Increased security

and maximized · definition of short-term actions, and


a medium- and long-term strategic
protection system development plan

utilization The solution


Power and Protection System
Modeling:
A detailed power and protection sys-
Protection and system security tem model was built and benchmarked
with GRIDCo‘s existing PSS®E model.
improvement in Ghana The geographic system model that was
developed includes a detailed internal
substation model with all circuit break-
ers (CBs), current transformers (CTs),
voltage transformers (VTs) and protec-
At a glance available in a central database or tion relays.
Rapidly increasing load growth is a ma- power system simulation software. No
jor challenge and driver for large-scale system-wide coordination and check of
system expansion in Ghana. In the last protection settings was possible.
five years the transmission system op-
The following tasks and workflow were
erator, GRIDCo, increased its trans-
defined to review and improve the ex-
former capacity by over 50 per cent.
isting systems’ performance:
Even so, the transmission system is of-
ten forced to operate close to its limits · review of existing protection system
due to a lack of generation capacity. In and generation system stability to
the past, mal-operation of the protec- achieve performance improvements
tion system and cascading events were
· development of enhanced protec-
observed. Considering low critical fault
tion schemes and relay settings cal-
clearing times, the situation poses a
culation guidelines
high risk of total system blackout in
case of failure of the primary protec- · calculation of new improved set-
tion system. tings and verification of their per-
formance through simulation
In order to reduce the risk of system
collapse, GRIDCo initiated a system-
wide protection system review. The
objective was to ensure system securi- Figure 1: Power and protection system model
ty and to maximize the utilization of
the system through improvement of
the performance of the protection sys-
tem.
GRIDCo is the national interconnected transmission system operator of
Initial situation and challenge Ghana. Its mission is to provide reliable, secure, and efficient electricity
In general, protection settings were transmission services and wholesale market operations to meet stakehold-
calculated by different substation ven- er expectations within Ghana and the West African Sub-region, in an envi-
dors or consultants. The protection ronmentally sustainable and commercially viable manner.
system model and settings were not

siemens.com/power-technologies
“The project results covered all required aspects of the Terms of
Reference and contain important information for an improved net-
work protection system. We are looking forward to continue our
business relationship with Siemens PTI.”
Dr. Thomas Ansah, CEO at GRIDCo

All protection setting parameters were In this state-of-the-art approach, the · assessment of the performance of
collected in the field and imported into protection system performance is as- the existing protection system,
the system model. The zero-sequence sessed by simulation, and not only us- showing its specific characteristics,
and mutual coupling was amended to ing the classical approach of solely de- behavior, weak points and limita-
simulate single-phase faults with the picting setting values. The new meth- tions
highest possible accuracy. The model odology sets itself apart from the con-
· development of newly improved
building process was complemented ventional, and individual, evaluations
protection settings, grading rules,
with multi-level data plausibility checks of distance, differential and overcur-
scheme recommendations and an
for highest data quality. rent time relay characteristics by as-
under-frequency load shedding
sessing the combined ‘system’ re-
Scenario Building: To systematically scheme based on the review find-
sponse with all main and back-up pro-
assess protection system performance, ings. Validation of new settings by
tection relays in the power system.
a multitude of fault scenarios with var- simulation before approval
ying fault location, type and arc re- The quality of the protection system
· recommendations for the efficient
sistance were defined. performance is depicted by color-
future strategic development of the
coding that is meaningful for both
Simulation and Performance Assess- protection system
technical and non-technical staff. Re-
ment: Siemens PTI’s SIGUARD PSA (Pro-
sults can be aggregated for complete · knowledge transfer for staff
tection Security Assessment) solution
network regions or detailed for indi- through regular workshops and cus-
was used to simulate selectivity, sensi-
vidual power system components or tomized training
tivity and speed of the protection sys-
protection relays. This allows the iden-
tem. In each scenario, all stages of the It was demonstrated that the adapta-
tification of incorrect settings, weak-
entire fault clearance sequence were tion of protection settings can help in-
nesses and limitations of protection
simulated in detail. This provides deep crease system security and maximize
system.
insight into the protection system re- utilization of the existing system,
sponse for a given fault condition. All The high degree of automation ena- which in turn avoids CAPEX invest-
currents, voltages and impedances bles the efficient assessment of a very ment.
measured by protection devices are large number of fault scenarios and
available. complex system conditions, and mini-
mizes the individual treatment of spe-
Generation system stability was as-
cial cases.
sessed for the existing and newly pro-
posed and improved under-frequency Protection System Improvement:
load shedding schemes, taking into False or improvable protection settings
account different system configura- were corrected using a rule-based al- Published by
tions. In total, hundreds of thousands gorithm. The underlying protection Siemens AG 2017
of fault scenarios were simulated. The grading rules were improved by iterat-
results were automatically assessed ing simulation, assessment and setting
Energy Management Division
and visualized in a concise way with improvement until optimum results Freyeslebenstrasse 1
SIGUARD PSA. were reached. In this way, system-wide 91058 Erlangen, Germany
coordination and optimization of the
protection settings was achieved. In
For more information, please contact:
addition, the quality of the new protec- power-technologies.energy@siemens.com
tion settings is ensured before approv-
al. AL=N, ECCN=EAR99
Subject to changes and errors. The infor-
Key achievements mation given in this document only con-
The benefits of the systematic protec- tains general descriptions and/or perfor-
tion system review and improvement mance features which may not always
project were: specifically reflect those described, or
which may undergo modification in the
· complete data survey, documenta- course of further development of the
Figure 2: SIGUARD PSA protection performance
visualization (color code: red - fault not
tion and modeling of the power and products. The requested performance fea-
cleared, orange/yellow – over-/underfunction) protection system with validated tures are binding only when they are ex-
high quality
pressly agreed upon in the concluded con-
tract.