Professional Documents
Culture Documents
SOP For Cleaning of Tube Lights (New Format)
SOP For Cleaning of Tube Lights (New Format)
STANDARD OPERATING
TITLE: TUBE LIGHT FIXTURES
PROCEDURE
SOP No.: ISSUE NO. REVISION NO. : PAGE NO.
GMP/MK-1/EU/044/2006 01 01 1 of 4
EFFECTIVE DATE: DATE: APR. 2006 DATE JAN. 2007 COPY No.:
1.0 OBJECTIVE:
To describe the procedure for Cleaning Tube Light Fixtures.
2.0 SCOPE:
This procedure is applicable to Cleaning Tube Light Fixtures at Marksans Pharma
Ltd, D-10, Kurkumbh.
3.0 RESPONSIBILITIES:
3.1 Electrical Engineer and Electrician are responsible for Cleaning Tube Light
Fixtures
3.2 Sr. Executive - Engineering is responsible for Implementation, Review of the
activity and training on SOP.
4.0 PROCEDURE:
4.1 TUBE LIGHT FIXTURE
4.1.1 Switch OFF the Isolating switch.
4.1.2 Remove the tube light cover and clean with duster.
4.1.3 Remove the tube light rods and clean with duster.
4.1.4 Clean the reflector with duster.
4.1.5 Refix tube light rod and cover.
4.1.6 Switch ON the Isolating switch and check the tubes for glowing, if
required rectify.
4.1.7 Tube light fixture cleaning is recorded in Tube Light fixture cleaning
Record as per Annexure- I.
4.2.8 Tube light fixture cleaning is recorded in Tube Light fixture cleaning
Record as per Annexure- I.
4.3 FREQUENCY: Monthly
7.0 ABBREVIATIONS:
SOP : Standard Operating Procedure
MK-1 : Marksans Pharma ltd, D-10, Kurkumbh
GMP : Good Manufacturing Practices
EXE - ENGG. : Executive Engineering
SR.EXE - ENGG : Senior Executive Engineering
GM - OP : General Manager - Operations
VP - QO & RA : Vice President- Quality Operations &Regulatory Affairs
EU : Engineering & Utilities
GMP SUB MANUAL
STANDARD OPERATING
TITLE: TUBE LIGHT FIXTURES
PROCEDURE
SOP No.: ISSUE NO. REVISION NO. : PAGE NO.
GMP/MK-1/EU/044/2006 01 01 3 of 4
EFFECTIVE DATE: DATE: APR. 2006 DATE JAN. 2007 COPY No.:
___________________ ___________________
Engineer Head – Engineering
Date:_______________ Date:_______________