc- fare of all workers while they are at work Formwork design whether it is Simple
tion. in the factory. or complex requires certain information
prior to commencing of design. It is
Abide by a code of practises It is obligatory for an employer / occu- also the responsibility of the formwork
pier to ensure the provision and main- designer to ensure that he has all rele-
The Formwork Code of Practice is to tenance of plant and systems of work vant input to complete the schemes
give hands-on guidance about ways to that are safe and without health risks. and the design. In case of any missing
manage the formwork in terms selec- Arrangements should be made to rec- details, the same has to be sought from
tion of materials, design, assembly, tify risks involved in use, handling, stor- the relevant person. Most of the
and dismantling procedures and miti- age and transport of articles and sub- branded system formwork company
gating / informing the risk associated stances. before submitting quote or before prep-
with that and also to minimize failures. aration of schemes & design will have
Because failures or unsafe formwork The establishment should be moni- format to be filled by the contractor / cli-
practice will cause financial losses, tored to check the quality of the pre- ent containing project details etc.
accidents some time which involves mises; cleanliness; disposal of wastes which are required as Input.
fatal, time loss etc. Certainly the losses and effluents; ventilation and tempera-
in time and money that go along with ture; dust and fume; artificial A good practise in formwork should
construction mishaps are strong
motivators for safe activity.

A code of practice applies to anyone


who has a duty of care in the circum-
stances described in the code. In most
cases, following an approved code of
practice would achieve compliance
with health and safety duties, in relation
to the subject matter of the code. Like
regulations, codes of practice deal with
particular issues and do not cover all

Constrofacilitator • January 2020 09


FORMWORK

adhere to the following:-

Ÿ Installation or testing carried out in


connection with an activity referred
to in the definition the removal from
the workplace of any product or
waste resulting from demolition
Ÿ The prefabrication or testing of ele-
ments at a place specifically
established for the construction
work, for use in construction work
Ÿ The assembly of prefabricated ele-
ments to form a structure, or disas-
sembly of prefabricated elements
forming part of a structure
Ÿ The installation, testing or mainte-
nance of an essential service for a undertaking has the primary duty to Ÿ Safe erection, alteration, disman-
structure ensure, so far as is reasonably practi- tling and use of formwork, and
Ÿ Work connected with an excava- cable, workers and other people are Ÿ Safe use, handling, storage and
tion not exposed to health and safety risks transport of formwork plant
Ÿ Work connected with any prepara- arising from the business or undertak-
tory work or site preparation ing. This duty requires the person to Designers, manufacturers, suppliers
including landscaping as part of manage risks by eliminating health and and importers of plant or structures,
site preparation carried out in con- safety risks so far as is reasonably prac- including temporary structures, must
nection with ticable, and if it is not reasonably practi- ensure, so far as is reasonably practi-
Ÿ An activity referred to in the defini- cable to eliminate the risks, by minimis- cable, the plant or structure is without
tion above, and an activity referred ing those risks so far as is reasonably risks to health and safety. This duty
to in the definition carried out on, practicable. includes providing information to manu-
under or near water including work facturers so that plant can be manufac-
on buoys and obstructions to navi- It also includes ensuring:- tured and erected to the design specifi-
gation. cations. Designers must give the per-
Ÿ So far as is reasonably practicable son who commissioned the design of
Safety provision for formwork design, provision and mainte- the temporary structure a written safety
nance of safe formwork plant and report.
A person conducting a business or structures
People installing, constructing or com-
missioning plant or structures must
ensure, so far as is reasonably practi-
cable, all workplace activity relating to
the plant or structure including its
installation, use, decommissioning or
dismantling is without risks to health or
safety.

Officers, such as company directors,


have a duty to exercise due diligence to
ensure the business or undertaking
complies with the WHS Act and WHS
Regulation. This includes taking rea-
sonable steps to ensure the business
or undertaking has and uses appropri-
ate resources and processes to elimi-
nate or minimise risks from the
formwork activity.

10 Constrofacilitator • January 2020


FORMWORK

Consulting workers

Consultation involves sharing of infor-


mation, giving workers a reasonable
opportunity to express views and tak-
ing those views into account before
making decisions on health and safety
matters. Consultation with workers and
their health and safety representatives
is required at each step of the risk man-
agement process. In many cases deci-
sions about construction work and pro-
jects are made before engaging work-
ers so it may not always be possible to
consult with workers in these early
stages. However it is important to con-
sult with workers as formwork activities
progress. By drawing on the experi-
Managing risks in formwork activities support capacity; - Formwork structure ence, knowledge and ideas of your
stability - Placement of rebar; - Con- workers you are more likely to identify
Control measures to manage the risk of crete casting; - Working at height; - hazards and choose effective control
falls must be implemented in an order Monitoring of formwork; - Formwork measures. You should encourage your
of priority and implemented before leakage; - Formwork structural failure; - workers to report hazards and health
work commences. In many developed Settlement of formwork structure; - and safety problems immediately so
countries, risk management is consid- Repair of formwork structure; - Emer- the risks can be managed before an
ered important for all hazardous indus- gency escape route; and - Emergency incident occurs and you must consult
tries like construction. It is mandatory response plan. your workers when proposing any
for all workplaces, and is enforced changes to the work that may affect
strictly for high-risk activities such as All reasonably practicable steps shall their health and safety.
work at height. Accident investigations be taken to eliminate any foreseeable
by the Ministry of Manpower (MOM) risk arising from the work to be done. Design of formwork structure
often highlight the absence of or inade- Where it is not possible to eliminate the
quate risk assessment as a cause. risk, control measures and safe work All formwork structures (including but
procedures shall be implemented to not limited to beam, slab, wall, column,
Ÿ To properly manage risks, a per- minimise and control the risk. cantilevered, curved and sloped
son must
Ÿ Identify hazards - find out what
caused the harm
Ÿ Assess risks that may result
because of the hazards - under-
stand the nature of the harm that
could be caused by the hazard,
how serious the harm could be
and the likelihood of it happening
Ÿ Decide on control measures to pre-
vent, or minimise the level of, the
risks and implement control mea-
sures, and
Ÿ Monitor and review the effective-
ness of the measures

The risk assessment should look into


the following areas, but not limited to: -
Formwork structure erection, alteration
and dismantling procedures, - Base

Constrofacilitator • January 2020 11


FORMWORK

formwork) shall be capable of with-


standing the total dead load, live load
and impact load imposed on it with a
minimum safety factor of 2.

A Professional Engineer shall be


engaged to design a formwork struc-
ture that is: - supporting a slab or beam
to be cast that is greater than 300 mm
thick; - greater than 9 m in height; or -
constructed in 2 or more tiers.

The Professional Engineer who


designs the formwork structure shall
take, so far as is reasonably practica-
ble, such measures to ensure that his lations, drawings and construction cesses and implement the necessary
design can be executed safely by any (erecting, dismantling and reshoring) preventive measures to ensure that his
person who constructs or uses the procedures to facilitate the proper con- undertaking can be and is carried out
formwork structure according to his struction and dismantling of the safely. Formwork structures are to have
design. The Professional Engineer's formwork structure according to his suitable edge protection to prevent
design should include the following design. formwork and concreting workers from
considerations, but not limited to: - Ver- falling from height. Measures to pre-
tical and horizontal formwork compo- The drawings of the formwork structure vent falling from height as highlighted
nents; - Bracing members; - Connec- should also include the safe means of in the Fall Prevention Plan are to be
tions; and - Support on which the access7 and escape routes for work- implemented. Where a formwork struc-
formwork rest. The formwork design ers involved with the formwork struc- ture is designed by a Professional Engi-
should encompass all sides, corners ture. These should be clearly shown on neer, placement of concrete shall not
and bends supporting the concrete to the drawing plan. commence unless the formwork struc-
be cast. Bracing and coupling details ture, including any alteration thereto,
should be provided in the design to Concreting has been inspected and certified safe
ensure clarity. for its intended use by a Professional
Every responsible person undertaking Engineer.
The Professional Engineer who any work including erecting / disman-
designs the formwork shall also pro- tling the formwork structure, installing During concreting, the formwork sys-
vide to any person constructing the steel reinforcement or concreting tem should be regularly monitored by
formwork structure all design docu- works is reminded to conduct a thor- the formwork supervisor for move-
mentation, including all relevant calcu- ough risk assessment on his work pro- ment, stability and soundness. The
formwork supervisor and any other
workers should not work under or in
close vicinity of the formwork structure
while the pouring of concrete is in prog-
ress. Proper risk assessment shall be
conducted to ensure that the formwork
supervisor watching the formwork is
not exposed to the risk from formwork
structure collapse.

If, during concreting, any weakness


develops and the formwork shows any
undue settlement or distortion, all work
shall be stopped immediately. Prior to
the commencement of any adjust-
ment, strengthening or repair works, a
thorough assessment of risk shall be
conducted and all necessary mea-

12 Constrofacilitator • January 2020


FORMWORK

determined by the Qualified Person.


The manner of dismantling a formwork
structure should be in accordance to
the Professional Engineer's disman-
tling procedures, taking into account
that the formwork structure could be
unstable during dismantling.

Conclusion

The Construction Industry is a multifac-


eted industry, characterized by a broad
range of high risk activities and com-
plex work arrangements.The inherent
risks in the building and construction
industry makes it one of the priority
sures to be taken to ensure that work- erecting and dismantling formwork areas for providing a safe environment
ers will not be exposed to risks from structures are prevented from falling for Contractors, subcontractors and
formwork structure collapse. from height. Measures may include pro- their workers to face risks from hazards
visions of safe work platforms with that must be managed to prevent
Erection of Formwork Structure proper guard-rails and personal fall deaths, injuries and illnesses.
arrest system, complete with safe and
The Occupier shall ensure that every secure anchorages. Where it is a As already stated earlier, Formwork is
formwork structure shall - be of sound requirement for a Professional Engi- an important activity which needs to be
material, good construction and ade- neer to design a formwork structure, given major attention when it comes to
quate strength; - be free from patent the formwork structure shall be con- Safety during Construction. Even
defect; - be suitable and safe for the structed in accordance with the design though the safety and construction is
purpose for which it is intended; and - and drawings of the Professional Engi- the responsibility of the builder or con-
be properly braced or tied together so neer. tractor, it is necessary that formwork
as to maintain position and shape. designs and drawings are reviewed
No alteration shall be made or allowed and approved. In these cases, the con-
Formwork components used to erect to be made to a formwork structure tract document shall clearly specify
the formwork structure shall be of good designed by the Professional Engineer that the designs and drawing of
condition and free from corrosion. As unless its design and drawings have formwork will be reviewed and
the structural capacity of the formwork been reviewed and endorsed by a Pro- approved by Engineer – In-Charge. In
structure is expected to be reduced fessional Engineer. After erection, the order to bring the standard of construc-
over time, for example due to corro- Professional Engineer appointed by tions in India to International levels, the
sion, Occupiers may consider, as an the Occupier to oversee the construc- consultants should specify, systemise
additional safety precautionary mea- tion of the formwork structure, shall and implement the right formwork sys-
sure, conduct a load test (in the testing take so far as is reasonably practica- tem for the projects and also the stan-
laboratory) to verify the design ble, such measures as are necessary dardization body of India also to look to
assumptions of the strength of the to ensure that the formwork structure - bring in more detailed Code of
formwork structure and their support- is constructed in accordance with the Formwork practice in India to suit the
ing bases, especially for casting of sig- design of the Professional Engineer available materials / system and
nificant structures. Couplers used for who designed it and is safe for its formwork practices in India.
bracing and tying the formwork struc- intended use when completely con-
ture together shall be fit-for purpose, ie. structed and if so, issue a certificate Source
right-angled couplers used for perpen- stating that the formwork structure is
dicular members and swivel couplers safe for its intended use. w s h c . s g , w o r k s a f e . q l d . g o v,
used for bracing. Using the wrong com- thenbs.com, acchelp.in, iijrte.com,
ponents could reduce the structural Dismantling of formwork structure ihsti.com, metsawood.com,
capacity of the formwork structure. formworkscaffoldingsystems.com,
Responsible persons shall establish A formwork structure should only be mevaformwork.com, concrete.org.uk,
and implement a Fall Prevention Plan dismantled after the concrete has suffi- paschalindia.com, cassaform.com.au
to ensure that their workers who are ciently set and after a period of time as directindustry.com,

Constrofacilitator • January 2020 13


FORMWORK SYSTEM

Design Requirements of
Formwork System

Shamanth Kumar M
Project Engineer and
Manager of Design Services
Salarpuria Sattva Group

14 Constrofacilitator • January 2020


FORMWORK SYSTEM

F
ormwork is used as a tempo- damage to permanent work. Three gen- ments i.e. columns and walls are sub-
rary structure to support the eral principles govern formwork design ject to pressures on the form face. This
fresh (i.e., uncured) concrete and construction: is caused by the fluid action of the fresh
until it is strong enough to sup- concrete. The pressure of the fluid con-
port itself and the applied Ÿ Quality accuracy of the concrete crete on the vertical faces increases pro-
loads. Formwork is a very significant shape and the final finished sur- portionately with the depth of con-
portion of the project, as much as 60% face quality. crete. The maximum pressure being at
of the final cost of the finished concrete Ÿ Safety strength of the formwork the bottom of the form. This maximum
project. structure. Personal safety of peo- pressure for the full depth fluid con-
ple, both carpenters and the pub- crete is the hydrostatic pressure for con-
INTRODUCTION lic. crete and usually occurs when the con-
Ÿ Economy: The structural frame is crete is placed very quickly.
A number of fundamental principles usually the most significant cost
apply to all formwork. component, a dominant and criti- It should not be possible for the bracing
cal factor in the time of construc- to be dislodged by impact, or wind, act-
Consideration must be given to:- tion. ing from any direction. Refer to illustra-
tion 1.
Ÿ Acceptable tolerances permitted Design Requirements of Formwork
Ÿ Use of appropriate materials II. Speedy erection and dismantling:
Ÿ Standards of workmanship When designing formwork, consider The formwork design and the methods
Ÿ Construction for ease of erection the following: of assembly must be as simple as possi-
and stripping ble to reduce time spent in erection and
Ÿ Care and maintenance of the I. Strength: Forms and shutters have to dismantling. The formwork should be
formwork, so that the maximum be designed to support dead weight, Simple to remove without causing dam-
number of re‐uses can be live load and hydrostatic pressure. age to the concrete.
achieved. Sheathing must be rigid enough to
resist bulging. III. Tightness of joints: The liquid
Formwork is a temporary construction; retaining properties of the formwork
however care must be taken to prevent Formwork for vertical concrete ele- must be adequate to prevent leakage of
cement and fine aggregate from the
concrete.

IV. Rigidity: Brace formwork and sup-


port to ensure no movement may take
place under wind pressure, or when the
concrete is being placed and vibrated.
The shutters must be rigid enough to
keep the concrete member within the
allowable tolerances.

V. Reuse: Design for unit construction,


if possible, so that you can strike and
reuse as soon as possible. Use clamps,
wedges, and similar devices to hold sec-
tions of formwork in place. Avoid nail-
ing as much as possible, nail holes and
bruising of the timber will spoil
formwork for further use. The
formwork material must be durable
and capable of producing a good sur-
face finish.

VI. Ease of handling: Forms and shut-


ters must be of a size and weight that
Illustration 1 can be handled by the labour and plant

Constrofacilitator • January 2020 15


FORMWORK SYSTEM

available on site.

Adjustment: Arrange all props, shores,


and struts so that they can be properly
adjusted. They must bear on sole
plates, so that the load is safely distrib-
uted on to the structure below.

Removal of debris: Provide all formwork


with special cleanout holes to allow for
the removal of sawdust, shavings, and
other debris from the bottom of the
formwork before the pour begins.

Factors Relating to Formwork

To design and construct satisfactory


formwork an appreciation of the types
of loads and combinations of loads that
Fig 2: Timber formwork for columns
act on the formwork is required.
is reduced as the semi‐liquid concrete area etc. so as to permit reuse of
The heaviest load on forms usually hardens and becomes self-supporting. the formwork repeatedly.
occurs when the concrete is being Formwork construction must be able to Ÿ Design should be perfect to use
placed. As well as the weight of the con- withstand the loads imposed. slender sections only in a most eco-
crete itself, (i.e. dead load), allowance nomical way.
for the concreting gang and their gear Economy in Formwork Ÿ Minimum sawing and cutting of
must be considered, (i.e. live load). wooden pieces should be made to
Depositing wet concrete in heaps cre- The following points are to be kept in enable reuse of the material a num-
ates uneven pressure on the formwork. view to effect economy in the cost of ber of times. The quantity of sur-
It is important to evenly place the con- formwork: face finish depends on the quality
crete in layers, distributing loads of the formwork.
equally on the formwork. In walls, wet Ÿ The plan of the building should
concrete exerts horizontal bursting pres- imply minimum number of varia- Formwork can be made out of timber,
sures on the vertical soffit. The pressure tions in the size of rooms, floor plywood, steel, precast concrete or

Fig 1: Formwork to Retaining wall

16 Constrofacilitator • January 2020


FORMWORK SYSTEM

fiberglass used separately or in combi- SL. NO. DESCRIPTION OF STRUCTURAL MEMBER TIME PERIOD
nation. Steel forms are used in situation
where large numbers of re-use of the 1 Walls, columns and vertical sides of beams 1 to 2 days
same forms are necessary. For small
2 Slabs (props left under) 3 days
works, timber formwork proves useful.
Fibre glass made of precast concrete 3 Beam softs (props left under) 7 days
and aluminium are used in cast-in-situ REMOVAL OF PROPS TO SLABS
construction such as slabs or members 4. (a) For slabs spanning up to 4.5 m 7 days
involving curved surfaces.
(b) For slabs spanning over 4.5 m 14 days
Types of Formwork (Shuttering) for REMOVAL OF PROPS TO BEAMS AND ARCHES
Concrete Construction: 5. (a) Spanning up to 6 m 14 days
1) TIMBER FORMWORK (b) spanning over 6 m 21 days

Table: Period of Removal of Formwork


Timber for formwork should satisfy the
following requirement: It should be attached to timber frames to make up reuses can be taken as 20 to 25.
panels of required sizes. The cost of ply-
Ÿ Well-seasoned wood formwork compares favourably 3) STEEL FORMWORK
Ÿ Light in weight with that of timber shuttering and it
Ÿ Easily workable with nails without may even prove cheaper in certain cases This consists of panels fabricated out of
splitting in view of the following considerations: thin steel plates stiffened along the
Ÿ Free from loose knots edges by small steel angles. The panel
Ÿ It is possible to have smooth finish units can be held together through the
Timber used for shuttering for exposed in which case on cost in surface fin- use of suitable clamps or bolts and
concrete work should have smooth and ishing is there. nuts. The panels can be fabricated in
even surface on all faces which come in Ÿ By use of large size panels it is pos- large number in any desired modular
contact with concrete. sible to effect saving in the labour shape or size. Steel forms are largely
cost of fixing and dismantling. used in large projects or in situation
2) PLYWOOD FORMWORK Ÿ Number of reuses is more as com- where large number reuses of the shut-
pared with timber shuttering. For tering is possible. This type of shutter-
Resin bonded plywood sheets are estimation purpose, number of ing is considered most suitable for cir-

Fig 3: Plywood formwork for Retaining Wall

Constrofacilitator • January 2020 17


FORMWORK SYSTEM

cular or curved structures. SL TIMBERWOOD PLYWOOD STEEL


DESCRIPTION
NO FORMWORK FORMWORK FORMWORK
Steel Forms Compared with Timber
Formwork: Lesser compared to Compared to steel Compared to both the
1. COST PER sqM plywood and steel formwork this is formworks it is bit
Ÿ Steel forms are stronger, durable formwork economical. costlier.
and have longer life than timber No of repetitions is
formwork and their reuses are No of Repetitions is No of repetitions is
2. DURABILITY more compared to
less more.
more in number. timber wood formwork
Ÿ Steel forms can be installed and dis- Ancient way of Modern way of Modern way of
mantled with greater ease and 3. TECHNOLOGY
Technology technology technology.
speed.
Fixing is bit difcult
Ÿ The quality of exposed concrete sur- 4. HANDLING
Fixing is easy but Fixing is easy but
difcult. but deshuttering is
face by using steel forms is good difcult to deshutter
easy.
and such surfaces need no further
Bulging may happen if Bulging may happen if
treatment. there’s is no proper there’s is no proper Finishing is good.
5. FINISHING
Ÿ Steel formwork does not absorb support support
moisture from concrete.
Ÿ Steel formwork does not shrink or
warp. Ÿ Cleaning and surface treatment sides should be removed first as
they bear no load but only retain
Construction of Concrete Formwork Order and Method of Removing the concrete.
Formwork Ÿ Shuttering forming soffit of slabs
This normally involves the following should be removed next.
operations: The sequence of orders and method of Ÿ Shuttering forming soffit of
removal of formwork are as follows: beams, girders or other heavily
Ÿ Propping and centring loaded shuttering should be
Ÿ Shuttering Ÿ Shuttering forming the vertical removed in the end.
Ÿ Provision of camber faces of walls beams and column
Rapid hardening cement, warm
weather and light loading conditions
allow early removal of formwork. The
formwork should under no circum-
stances be allowed to be removed until
all the concrete reaches strength of at
least twice the stresses to which the con-
crete may be subjected at the time of
removal of formwork. All formworks
should be eased gradually and carefully
in order to prevent the load being sud-
denly transferred to concrete.

Conclusions

Productivity rate is very important in esti-


mating cost and duration for construc-
tion projects, and any labour productiv-
ity loss would affect the whole project
in time and cost.

To prevent productivity loss, factors


that affect productivity mentioned ear-
lier rates should be examined as possi-
ble.
Fig 4: Steel formwork for slab

18 Constrofacilitator • January 2020


FORMWORK TECHNOLOGY DEMAND

Formwork Technology demand for mass


housing

C
onstruction is use the building for the intended purpose demands for housing calls for adoptions
one of the sig- as soon as possible. The contractor wants of appropriate building technology which
nificant sec- to finish the construction as soon as possi- could lead to economy and speed in con-
tors of the ble to gain a higher profit. The most effi- struction. As a result of experimentation
Indian econ- cient way to speed up the work in mass of innovating construction techniques and
omy and is an housing construction is by achieving a modern construction management, it is
integral part of very short floor cycle. The floor cycle of a now possible to achieve an overall saving
the develop- building mainly depends on the formwork to the extent of 10 percent in the total cost
ment. Today type, as it is the main time factor of a of housing construction compared to the
India's urban building project. cost of traditional housing. There is grow-
population is the second-largest in the ing realization today that the speed of con-
world and its future development leads to According to the Federation of Indian struction needs to be given greater impor-
increased demand for housing to cope Chamber of Commerce and Industries tance, especially for large housing pro-
with this problem India should desper- (FICCI), keeping in view the existing jects. This is not only essential for the
ately need to plan for acquisition of land housing crisis, the country shall need the faster turnover of equipment and invest-
and rapid creation of dwelling units. One addition of more 2.5 million new dwelling ment also leading possibly to the reduc-
of the most important factors in determin- units annually. The recent years voiced tion in the housing cost - but also for
ing the success of a construction project in the active participation of private sectors achieving the national objective of creat-
terms of speed, quality cost and safety of in finding the solution over the prevailing ing a large stock to overcome the shortest
workers is the formwork used in the pro- situation on the housing front. Keeping in possible time.
ject as it accounts for about 35 to 40 per- view the gigantic task of providing afford-
cent of the total project cost of the struc- able shelter to masses, the adoption of a The disparity between the supply and
ture. When considering a construction pro- cost-effective technology assumes demand for affordable housing is tremen-
ject both the client and contractor want to greater significance. The present strain on dous. Rapid urbanization has resulted in a
finish the job early as the client wants to the Indian economy and the overgrowing geometric increase in the housing

January 2020 • Constrofacilitator 19


TYPES OF CLAY IN CONSTRUCTION

demand, which cannot be fulfilled using


conventional materials and methods of
construction. The traditional or conven-
tional method of construction for mass
housing is comparatively, a slow process
and has limited quality control, particu-
larly when a large size project is involved.
It is, therefore, obligatory to work out a
method or a scheme where the speed and
quality of construction are controlled auto-
matically by a systematic approach.
Therefore Formwork System identified to
be suitable for Indian conditions for mass
housing construction where quality and
speed can be maintained at a reasonably
high level. It is adaptable for any design of
a building and establishes a kind of assem-
bly-line production.
Formwork technology vs traditional face to face with the reality of earth-
Formwork technology is one the best method quakes, with their durability, high tech-
choice for mass housing owing to its flexi- nology and superior earthquake perfor-
ble design nature and cost. Formwork is a In typical floor construction, around 20 mance. This technology also allows for
die or a mould including all supporting percent of cost saving is possible in box the opportunity to provide very special
structures, used to shape and support the type structure over framed structure. comfort conditions to the users and pro-
concrete until it attains sufficient strength Almost 40 percent savings in project dura- ducing buildings with maximum energy
to carry its own weight. It should be capa- tion in Box type structure over framed performance by means of its flexible
ble of carrying all imposed dead and live structure. Construction cost escalation, design criteria provided in the architec-
loads apart from its own weight. Labor rates increases every year at the per- ture. Efficiency and productivity is
Formwork has been in use since the begin- cent of 2 to 5. Cement and steel price increased by eliminating unnecessary
ning of concrete construction. New mate- increases every year at the percent of 10 to material usage. It is built 3 times faster
rials such as steel, plastics, fiber glass and 15. Around 5 to 8 percent Savings in pro- than traditional building systems. On the
Aluminium are used in formwork. Greater ject cost is possible on reducing over- other hand, high quality and low cost prod-
attention is being given to the design, fab- heads by early completion of projects. ucts are offered to the users.These hous-
rication, erection and dismantling of High return on investment is possible. ings, built with 90% recycled steel, are
formwork as a temporary structure. Form environment-friendly and examples of
work includes the surface in contact with Housing built with formwork technology sustainable architecture by their nature.
the concrete and all necessary supporting are positively discriminated against other The system stands out with its advantages
structure. building systems in our country, which is in fire and insulation with A-1 class
incombustible and eco-friendly fiber
cement used in the coating of all steel car-
casses. Therefore, designs created within
the frame of green building/ecological
building are realized in maximum produc-
tivity with this technology.

Popular formwork construction for


mass housing

There are several types of formwork con-


struction but perhaps alumunium, tunnel
and climb formwork are the most pre-
ferred ones for mas housing.

Aluminium Formwork System

Aluminium Formwork System is a con-


struction system for forming cast in place
concrete structure of a building. It is also a
system for scheduling and controlling the

20 Constrofacilitator • January 2020


TYPES OF CLAY IN CONSTRUCTION

work of other construction trades such as average use-cost. when compared to conventional methods.
steel reinforcement, concrete placement Tunnel Form System brings speed, qual-
and mechanical and electrical conduits. The assembly of aluminum alloy ity and accuracy to concrete construction
formwork is simple and convenient; the and provides big savings in finishing and
The System is fast, simple, adaptable and average weight is 23-24kg/m2. It can com- M&E works. Hi-tech technologies for
very cost effective. It is unique because it plete assembly by manual without any steel formwork production make tunnel
forms all of the concrete in a building machines assistance. (Normally, the con- forms strong & durable. The system cre-
including walls, floor slabs, columns, struction workers only need a spanner or a ates efficient load-bearing structures
beams, stairs, window hoods, balconies small hammer to assemble or remove). A which are known as the most earthquake
and various decorative features in exact skilled installation worker can install 20- resistant structures. The result is a cellular
accordance with the architects' design. 30 square meters per day (compared with reinforced structure, the surfaces of which
The dimensional accuracy of the con- the wooden formworks, aluminum form- are sufficiently high quality to require
creted work also results in consistent fit- works do not require the technicians but a only minimal finishing for direct decora-
tings of doors and windows. The simple training to the construction work- tion, while the end walls and facades are
smooth–off form finish of the concrete ers before the installation). easily completed with thermally insulated
eliminates the need for costly plastering. units that can be clad as required. The sys-
Aluminum alloy formwork system is a tem creates an efficient load-bearing
Aluminium Formwork System provides fast assembles and removal system that structure for use in a wide variety of appli-
Aluminium Formwork for RCC load bear- shorten the construction period and save cations. It is particularly effective in pro-
ing or RCC framed multi-storied build- the administration cost. A set of formwork jects suited to repetitive cellular construc-
ings and enables the walls and slabs to be can build one storey in every four days tion such as residential blocks, hotels, stu-
poured in the same operation. These under a normative construction. Alumi- dent accommodation and barracks. Tun-
increases efficiency and also produces an num alloy construction formwork came nel form is a formwork system that allows
extraordinarily strong structure with with different standard sizes and is flexi- the contractor to cast walls and slabs in
excellent concrete finish. Due to the fine ble to assemble according to the require- one operation in a daily cycle. It combines
tolerance achieved in the machined metal ment of the respective projects. Only 10- the speed, quality and accuracy of fac-
formwork components, consistent con- 15% of non standard board needs to be tory/off-site production with the flexibil-
crete shapes and finishes are obtained replaced when the formwork is reused for ity and economy of in-situ construction
floor after floor. This allows plumbing another new project and reduced the cost. and is recognised as a modern method of
and electrical fittings to be prefabricated All parts of Aluminum alloy formwork is construction (MMC).
with the certain knowledge that there will assembled by Aluminum Alloy Plate.
be an exact fit when assembled. Once the system is assembled, it will be The result is a cellular reinforced struc-
formed a complete framework with very ture, the surfaces of which are sufficiently
Unlike other construction systems, good stability and Bearing capacity of up high quality to require only minimal fin-
Formwork Systems of aluminium forms to 60 k per square meter. ishing for direct decoration, while the end
can be erected by unskilled labour and walls and facades are easily completed
without the need for hoisting cranes. The Tunnel Formwork System with thermally insulated units that can be
largest panel weighs not more than 25 kgs clad as required.
which means it can be handled by a single Tunnel form is a formwork system that
worker. allows the contractor to cast walls and Tunnel form systems are used to construct
slabs in one operation on a daily cycle. It repetitive cellular structures (such as
It can be used repeatedly with low average combines the speed, quality and accuracy hotels and apartment blocks) and enable
use-cost: Aluminum alloy formwork sys- with the flexibility and economy of in-situ the construction of horizontal and vertical
tem adopts the integral extrusion forming construction. Construction durations are elements (floors and walls) together. Each
as raw materials (6061-T6). With a nor- reduced significantly by this rapid system unit is in the form of an inverted L, the ver-
mative construction, a set of formwork tical leg being the formwork for one face
can be used more than 300 times in a low of a wall and the horizontal leg being sof-
fit formwork. Several units are erected
together to create the formwork for a num-
ber of 'tunnels' consisting of walls and ceil-
ing slab. The normal dimensions of tunnel
form units are 8 to 11m long and 2.4 to
6.8m wide, but individual units can be
joined to give tunnels of greater length.
The forms are positioned, reinforcement
is fixed and the concrete poured and
cured. When the concrete has achieved
sufficient strength the forms are lowered
and moved to the next location.

January 2020 • Constrofacilitator 21


TYPES OF CLAY IN CONSTRUCTION

The system creates an efficient load- very large concrete structures to be con- the market.
bearing structure for use in a wide variety structed in one single pour (which may
of applications. It is particularly effective take days or weeks as the formwork rises Around 2 million homes need to be built
in projects suited to repetitive cellular con- with the process), thus creating seamless by 2022 to achieve the ambitious goal of
struction. The large bays constructed structures with enhanced strength and the Modi government's 'Housing for All'.
using tunnel form provide exceptional visual appearance, as well as reducing con- As per Colliers Research, to achieve such
flexibility in the design and layout of the struction times and material costs (at the a huge objective, it is imperative to adopt
building and allow a high degree of free- joints which would otherwise require newer technologies at a much faster pace.
dom in the final appearance. extra reinforcement / connectors) An Adoption of such technologies will not
advantage of guided climbing systems is only reduce the turnaround time but also
Tunnel form has integral working plat- that they remain connected to the building improve the quality and durability of con-
forms and edge protection systems. In during the lifting process.The climbing struction and help in generating more
addition, the repetitive, predictable nature formwork structure normally does not interest in affordable housing projects
of the tasks involved encourages familiar- only contain the formwork itself, but also among buyers.
ity with operations, and, once training is usually provides working space / scaf-
complete, productivity improves as con- folds for construction crews. It may also Private developers are continuously
struction progresses. The minimal provide areas for machinery and screens exploring new technologies that improve
requirement for tools and equipment for weather protection, up to being fully the quality, strength and safety of the
when moving the tunnel form further enclosed while yet staying modular buildings. In metro cities, few developers
reduces the risk of accidents on site. around a changing building structure. have started using technologies such as
self-climbing formwork and aluminum
Climbing formwork system Normally, this type of formwork is con- shuttering. These technologies are not
structed from steel members. Concrete only cost-effective, but offer advantages
Climbing formwork is a special type of form panels are attached to this frame; such as minimal labour force, higher
formwork for vertical concrete structures some of them supported on rollers. After earthquake resistance, more durability
that rises with the building process. While the concrete walls are poured, it is than conventional building techniques,
relatively complicated and costly, it can released and moved away from the wall. higher carpet area, smooth finish on walls
be an effective solution for buildings that Then, if self-climbing formwork is being and lower on maintenance.
are either very repetitive in form (such as used, jacks lift the frame up to the next
towers or skyscrapers) or that require a level or to the next area where it will be Conclusion
seamless wall structure (using gliding used. This is normally a relatively fast pro-
formwork, a special type of climbing cedure. There's no doubt that construction has
formwork). formed the basis of modern civilization.
Once the climbing formwork is in posi- Whether it be buildings, houses, roads,
Best known in the construction of towers, tion, the panels are closed, and the next tunnels or bridges, construction has
skyscrapers and other tall vertical struc- concrete wall is poured. The cycle contin- enabled humans to evolve by providing
tures, it allows the reuse of the same ues, which is normally three to five days. the means necessary to make our lives eas-
formwork over and over and over for iden- Faster times can be achieved but you will ier and more comfortable. Since its incep-
tical (or very similar) sections / stories fur- need a really specialized and trained crew. tion, modern technology has played a cru-
ther up the structure. It can also enable However, the limiting factor to faster cial role in the construction industry. Hav-
times is usually the construction of the ing the ability to design and construct
floor slabs, which are poured as a separate entire structures digitally has signifi-
process. cantly increased speed and efficiency and
considerably reduced costs at the same
New age technologies adopted Housing time. Formwork has developed into an
for All by 2022 ancillary construction, where temporary
or permanent moulds are used into which
The construction industry is rapidly fresh concrete is poured that subsequently
changing and new materials, construction hardens. Forms or shutters are the terms
technologies are being introduced on a reg- used for made up sections that touch the
ular basis. Execution of construction pro- concrete while it is hardening.
jects and their delivery in a timely manner
has become a prime concern for develop- Source
ers in view of the buyer's agitation on
delay in construction. Especially after iaeme.com, iitk.ac.in, prefabrikyapi.com,
RERA, which emphasizes the need of smartnet.niua.org, bslscaffolding.com,
timely completion of projects, adoption of financialexpress.com, goomaxalu.com,
modern technologies has become the need ulmaconstruction.com, doka.com,
of the hour for a developer to survive in winntus.com.

22 Constrofacilitator • January 2020


What is the huss about Mag-Lounge

Mag-lounge is a digital medium for interaction among the various personnel among the
construction industry namely, Manufacturers, Business to Business users and the Civil
Engineering professionals.

Project Engineers

Architects

Builders
Discussion
of challenges
of the Manufacturers

construction
industry Structural Engineers
and Consultants

MEP Contractors

EPC Contractors

If you want to feature your products, case studies, and challenging projects,
please mail us at admin@constrofacilitator.com
www.constrofacilitator.com

DIGITAL
PROMOTIONS
CONTENT
CREATION,
SOCIAL MEDIA AMPLIFICATION
MAINTENANCE &
PROMOTION

WHAT
WE DO FOR
INDUSTRY
BASED CONSTRUCTION
NEWSLETTER INDUSTRY
DESIGN AND SOCIAL MEDIA
PROMOTIONS MARKETING
Online Portal for Architecture, Civil and
Infrastructure industry.
WEBSITE
DEVELOPMENT EVENT
AND PROMOTION
MAINTENANCE MANAGEMENT

You might also like