GEC GlobalEngineeringCenter
GEC GlobalEngineeringCenter
Drucknorm/Print norm
Our experience is your reassurance About us
2 3
Unique combination of expertise & resources Global Engineering Centres
4 5
Our 4-Phase Strategy for maximum efficiency and reliability Services
1
stocked on site and transfer cycle times
is decisive here. The key to this is our materials planning, target-performance
4-Phase Strategy. Situation comparison, identification of causes of
delays and the recommendation of suitable
Phase 1 analysis remedies, participation in site meetings
Situation analysis (as specified), and providing a formwork
Definition and analysis of all of the coordinator to ease the pressure on
customer‘s relevant data, specifications project management.
3
and requirements. For example: bill of Phase
materials, deadline planning, working hours
per day, working days per week, periods
Phase Phase 4
Project management
of use of slab and wall formwork, quality of Assistance with the final accounting,
concrete finish, protective scaffolds etc. return of equipment, and post-project
costing inclusive of the holding of final
Execution
2
Phase 2 meetings.
Technical planning and costing
To calculate costs, all the details relating to planning
the systems and their implementation are
defined. This gives the choice of systems,
sequence plan, progress chart, quantities
of materials kept on site, number of
crews and employees, rough deadline
plan, application and assignment
drawings, costing of the offered services
Phase
in accordance with the bill of materials
and the price quotation inclusive of Technical
4
technical item descriptions.
planning and Phase
Phase 3
Execution planning
costing
Following the award of contract by the
customer, equipment usage is planned
with exact timing. This phase of planning
includes the detailed technical planning, Project
formwork erection plans with material
piece lists, the preparation of elevation
management
and erection plans, static analysis,
materials planning and provision. This
phase is rounded off with the delivery
of all planned equipment, site-adapted
6 7
Our global competence: Case study:
Water Grand Renaissance Dam, Ethiopia
Water is one of the greatest challenges Challenge: Design and supply of formwork
facing mankind today and is attracting solutions for dams, spillways, power plants,
significant investment from global culverts and draft tubes
economies. We have decades of
experience harnessing water power, Key figures—the structure
from energy generation to complete ● Output: 6,000 MW
infrastructure services for marine and ● Area of new reservoir: 1,700 km2
utility applications. ● Dam type: roller-compacted concrete
● Dam length: 2 km
Hydropower & water ● Volume of poured concrete: 12 million m3
applications include ● Workers: 15,000
● Dams & culverts
● Seawalls Key figures—our solution
● Tidal defence barriers ● 25,000 m2 vertical formwork H20
● Water retention ● 1,800 dam climbing platforms
● River deviation ● 7,000 m2 horizontal formwork
● Power houses ● 3,000 m2 RASTO wall formwork
● Piezometric wells ● 3,000 m2 custom timber formwork
● Water & sewage infrastructure
● Harbour decks & shipyards
● Off-shore moorings & dolphins
8 9
Our global competence: Case study:
Transport Hardanger Bridge, Norway
10 11
Our global competence: Case study:
Power and Energy Energy from Waste plant, Oxford, UK
Global investment in the power and energy Challenge: Design and erect a unique
sector is due to be in the trillions by 2035. access and formwork solution to construct
A focus towards alternative sources of the entire industrial plant.
power, renewable sources and emerging
locations leads to a number of new Key figures—the project
challenges for contractors. We have ● State-of-the-art Energy from Waste
developed extensive experience in plant
power and energy projects through our ● Process 300,000 tonnes of
capabilities for construction and industrial non-recyclable waste per year
maintenance services with new-build ● Generate up to 24 MW of electricity—
projects in emerging markets, upgrades enough to power 38,000 homes
or decommissions in existing areas.
12 13
Our global competence: Case study:
Urban Tour D 2, France
14 15
Our global competence: Case study:
Social Beta Sciences University Faculty, Utrecht, The Netherlands
16 17
Specialist Expertise: Specialist Expertise:
Monolithic formwork Climbing formwork
Montalban Housing Project, Our experience Russky Bridge, Russia Our experience
Venezuela We supplied one set of equipment which included enough Challenge: Development and Our solution provided a fully enclosed temporary working environment
Challenge: Development of a formwork to pour the walls and slabs together—covering half supply of weather-independent which protected against extreme weather conditions during construction
formwork solution for 4 towers— of the building floor plan, including the central stairway as self-climbing formwork solution. of the pylon and its 70 m tall approach piers. The SCF unit provides
10-storey walk up buildings with well as complex and unique exterior facade and architectural seven work levels with a total height of 19 m, with the top two used for
60 apartments each. features around the window. The formwork would then be Key figures—the structure upstream steelfixing. As both the external—and unusually also the
cycled horizontally to the second half of the floor plan. ● Span: 1,104 m internal—working platforms are all full-scale, steelfixing can proceed
Key figures—the project immediately after concrete pouring, thus saving time and increasing
● Height: 320,9 m (pylon),
“The Great Venezuelan Housing Mission“ safety. On the next two levels, work is carried out on the formwork and
50—100 m (piers)
● Scope: 100,000 houses in
● Lanes: 4 the concrete surface can be heated from here if necessary. To accelerate
10 months, a total of 1,000,000 work flow, the formwork level also has separate projecting materials
houses in 5 years platforms served by a crane.
Key figures—our solution
Key figures—our solution ● 64 SCF brackets The three trailing platforms round off the rigid, steel-frame climbing
● Pour cycle: one every three days ● 65 climbing lifts for pylon pier production unit. These platforms allow the concrete to be protected
(crew of 15-20 workers) ● 12—20 climbing lifts for piers from the weather for two complete cycles after pouring, and again,
● Total m2 area for the EasySet: heated if necessary.
app. 1,164,30 m2
18 19
Specialist Expertise: Specialist Expertise:
Modelling and 3D Design Specials
Our engineers apply their ingenuity and Based on your project requirements, rather
specialist expertise, along with the latest than our catalogue, we develop a bespoke
software technologies to design solutions plan based on the most appropriate
that both solve/pre-empt problems and formwork solution for every concrete
save money for you. pour. Our solutions can be based on any
Critical to our success are our dedicated combination of formwork and shoring, from
research and development teams, which walls, slabs or bridge formwork to shoring,
are constantly striving to develop more climbing and edge protection—all from one
innovative and efficient solutions to supplier.
everyday problems found by our Our in-house engineers and designers
customers. We can help you with our have in-depth knowledge of the specific
specialized 3D parametric modelling regulations, requirements, codes and
designs which illustrate our solution with qualifications required. In addition, they
maximum visual impact. 3D designs offer have years of experience working on some
precision in the early stages of complex of the world’s largest and most complex
construction and add significant value in and multiphased projects, where the
designing the best solution—taking all design of low-impact solutions are critical
aspects of the project into consideration. to success.
In addition to this, we can provide a The flexibility of our product range
prototyping model to visualize the exact increases our versatility, and we are
working process. This has proved crucial adept at finding intelligent solutions
on projects where unique structures need for the most complex projects.
to be planned to exact standards such as
draft tubes in dam construction.
We can design the most complex projects
on your behalf quickly and thoroughly.
Starting with the ground plan and facade
dimensions, we produce the required
structural drawings, determine the precise
quantities of materials and supply all the
required quantity lists.