Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

GMP SUB MANUAL

STANDARD OPERATING
TITLE: TUBE LIGHT FIXTURES
PROCEDURE
SOP No.: ISSUE NO. REVISION NO. : PAGE NO.
GMP/MK-1/EU/044/2006 01 01 1 of 4
EFFECTIVE DATE: DATE: APR. 2006 DATE JAN. 2007 COPY No.:

REVIEW DATE: PREPARED BY CHECKED BY APPROVED BY

EXE - ENGG. SR. EX - ENGG. GM - OP VP- QO&RA


DATE: DATE: DATE: DATE:

1.0 OBJECTIVE:
To describe the procedure for Cleaning Tube Light Fixtures.

2.0 SCOPE:
This procedure is applicable to Cleaning Tube Light Fixtures at Marksans Pharma
Ltd, D-10, Kurkumbh.

3.0 RESPONSIBILITIES:
3.1 Electrical Engineer and Electrician are responsible for Cleaning Tube Light
Fixtures
3.2 Sr. Executive - Engineering is responsible for Implementation, Review of the
activity and training on SOP.

4.0 PROCEDURE:
4.1 TUBE LIGHT FIXTURE
4.1.1 Switch OFF the Isolating switch.
4.1.2 Remove the tube light cover and clean with duster.
4.1.3 Remove the tube light rods and clean with duster.
4.1.4 Clean the reflector with duster.
4.1.5 Refix tube light rod and cover.
4.1.6 Switch ON the Isolating switch and check the tubes for glowing, if
required rectify.
4.1.7 Tube light fixture cleaning is recorded in Tube Light fixture cleaning
Record as per Annexure- I.

4.2 FLAME PROOF TUBE LIGHT FIXTURE:


4.2.1 Switch OFF the isolating switch.
4.2.2 Remove the cover bolts.
4.2.3 Remove the tube holder, guards and glass.
4.2.4 Remove the tube light rods and clean with duster.
4.2.5 Clean the tube holder guards and glass with duster.
4.2.6 Refix the tube light rod, glass, guard, tube holder and cover bolts.
4.2.7 Switch ON the isolating switch and check the tubes for glowing, if
required rectify.
GMP SUB MANUAL
STANDARD OPERATING
TITLE: TUBE LIGHT FIXTURES
PROCEDURE
SOP No.: ISSUE NO. REVISION NO. : PAGE NO.
GMP/MK-1/EU/044/2006 01 01 2 of 4
EFFECTIVE DATE: DATE: APR. 2006 DATE JAN. 2007 COPY No.:

REVIEW DATE: PREPARED BY CHECKED BY APPROVED BY

EXE - ENGG. SR. EX - ENGG. GM - OP VP- QO&RA


DATE: DATE: DATE: DATE:

4.2.8 Tube light fixture cleaning is recorded in Tube Light fixture cleaning
Record as per Annexure- I.
4.3 FREQUENCY: Monthly

5.0 ATTACHMENT / ANNEXURES:


Sr. No. Format Title Annexure No.
01 Tube Light fixture cleaning Record Annexure - I
6.0 REFERENCES:
NIL

7.0 ABBREVIATIONS:
SOP : Standard Operating Procedure
MK-1 : Marksans Pharma ltd, D-10, Kurkumbh
GMP : Good Manufacturing Practices
EXE - ENGG. : Executive Engineering
SR.EXE - ENGG : Senior Executive Engineering
GM - OP : General Manager - Operations
VP - QO & RA : Vice President- Quality Operations &Regulatory Affairs
EU : Engineering & Utilities
GMP SUB MANUAL
STANDARD OPERATING
TITLE: TUBE LIGHT FIXTURES
PROCEDURE
SOP No.: ISSUE NO. REVISION NO. : PAGE NO.
GMP/MK-1/EU/044/2006 01 01 3 of 4
EFFECTIVE DATE: DATE: APR. 2006 DATE JAN. 2007 COPY No.:

REVIEW DATE: PREPARED BY CHECKED BY APPROVED BY

EXE - ENGG. SR. EX - ENGG. GM - OP VP- QO&RA


DATE: DATE: DATE: DATE:

8.0 REVISION / REVIEW CARD:


Sr. Details of Revision / Issue No. / Rev. No./ Approved
Date
No. Review Date Date By/ Date
01 00 Mr. DSD
01 Jan.2006 New document
Jan. 2006 Jan. 2006 Jan 2006
Dr.Arun

Numbering system of Jadhav


01 01
02 Jan.2007 SOPs is changed and
Jan. 2006 Jan. 2007
Scheduled review
Ref. SOP No.
GMP/MK-1/EU/044/2006 Page No: 1 of 1
ANNEXURE - I
TUBE LIGHT FIXTURE CLEANING RECORD
ROOM NO. : _________________________ LOCATION : _____________
NO. OF TUBE LIGHTS FIXTURE: _________
NO. OF TUBE
SR. DATE OF NEXT DUE CHECKED REMARKS
LIGHT
NO. CLEANING DATE BY (IF ANY)
FIXTURES

___________________ ___________________
Engineer Head – Engineering
Date:_______________ Date:_______________

You might also like