Include in here the organisation’s name* and location* and number of workers. You must then go on to give a description of the main
activities/products/services carried out. You must also describe the area to be risk assessed eg, whole site, and anything else that you
consider relevant (approximately 150 to 200 words):
My organisation is ZENITH ERECTORS LTD. located in cochin which consist of 84 employees.
ZENITH ERECTORS LTD. is a reputed firm in the field of boiler erection, piping related engineering industrial projects, maintenance shutdown project related to
oil field engineering. company focuses their projects in south India.
Presently an ongoing project of 16Ton boiler plant is constructing in pondichery India. The total area of the site is around 20 acres and almost 45 workers are
involved in this project including technicians, supervisors, engineers and other staffs.
Project includes activities such as erection of package type boiler which probably includes lifting and installation of equipments, piping erection which includes
cutting, grinding, welding operations. also underground pipelines where installing for water supply which is done by excavation for trenches.There is a material
yard provided nearby of the site where different equpiments, materials, pipes of different grades and sizes, Mild steel columns, angles are arranged for work. The
working time is from 8.00 am to 5.00 pm on weekdays and provide holidays at weekends. Sometimes have overtime work after scheduled working time for some
important activities. The project manager is responsible for Health and Safety and Safety incharge personal give direction for achieving good health and safety
culture.
The risk assessment will cover the area of boiler unit area, maintenance department and material yard.
You must now give a brief outline on how you completed the risk assessment (approximately 200 words):
I started internet surfing for information about ILO had any codes of practice related to occupational safety and health at work in the mechanical as well as oil and
gas field. The British HSE website (http://www.hse.gov.uk/search/constuction)had adequate sources of information for example, site safety, working at height and
guidance for health and safety in the construction industry. Refered books published such as International Health and Safety at work(Third edition from Phil
Hughes MBE and Ed Ferrett) and prepare notes from these information and consulted with the project manager to know the different process.
With the knowledge that I occured from the information and my studies, I visited the site where the work is going on. I walk through the working area and gathered
information of the activies carryout there by visual inspection. From the permission granted by the site engineer I got a chance to interact with some workers at
rest brake. From my enquiries I found how much they where aware about risk perception and hazards in there work place, precautions to prevent accident, ill
health conditions. procedures to comply with emergency situation etc. Also checked accident records and sickness absence records to understand the causes of
accidents and accident rates, ill health conditions.
Hazard category Who might be harmed What are you already doing? What further controls/actions are Timescalesfor Responsible
and hazard and how? required? further actions person’s job
to be completed title
(within …)
Work at height Erection gang, supervisors, 1.Scaffolding is provided. 1.Instruction,information, training should 1 week Project
other employees, or anyone be given regularly. manager(2, 8,
Risk of fall from who where at the place of 2.PPE's such as safety belt with 13)
height while erection ongoing erection area. fall arrester, safety helmet, safety 2.A safe system of work to be develop 1 week
of steel columns, shoes etc are given to the for the most risky erection work. Safety
beams, Chances of fall from height workers. incharge(10, 9,
Horizontal and if they worked in unsafe 3.possible safety nets should be 2 weeks 12)
vertical bracings, method or improper use of 3.Permit to work system to introduced below the workplace to
istallation of safety harness. inadequate carryout work. prevent falling of objects. Project co-
equipment. control measures will ordinator(1, 3,
increase the risk level and 3.Temprory handrails are 4. horizontal life line should be 1 week 6, 11)
dangerous occurance. implemented. introduced for anchoring.
Project
4.works carryout under 5.Check the handrails, ladders, gratings 2 days engineer/super
supervison and instructions from are fixed properly and firmly. visor(4, 5, 7)
foreman.
6.provide assistants and regular
communication system for lone working
people who might worked at 1 day
height.(example: some grinding ,cutting
welding work activites will done by
individuals at height)
4.Regular reports are given to 4. spill kits must provided and absorbent Purchase
purchase department and the pads should be used for cleaning of oil 1 week department(4)
daily usage of diesel and oil are spills.
set and limited.
5. Supervision and monitoring of 1 day
5.Vehicle details are entered in activities.
separate log book.
6.Diesel barrels should be kept
6.Personal protective equipment separately from other tools and 1 week
such as hard gip safety shoes, equipment.
gloves and hand washing
facilities are provided. 7.5S methodology should be
implemented, which has done by,
7.Hand diesel pump is using to (a)sort
transfer fluid. (b)set in order
(c)shine
(d)standardize 1 week
(e)sustain
It gives idea about organizing a
workplace, identifying of storing items,
maintaining the area, sustaining the new
items and the employees understand
how should they can done the work in a
proper way.
Electricity Electrician, supervisor, 1.Danger signage sticker 1. Place a fire extinguisher near the 1 week Electical
other staff or employees provided panel board. engineer/super
Panel board and who operate panel board visor(1, 2, 3)11
cabling of different and maintenance 2.Seprate MCB are provided for 2. Provide training, instruction,
equipment, earthing, equipment such as water different circuit in the panel information to the employees dealing 1 week
equipment which run pump, dosing pump, blower board. with electricity.
Hazardous Maintenance staffs , 1. Eye washing facilities 1.Good housekeeping must ensured. 1 week Maintenance
substances technicians who handling provided. work
with these fluid substances 2.Reduce the time of exposure and incharge(1, 2,
Use of oil, paints daily are affected. 2.Safety goggles, safety shoes adequate rest brakes should be 3 days 3, 4)
and diesel in gloves and face mask, are provided.
maintenance Skin irritation may occur provided. Safety
workshop. with continous exposure of 3.Ensure safe disposal of the hazardous 4 days incharge(5)
diesel, Also irritating to 3.Dilution ventilation provided. substance.
eyes, causes dermatitis.
also badly affect respiratory 4.half mask respirator is provided 4.contaminated cloths and equipment
system (asthma, lung while spray painting. should be kept seperately and clean in 3 days
disease) and carcinogenic. regular basis.
5.sign boards are provided at
work area. 5.Health surveillance should be
conducted. 2 week
Health ,welfare and All employers working for 1.All employees are allowed for 1. job rotation for some activities which 2 days Project
work environment. prolonged time in day time. rest brake at periodic intervals. prolonged for long time such as workers supervisor(1)
who engaged with erection.
Workers daily According to Centre for 2.adequate toilet and washing
exposure of daylight. Disease Control and facilities are provided. 2.sunscreen with an SPF(sun protection
Prevention(CDC) increase factor) of minimum 30 will be provided 2 days Safety
in temperature may result in 3.chlorinted drinking water is to employees who engaged with work at incharge(2, 3)
excessive loss of water and stored in the water tank at work height for long time.
place.
Hazardous Employees who deals with 1.Normal face mask and other 1.N95 air purifying respirator should be 3 days Safety
substances insulation material and who relevant PPE's provided.(safety provided. incharge(1)
engaged with the cladding goggles, hand gloves etc..)
Dust process(rockwool insulation 2. Full time supervision must ensure 1 day Project
Cutting and installing sheet fixing to the pipe and 2.workplace area properly supervisor(2,
of glass fibre and tied up with wire string) and barricaded. 3.give information to workers regarding 3)
mineral wool for visitors, other staff who dust effects to our body and advice them 1 day
piping insulation came there will be affected. 3.Welfare facitilies are provided. about the importance of hygiene.
produce hazardous drinking water.
substance Inhalation of high level dust
may cause inflammation to 4. work carried out under
nasal and result in cough, supervision.
sneezing, itchy nose, throat
infection. allergic dust may
result difficulty in breathing,
chest tightness, asthma etc.
Dust also may irritant to
eyes and skin allergies.
Equipment handling Store keeper, employees, 1.Arrange material as per work 2 week Store
1. Material stacking record is well
staff who came in the store. order(example: welding related keeper(1)
maintained.
Working equipments kept separatly, grinding
equipments, welding Falling of object from the equipments such as grinding wheel,
2.provide proper labelling of
equipment, gas shelf may injured the grinding machine kept seperately.)
different objects in shelf.
cylinders used for person, inhalation of
welding, chemicals, hazardous chemicals will
You must pick the three highest priority/most urgent actions and justify your choice. Your justification must include moral, legal and financial arguments
(500 to 700 words); consideration of likelihood and probable severity of injury, ill-health and/or harm (150 to 250 words); description of how effective each
action is likely to be in controlling the risk (250 to 350 words)
1.Build a tower scaffolding tower near 2 tier structural of erection area which includes proper platform, toe board and proper handrail. Make sure access
and exit are appropriate while in emergency.(Hazard category 'work at height')
2.Purchase N-95 air purifying respiratory mask for those who dealing with rock wool insulation material.(Hazard category ' Toxic dust')
3.Provide separate provision for the storage of gas cylinders used for welding
Zenith Erectors Ltd has a policy, obligation and moral duty to ensure safety of their employees by all means. We know 'The first wealth is health.' It's our
moral and ethical reason to reduce accident, ill health and disease rate. Each and everyone in our organisation helps to achieving our goal and
they are our essential employees to fulfil it. Mental, stress, fatigue condition of an employee in a work condition with less facility will adversely
affect the work as well to the health of our workers. Injuries/ill health will create negative impact to staff morale and workers may lose the job in
some cases where the injuries may lead to a permenent disability and it will intern affect their family income too. To reduce this our organisation
must provide adiquate facility and provision to do work with in a standard health and safety management system.
Financial/economic issues faced by Zenith erectors Ltd includes work related illhealth/disease, direct and indirect cost followed by accidents(fall from height
with improper work method and avoidance of safety measures are at high alarming rate usually in construction erection work now a days.)Increased rate of
minor and major injuries causes high financial cost to the organisation which may happened by work pattern, work environment and work load. Avoidance
of certain basic safety arrangements will lead to severe consequences like fire blast occured from cumbustable material causing life threatening major
accident will be a huge financial problem to the firm. So proper equipment and provison should be allocated for safe working.
Enforcement action such as prohibition notice, warning letter would be recieved from the authority for not completing the safety requirement
അഅഅഅഅഅഅഅഅഅഅഅ with in certain time period.(sometimes not complying with safety regulation for
You must now give a review date for your risk assessment and say why you have chosen this date (10 to 50 words).
You must now indicate how the risk assessment findings will be communicated (including who needs to know the information) (100 to 150 words).
You must now indicate how you will follow-up on the risk assessment to check that the actions have been carried out (100 to 150 words).