Assignment 1

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY

DEPARTMENT OF CHEMICAL ENGINEERING

TCE 5107 – ADVANCED MINERALS ENGINEERING IA


ASSIGNMENT 1
31/10/2019

Question:

The following metals are extracted from their ores using pyrometallurgical techniques.
With reference to one of the largest mines in the world, give a detailed description of the
pyrometallurgical extraction process. Your description should include diagrams, reactions, nature
and quality of raw materials, nature and composition of the products and slag, conditions of
operation, construction material for the furnaces e.t.c. The report should include:

(i) Concentrate pre-treatment [15 marks]


(ii) Smelting process [60 marks]
(iii) Refining process [15 marks]
(iv) General report presentation [10 marks]
Total [100 marks]

Group Metal Group Metal


1 Ferrochrome 4 Nickel

2 Zinc 5 Platinum group metals

3 Lead/Zinc 6 Lead

Report deadline – MONDAY 11 NOVEMBER 2019 AT 1200HRS.


Reports to be submitted online
(Marks will be deducted for late submission i.e. 5% per hour)

Maximum of 15 pages including references.

You might also like