Zero Harm Observation Report Register

Construction of Extending Sheikh Zayed Bin Sultan Street Umm Lafina Island to Connect Al Reem Island Contract 2

TYPE of OBSERVATION
S/N Date Time Location Observed By ORIGINATOR Observation Corrective Action Required Target Date Closed By Verified by Remarks
UC/UA/Policy/System.
1 9/19/2019 7:12 H.Club Zulfiqar Malik Tebodin U/C Poor Housekeeping at Heritage Club Housekeeping to be done 21.09.2019 Closed Asif
2 9/21/2019 16.10 Bridge 1 Baiser Islam Tebodin U/C Barrication required for deep excavtion Barrication to be done (informed to Site Engineer) Immediate Closed Asif
3 9/21/2019 10.40 S.Causeway Pier 31 Zulfiqar Malik Tebodin U/A Pipe cuting worker without PPE PPE to be used all the time while working Immediate Closed Talha
4 9/21/2019 9.00 S.Causeway Pier 36 Ayman Omar Tebodin U/C No Slope or bench during excavation Slope to be done to avoid collaspe of Excavation Immediate Closed Talha
5 9/22/2019 11.40 Bridge 2 Adnan Habib Tebodin U/C One Engine not working in speed boat Maintenance of boat have to be done Immediate Closed Talha
6 9/22/2019 10.00 H.Club Muhammed Kutty Tebodin U/C Poor Housekeeping at Heritage Club Housekeeping to be done 23.09.2019 Closed Asif
7 9/22/2019 - Precast Yard John Jaco Tebodin U/A Arch finishing worker without PPE PPE to be used all the time while working (Mask) Immediate Closed Kathirvel
8 9/22/2019 16.20 Ramp 1B and 2B Baiser Islam Tebodin U/C Poor Housekeeping Housekeeping to be done 23.09.2019 Closed Asif
9 9/22/2019 15.35 Arch Span 10 and 11 Zulfiqar Malik Tebodin U/C Improper storage of material- Tripping Hazard Housekeeping to be done 23.09.2019 Closed Talha
10 9/22/2019 10.00 North Causeway Arch Ayman Omar Tebodin U/A Using staight ladder to access arch top Arch typr ladder to used for access Immediate Closed Talha
11 9/23/2019 10.40 North Causeway Zulfiqar Malik Tebodin U/C and U/A Pipe cuting without protection WAH Proper platform to be provided Immediate Closed Talha
12 9/23/2019 11.00 Bridge 2 Ayman Omar Tebodin U/C Improper accesss from platform to Barge Boat to be used for people transportation Immediate Closed Talha
13 9/23/2019 9.00 Precast Yard Muhammod Yousuf Tebodin U/A RMC truck driver without PPE near lab Mandatory PPE to be used while at site Immediate Closed Jahanzeb
14 9/23/2019 9.00 North Causeway Arch Jubin Peter Tebodin U/C No access to go inside arch for checking Proper access to be provided Immediate Closed Talha
15 9/23/2019 10.30 North Causeway Jubin Peter Tebodin U/C No sufficient barrier near sea channel Sea channel area to be provide with barriers 30.09.2019 Closed Talha
16 9/24/2019 - Precast Yard Jacob Tebodin U/A Rigger without PPE. Mandatory PPE to be used while at site Immediate Closed Jahanzeb
17 9/24/2019 - Precast Yard Jacob Tebodin U/A Worker standing under the suspended load Work stopped and advised the workers Immediate Closed Jahanzeb
18 9/24/2019 9.00 North Causeway Ayman Omar Tebodin U/A Improper access (Surface to pile cap) Proper access to be provided Immediate Closed Talha
19 9/24/2019 10.00 Pier 6 and 7 Muhammed Kutty Tebodin U/C No Proper access to reach the top of Arch Proper access to be provided (Site Engr. Gulam was infr 26.09.2019 Closed Talha
20 9/24/2019 10.00 Pier 6 and 7 Adnan Habib Tebodin U/C No Proper access to go inside MSE wall Proper access to be provided Immediate Closed Talha
21 9/24/2019 10.15 South Causeway Baiser Islam Tebodin U/C No Flag man for vehicle reversing. Banksman to be provided Immediate Closed Talha
22 9/25/2019 11.00 Precast Yard Muhammod Yousuf Tebodin U/A No hand gloves for concrete testing worker Gloves to be used while casting concrete cube Immediate Closed Talha
23 9/25/2019 15.30 Pier 31 Muhammed Kutty Tebodin U/C No barrication for piling activity Piling area to be barricaded Immediate Closed Talha
24 9/26/2019 10.30 Bridge no.3 Adnan Habib Tebodin U/C and U/A Hazard light of tanker not working Advised the driver to ON the hazard light always Immediate Closed Talha
25 9/26/2019 10.40 North Cause Peir 11 Zulfiqar Malik Tebodin Positive Operative working with fullbody harness Good pratice to be maintained - - -
26 9/26/2019 11.00 - Muhammed Kutty Tebodin U/C and U/A RMC truck hazard light not working Advised the driver to ON the hazard light always Immediate Closed Talha
27 9/26/2019 15.30 Precast Yard Adnan Habib Tebodin U/A Steel fixer without hand glovse Gloves to be used while binding the rebars Immediate Closed Jahanzeb
28 9/28/2019 9.03 Ambartment 1 Irfan Ahmad Tebodin U/A Worker standing over the blocks without harnessSafety harness to be worn (infromed Foreman Immediate Closed Talha
29 9/28/2019 9.05 Ambartment 1 Irfan Ahmad Tebodin U/C Poor Housekeeping Poor housekeeping to be done Immediate Closed Talha
30 9/28/2019 10.00 Pier no.4 Muhammod Yousuf Tebodin U/C No proper access to enter the backfilling area Proper access to be provided (Infromed Site Engr.) Immediate Closed Talha
31 9/28/2019 10.00 Pier 38 Jubin Peter Tebodin U/C No barrication for pile cap pier 38 Barrication to be done (informed to Site Engineer) Immediate Closed Talha
32 9/28/2019 10.00 North Causeway Span 8 Irfan Ahmad Tebodin U/A Workers sitting over the MSE wall Advised the workes about the risk on siting over the wallImmediate Closed Talha
33 9/28/2019 10.39 Pilecap 31 Irfan Ahmad Tebodin Positive Step ladder provided for easy access - - - -
34 9/28/2019 10.40 Pilecap 31 Irfan Ahmad Tebodin U/C No Slope or bench during excavation Proper sloping to be maintained to aviod collaspe Immediate Closed Talha
35 9/28/2019 11.03 Arches Irfan Ahmad Tebodin Positive Working using ladders and Harness - - - -
36 9/28/2019 11.05 Arch Span 11 Irfan Ahmad Tebodin U/C Poor Housekeeping (Steel rod laying near the staiHousekeeping to be done Immediate Closed Talha
37 9/29/2019 9.00 South Causeway Zeyad Jdeed Tebodin U/C Electrical not buried (Exposed cable) Electrical Cable to be laid under ground 30.09.2019 Closed
38 9/29/2019 9.00 South Causeway Zeyad Jdeed Tebodin U/C Portable welding machine without earthing Earthing to be provided Immediate Closed
39 9/29/2019 9.30 Precast Yard Zeyad Jdeed Tebodin U/C Drinking water thermos found Empty Thermos to be filled with water (checking) Immediate Closed Jahanzeb
40 9/29/2019 9.30 Precast Yard Zeyad Jdeed Tebodin U/C Poor cable management Cable to routed properly Immediate Closed
41 9/29/2019 10.00 Precast Yard (MSE wall) Zeyad Jdeed Tebodin U/C No Sun shade area provided Rest area to be defined Immediate Closed
42 9/29/2019 10.00 Precast Yard (MSE wall) Zeyad Jdeed Tebodin U/C No barrication for the lifting activity Lifting area to be barricated Immediate Closed
43 9/29/2019 11.00 Pier 7 Jubin Peter Tebodin U/C No Proper access to reach the top of Arch Proper access to be provided Immediate Closed
44 9/29/2019 15.00 North Causeway Pier 6 Muhammod Yousuf Tebodin U/C No Demarcation for the equipment work near theInformed site Engineer to arrange barricade. Immediate Closed Ahmad
45 9/30/2019 9.00 Pile Cap 5 Jacob Tebodin U/C Poor Housekeeping at peir 5 back filling Housekeeping to be done Immediate Closed
46 9/30/2019 9.00 North Causeway Jacob Tebodin U/C Access interuped by the scaffolding Obstruction to be removed for easy access Immediate Closed
47 9/30/2019 9.20 Pier 35 Qaiser Islam Tebodin U/C No Barrication around the crane Lifting area to be barricated Immediate Closed
48 9/30/2019 9.30 Pile Cap 36 Qaiser Islam Tebodin U/C No Barrication around the deep excavtion Barriers to be provided for the excavated area. Immediate Closed
49 9/30/2019 - Precast Yard Jacob Tebodin U/A Safety harness not hook up by workers (Arch) Harness to be hook up while working at height. Immediate Closed
50 9/30/2019 10.3 H.Club Muhammod Yousuf Tebodin U/A No Barrication for Ramp 1A and 1B Barrication to be done around the excavation. Immediate Closed
51 10/2/2019 9.30 North Causeway Abt-1 Tariq Tebodin U/C Vehicle Registration and Certificate not mactchinRevelant document to be kept in the vehicle. Immediate Closed
52 10/2/2019 9.45 North Causeway Tariq Tebodin U/C Material stored at edge of arch Material to be stored away from the egde and height to Immediate Closed
53 10/2/2019 10.00 North Causeway Tariq Tebodin U/A Worker working near water with life jacket Informed to Engineer, workers to wear life jacket Immediate Closed
54 10/2/2019 10.15 North Causeway Tariq Tebodin U/A Equipment without daily checklist Checklist to be provided and filled daily Immediate Closed Talha
55 10/2/2019 10.40 North Causeway Abt-2 Tariq Tebodin U/C and U/A Bus parked in front of rest area. All vehicle to be parked in desiginated parking Immediate Closed Talha
56 10/2/2019 10.45 North Causeway Tariq Tebodin U/A Foreman over the arch without fall protection Safety harness to be worn (infromed Foreman Immediate Closed Talha
57 10/2/2019 11.00 Precast Tariq Tebodin Material Wokers complaining about gloves quality Quality of the gloves to be verified Immediate Closed Kathirvel Survey carried out
58 10/2/2019 11.30 Precast Tariq Tebodin Material Steel fixer without hand gloves PPE to be used while working (Quality to be checked) Immediate Closed Kathirvel
59 10/3/2019 9.15 South Causeway Pier 36 Qaiser Islam Tebodin U/C Poor House keeping / Barricade Housekeeping to be done/ Barriers to be provided Immediate Closed
60 10/3/2019 9.20 South Causeway Pier 35 Qaiser Islam Tebodin U/C and U/A Wokers standing under the suspended cage Enigeer to ensure that no one will be under the suspendeImmediate Closed Talha
61 10/3/2019 9.45 North Cause Span 7 Zulfiqar Malik Tebodin U/C No Bariacde around the Generator Informed foreman to provide baricade and it was Done. Immediate Closed Talha
62 10/3/2019 10.15 Pier 31 Zulfiqar Malik Tebodin U/A Working resting near the exacavation without PPAdvised Engr. To have meeting with work crew Immediate Closed Talha
63 10/3/2019 10.30 Pier 32 Zulfiqar Malik Tebodin U/A Workers without PPE Mandatory PPE to be used while at site Immediate Closed Talha
64 10/3/2019 10.45 Pier 39 Zulfiqar Malik Tebodin U/C Waste bag floating on the sea House keeping to be done Immediate Closed Talha
65 10/3/2019 Night North Causeway Walid Mekni Tebodin U/A Workers without PPE in Arch lifting area Mandatory PPE to be used while at site Immediate Closed
66 10/5/2019 - Span 6 Jacob Tebodin U/C Scaffolding without inspection Tag. Scaffolding to be inspected and tag to be provided Immediate Closed Ahmad
67 10/5/2019 - Span 14 Jacob Tebodin U/C Scaffolding without inspection Tag. Scaffolding to be inspected and tag to be provided Immediate Closed Ahmad
68 10/5/2019 - North Causeway Jacob Tebodin U/C No Pedestrian access provided Vehicle and machine movement to be provided Immediate
69 10/5/2019 15.00 Causeway Muhammod Yousuf Tebodin U/A Workers without PPE in lifting area Mandatory PPE to be used while at site Immediate Closed
70 10/6/2019 Precast Yard Jacob Tebodin U/A Mask was not used by arch reparing work PPE to be used while at site - - -
71 10/7/2019 9.30 Dhafeer st Irfan Ahmad Tebodin Positive PVC barriers filled with water - Closed
72 10/7/2019 10.10 Dhafeer st Irfan Ahmad Tebodin U/C Sign boards not secured Sand bags to be provided to secure the sign boards Immediate Closed
73 10/7/2019 10.10 H.Club Irfan Ahmad Tebodin U/C Gaps between handrail and barrier at barge Exposed gap to be closed (informed HSE) 09.10.19 Closed
74 10/7/2019 10.10 H.Club Irfan Ahmad Tebodin U/C Sand bags not provided at the edge of the excavaSand bagd to be provided to avoid errosion of soil. 09.10.19
75 10/7/2019 10.30 H.Club Irfan Ahmad Tebodin U/C Dust emmission while vehicle passing . Water sprinkling to be done for dust supperssion Immediate Closed
76 10/7/2019 10.30 H.Club Irfan Ahmad Tebodin U/C Poor barication around pile cap 2A Excavated area to be barricated Immediate Closed
77 10/7/2019 10.30 H.Club Irfan Ahmad Tebodin U/C Electrical cable passing through access Informed foreman to removed the cable (done) Immediate Closed Asif
78 10/7/2019 11.30 Precast Yard Jacob Tebodin U/C Poor barication around Jetty Barrication to be provided Immediate Closed
79 10/8/2019 16.00 h.Club Pier 2A Muhammod Yousuf Tebodin U/C Poor Housekeeping Housekeeping to be done Immediate Closed
80 10/9/2019 10.00 Southcauseway Peir 32 Qaiser Islam Tebodin U/C No banks for vehicle movement Banksman to be provided Immediate Closed
81 10/9/2019 10.05 Southcauseway Peir 40 Qaiser Islam Tebodin U/C No Barrication around the excavation Barrication to be provided Immediate Closed
82 10/9/2019 11.20 Precast Concrete Check PointJacob Tebodin U/C Concrete sampling worker without PPE. Mandatory PPE to be used while at site Immediate Closed
83 10/9/2019 Night Pile cap 21 Ayman Omar Tebodin U/A No access to reach top of pile cap. Proper access to be provided Immediate Closed
84 10/9/2019 21.00 H.Club Ramp 1B and 2B Ayman Omar Tebodin U/C Access obstruction due to backfilling matrial Proper access to be provided for pile cap Immediate Closed
85 10/10/2019 10.30 H.Club Zulfiqar Malik Tebodin Positive Wokers with mandatory PPE Postive safety culture to be maintained - -
86 10/10/2019 11.30 H.Club Zulfiqar Malik Tebodin U/C and U/A Workers were crossing the road. Advised to the foreman aviod crossing the raod Immediate Closed
87 10/12/2019 10.40 Precast Yard Adnan Habib Tebodin U/C Hazard light of RMC truck not working Advised the driver to ON the hazard light always Immediate Closed
88 10/12/2019 11.00 Bridge 2 Ayman Omar Tebodin U/C Some of the bracing left from the platform Bracing to be removed for easy access of baot Immediate Closed
89 10/12/2019 14.00 South Causeway Ayman Omar Tebodin U/C and U/A One woker sitting over the cage Advised forman to arrange platfrom Immediate Closed
90 10/12/2019 Afternoon Barge Walid Mekni Tebodin U/C Exposed edge of barge entance Barrier to be provided at the entrance of the barge Immediate Closed
91 10/12/2019 15.30 Arch erection Adnan Habib Tebodin U/A Working near water without life jacket Advised VSL Engineer to provide life jacket Immediate Closed
92 10/13/2019 9.30 Pier 32 Jubin Peter Tebodin U/C No slit curtain provided for backing area Advised Engr. To provide slit curtain Immediate Closed Ahmad
93 10/13/2019 9.30 Dhafeer st Rao Tebodin U/A Workers using metal shovel near live utility PVC shovel to be used while excavating near U/G utility Immediate
94 10/13/2019 10.00 Bridge 2 Ayman Omar Tebodin U/C Pedestrian access ramp hand rail damaged Damaged handrail support to be welded Immediate Closed Jahanzeb
95 10/14/2019 9.15 Bridge 2 Qaiser Islam Tebodin U/A Workers without mandatory PPE Mandatory PPE to be used while at site (infromed HimanImmediate Closed
96 10/14/2019 9.40 Pier 35 Qaiser Islam Tebodin U/C Poor Housekeeping Housekeeping to be done in regular basis Immediate Closed
97 10/14/2019 9.45 South Cause Qaiser Islam Tebodin U/C Dust emmission on access raod. Water sprinkling to be done for dust supperssion Immediate Closed
98 10/14/2019 10.00 Precast Walid Mekni Tebodin U/C Improper access on the mould Proper access to be provided Immediate Closed
99 10/14/2019 10.30 Pier 01 Jubin Peter Tebodin U/C Safety sign board fall down. Sign board to be fixed back and sand back to be providedImmediate Closed
100 10/14/2019 11.00 Bridge 2 Muhammod Yousuf Tebodin U/A Workers without mandatory PPE Mandatory PPE to be used while at site (infromed forem Immediate Closed
101 10/14/2019 14.30 North Causeway Pier 6 Jacob Tebodin U/C Scaff tag not filled appropriately Ladder to be inspected Immediate Closed Ahmad
102 10/16/2019 10.00 North Causeway Span 8 Zulfiqar Malik Tebodin U/C Poor cable management (Tripping Hazard) Cable management to be done. Immediate Closed
103 10/16/2019 10.05 North Causeway Span 2 Zulfiqar Malik Tebodin U/C Generator at site without protection Barriers to be provided around the generator. Immediate Closed
104 10/17/2019 11.00 South Causeway Pier 32 Jacob Tebodin U/C Unsafe lifting of pile casing. Informed Engr, to use proper lifting gear Immediate Closed
105 10/17/2019 2:30 Precast Yard Adnan Habib Tebodin U/C No proper PPE at concrete check point Advised the worker and also informed manager Immediate Closed
106 10/20/2019 10:35 North Causeway pier 6 Zulfiqar Malik Tebodin U/C Standing at height and Edge of MSE panels Informed worker to stay away and inform foreman MushImmediate Closed
107 10/20/2019 10:45 North Causeway pier 10 Zulfiqar Malik Tebodin U/C Ladder without safety Tag. Informed Foreman Fiaz to talk to HSE Immediate Closed
108 10/20/2019 10:55 North Causeway pier 11 Zulfiqar Malik Tebodin U/C Use of broken Ladder Informed Foreman Fiaz to replace Immediate Closed
109 10/21/2019 9:20 South Causeway pier 32 Qaiser Islam Tebodin U/C contractor done the proper barrication around thPositive Observation
110 10/21/2019 10:10 South Causeway pier 35 Qaiser Islam Tebodin U/C Housekeeping Asked Engineer to remove all materials Immediate Closed
111 10/21/2019 10:20 North Cuaseway Zulfiqar Malik Tebodin U/C Ladder without safety Tag. Pier 9,10 and 11 Informed Foreman Fiaz to talk to HSE Immediate Closed
112 10/21/2019 10:30 North Cuaseway Zulfiqar Malik Tebodin U/C No protection from at height Asked Foreman Mushtaq to put barrication Immediate
113 10/22/2019 8:30 Precast Adnan Habib Tebodin U/C No waste concrete cleaned since last one week Informed construction material Engineer to clean the areImmediate
114 10/22/2019 9:30 North Cuaseway Zulfiqar Malik Tebodin U/C Height more than 3m without protection from falAsked Engineer Hussain and Foreman to barricade on topImmediate
115 10/22/2019 10:05 South Causeway pier 40 Qaiser Islam Tebodin U/C Deep excavation required barrication Informed Engineer to barricade around the excavation Immediate Closed
116 10/22/2019 11:00 Heritage club Adnan Habib Tebodin U/C No concrete checking point Informed to material Engineer Immediate
117 10/23/2019 1:45 North Causeway pier 12 Adnan Habib Tebodin U/C No proper proper access Instructed Engineer Usman to make proper safe access Immediate Closed
118 10/24/2019 10:10 North Causeway pier 9,10 & Zulfiqar Malik Tebodin U/C safety Tags fixed with ladder. Positive Observation Closed
119
120
121
122
123
124