KEMENTERIAN PEKERJAAN UMUM

DIREKTORAT JENDERAL BINA MARGA 92.8575 772.67 832.10 3.60 232.73


BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII

PERCOBAAN MARSHALL
SNI 06 - 2489 - 1991

Rendaman 1 X30 menit

No a b c d e f g h i j k l m n 0 p
1 6 1094.4 1095.6 609.5 486.1 2.251 2.341 15.443 3.83 75.205 90 756.2 862.09 3.20 269.40 5.303
2 6 1093.9 1095.7 607.1 488.6 2.239 2.341 15.914 4.36 72.572 92 773.0208 842.59 3.30 255.33111 5.303
3 6 1092.2 1094.3 608.4 485.9 2.248 2.341 15.578 3.98 74.433 90 756.2 824.28 3.80 216.91459 5.303
4 6 1094.9 1095.7 608.3 487.4 2.246 2.341 15.630 4.04 74.141 89 747.8136 815.116824 3.90 209.00 5.303
5 6 1090.0 1095.7 608.2 487.5 2.236 2.341 16.025 4.49 71.976 91 764.6184 833.43 3.80 219.32 5.303
6 6 1091.2 1094.7 608.2 486.5 2.243 2.341 15.760 4.19 73.419 89 747.8136 815.12 3.60 226.42 5.303
Rendaman 1 X24 jam
7 6 1109.0 1111.1 619.0 492.1 2.254 2.341 15.360 3.73 75.688 84 705.8016 769.32 4.30 178.91 5.303
8 6 1095.8 1096.2 609.2 487.0 2.250 2.341 15.491 3.88 74.928 82 688.9968 751.006512 4.20 178.81 5.303
9 6 1095.5 1097.2 611.1 486.1 2.254 2.341 15.358 3.73 75.697 88 739.4112 805.958208 5.60 143.92 5.303
10 6 1101.0 1103.2 608.5 494.7 2.226 2.341 16.412 4.93 69.955 83 697.4 725.295168 4.20 172.69 5.303
11 6 1098.0 1101.1 610.7 490.4 2.239 2.341 15.909 4.36 72.602 87 731.0 796.799592 3.50 227.66 5.303
12 6 1096.1 1098.2 608.2 490.0 2.237 2.341 15.986 4.45 72.186 86 722.6 787.640976 4.50 175.03 5.303
+
2.244 2.341 16.160 4.17 73.567 87.5833 735.9 706.4738 3.99 206.12 5.303
Gmm : 2.355 Bj.agg. BULK : 2.503 Bj. Agg. Eff : 2.549 Abps. Aspal : 0.741 Bj. Aspal : 1.028 P. ring : 8.40 Ka. Gmm : 5.56

Keterangan :
a. K.Aspal thdp camp f = Brt isi (b/e) h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk) m = Stabilitas (kg), l*koreksi benda uji
b. Brt. Di udara (gr) g = Brt isi max teoritis i = % rongga thdp campuran 100 - (100*(f/g) n = Kelelehan (mm)
c. Brt. SSD (gr) 100 j = % rongga terisi aspal (100*(h - i))/i o = Hasil bagi Marshall (kg/mm), m/n
d. dlm air (gr) % agregat % aspal k = Pembacaan arloji stabilitas p = Kadar aspal effektif (%)
e. vol (cc) Bj. Eff.Agregat Bj. Aspal l = Stabilitas(k*konversi) = a - ((Absp, aspal/100)*(100 - c))
100 - Pb *** Absorpsi aspal terhadap total agregat =
**Bj. Eff. Agregat =
(100/Gmm) - (Pb/BJ.aspal) (BJ. Eff. Agr - BJ. Bulk agr)
100 x x BJ. Asp
(BJ. Eff. Agr x BJ. Bulk agr)

457860009.xlsx
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII

PERCOBAAN MARSHALL
BS 598 Part 104 (1989)

No a b c d e f g h i j k l m n 0 p
1 5.0 1089.0 1091.0 612.0 479 2.27 2.37 14 4.2 69 78 655 629 3.20 197 4.3
2 5.0 1087.0 1089.5 615.0 474.5 2.29 2.37 13 3.5 73 89 748 718 3.50 205 4.3
2.28 2.37 13 3.8 71 674 3.35 201 4.3
1 5.5 1088.0 1090.4 613.0 477.4 2.28 2.36 14 3.3 76 264 2218 2529 4.98 508 4.8
2 5.5 1079.6 1081.6 612.0 469.6 2.30 2.36 13 2.5 81 262 2201 2113 4.40 480 4.8
2.29 2.36 14 2.9 79 2321 4.69 494 4.8
1 5.7 1087.0 1090.7 607.6 483.1 2.25 2.35 15 4.3 72 272 2285 2491 3.90 639 5.0
2 5.7 1089.5 1092.5 610.5 482.0 2.26 2.35 15 3.8 74 270 2269 2473 4.30 575 5.0
2.26 2.35 15 4.1 73 2277 2482 4.90 607 5.0
1 6.5 1087.0 1089.0 615.0 474.0 2.29 2.33 14 1.4 90 282 2369 2275 5.23 435 5.8
2 6.5 1089.5 1091.1 617.0 474.1 2.30 2.33 14 1.2 92 284 2386 2291 5.67 404 5.8
2.30 2.33 14 1.3 91 2378 2283 5.45 419 5.8

+
Gmm : 2.355 Bj.agg. BULK : 2.503 Bj. Agg. Eff : 2.549 Abps. Aspal : 0.74 Bj. Aspal : 1.028 P. ring : 8.40 Ka. Gmm : 5.56

Keterangan :
a. K.Aspal thdp camp f = Brt isi (b/e) h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk) m = Stabilitas (kg), l*koreksi benda uji
b. Brt. Di udara (gr) g = Brt isi max teoritis i = % rongga thdp campuran 100 - (100*(f/g) n = Kelelehan (mm)
c. Brt. SSD (gr) 100 j = % rongga terisi aspal (100*(h - i))/i o = Hasil bagi Marshall (kg/mm), m/n
d. dlm air (gr) % agregat % aspal k = Pembacaan arloji stabilitas p = Kadar aspal effektif (%)
e. vol (cc) Bj. Eff.Agregat Bj. Aspal l = Stabilitas(k*konversi) = a - ((Absp, aspal/100)*(100 - c))
100 - Pb *** Absorpsi aspal terhadap total agregat =
**Bj. Eff. Agregat =
(100/Gmm) - (Pb/BJ.aspal) (BJ. Eff. Agr - BJ. Bulk agr)
100 x x BJ. Asp
(BJ. Eff. Agr x BJ. Bulk agr)

457860009.xlsx
2.355

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII

PERCOBAAN MARSHALL
SNI 06 - 2489 - 1991

No a b c d e f g h i j k l m n 0 p

1 7.0 1096.0 1097.4 604.5 492.9 2.22 2.31 17 3.7 79 282 2369 2701 6.40 422 6.3
2 7.0 1097.0 1098.4 606.3 492.1 2.23 2.31 17 3.5 80 285 2395 2610 6.70 390 6.3
2.23 2.31 17 3.6 79 2382 2656 6.55 406 6.3

+
Gmm : 2.355 Bj.agg. BULK : 2.503 Bj. Agg. Eff : 2.549 Abps. Aspal : 0.741 Bj. Aspal : 1.028 P. ring : 8.4024 Ka. Gmm : 5.56

Keterangan
a. K.Aspal thdp camp f = Brt isi (b/e) h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk) m = Stabilitas (kg), l*koreksi benda uji
b. Brt. Di udara (gr) g = Brt isi max teoritis i = % rongga thdp campuran 100 - (100*(f/g) n = Kelelehan (mm)
c. Brt. SSD (gr) 100 j = % rongga terisi aspal (100*(h - i))/i o = Hasil bagi Marshall (kg/mm), m/n
d. dlm air (gr) % agregat % aspal k = Pembacaan arloji stabilitas p = Kadar aspal effektif (%)
e. vol (cc) Bj. Eff.Agregat Bj. Aspal l = Stabilitas(k*konversi) = a - ((Absp, aspal/100)*(100 - c))
100 - Pb *** Absorpsi aspal terhadap total agregat =
**Bj. Eff. Agregat =
(100/Gmm) - (Pb/BJ.aspal) (BJ. Eff. Agr - BJ. Bulk agr)
100 x x BJ. Asp

457860009.xlsx
100 x x BJ. Asp
(BJ. Eff. Agr x BJ. Bulk agr)

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII
PERCOBAAN MARSHALL PRD
SNI 06 - 2489 - 1991

No a b c d e f g h i j k l m n 0 p

1 5.5 1096.0 1098.4 614.7 483.7 2.266 2.357 14.447 3.87 73.224 94 1237.98 1547.475 3.40 455.14 4.80
2 5.5 1097.0 1099.4 615.6 483.8 2.267 2.357 14.386 3.80 73.583 102 1343.34 1598.5746 4.00 399.64 4.80
2.267 2.357 14.416 3.834 73.404 1573.025 3.70 427.39 4.80

1 6.0 1096.0 1098.4 612.7 485.7 2.257 2.341 15.250 3.61 76.333 94 1343.34 1464.2406 3.40 430.66 5.30
2 6.0 1097.0 1099.4 611.6 487.8 2.249 2.341 15.538 3.94 74.664 102 1343.34 1397.0736 4.00 349.27 5.30
2.253 2.341 15.394 3.773 75.499 1430.657 3.70 389.96 5.30

1 486.7
+2.252 2.325 15.874 3.15 80.133 1237.98 1151.3214 338.62 5.81
6.5 1096.0 1098.4 611.7 94 3.40
2 6.5 1097.0 1099.4 612.6 486.8 2.253 2.325 15.814 3.09 80.491 102 1343.34 1464.2406 4.00 366.06 5.81
2.253 2.325 15.844 3.119 80.312 1307.781 3.70 352.34 5.81
+

Gmm : 2.355 Bj.agg. BULK : 2.503 Bj. Agg. Eff : 2.549 Abps. Aspal : 0.741 Bj. Aspal : 1.028 P. ring : 13.17 Ka. Gmm : 5.56

Keterangan
a. K.Aspal thdp camp f = Brt isi (b/e) h = % rongga thdp agregat (100 - (h*(100 - a)/bj.bulk) m = Stabilitas (kg), l*koreksi benda uji
b. Brt. Di udara (gr) g = Brt isi max teoritis i = % rongga thdp campuran 100 - (100*(f/g) n = Kelelehan (mm)
c. Brt. SSD (gr) 100 j = % rongga terisi aspal (100*(h - i))/i o = Hasil bagi Marshall (kg/mm), m/n
d. dlm air (gr) % agregat % aspal k = Pembacaan arloji stabilitas p = Kadar aspal effektif (%)
e. vol (cc) **Bj. Eff. Agregat = Bj. Aspal l = Stabilitas(k*konversi) = a - ((Absp, aspal/100)*(100 - c))
100 - Pb *** Absorpsi aspal terhadap total agregat =
**Bj. Eff. Agregat =

457860009.xlsx
**Bj. Eff. Agregat =
(100/Gmm) - (Pb/BJ.aspal) (BJ. Eff. Agr - BJ. Bulk agr)
100 x x BJ. Asp
(BJ. Eff. Agr x BJ. Bulk agr)

457860009.xlsx
Tebal
benda
Isi benda uji uji Angka
(cm3) (mm) koreksi
421 – 431 52,4 1.39

432 – 443 54,0 1.32

444 – 456 55,6 1.25


457 – 470 57,2 1.19

471 – 482 58,7 1.14


483 – 495 60,3 1.09
496 – 508 61,9 1.04
509 – 522 63,5 1
523 – 535 65,1 0.96
536 – 546 66,7 0.93
547 – 559 68,3 0,89

560 – 573 69,9 0,86


574 – 585 71,4 0,83
586 – 598 73,0 0,81
599 – 610 74,6 0,78
611 - 625 76,2 0,76

457860009.xlsx
Tebal
benda
Isi benda uji uji Angka
(cm3) (mm) koreksi
421 – 431 52,4 1.39
432 – 443 54,0 1.32
444 – 456 55,6 1.25
457 – 470 57,2 1.19

471 – 482 58,7 1.14


483 – 495 60,3 1.09
496 – 508 61,9 1.04
509 – 522 63,5 1
523 – 535 65,1 0.96
536 – 546 66,7 0.93
547 – 559 68,3 0,89

560 – 573 69,9 0,86


574 – 585 71,4 0,83
586 – 598 73,0 0,81
599 – 610 74,6 0,78
611 - 625 76,2 0,76

457860009.xlsx
Tebal
benda
Isi benda uji uji Angka
(cm3) (mm) koreksi

432 – 443 54,0 1.32

444 – 456 55,6 1.25


457 – 470 57,2 1.19

471 – 482 58,7 1.14


483 – 495 60,3 1.09
496 – 508 61,9 1.04
509 – 522 63,5 1
523 – 535 65,1 0.96
536 – 546 66,7 0.93
547 – 559 68,3 0,89

560 – 573 69,9 0,86


574 – 585 71,4 0,83
586 – 598 73,0 0,81
599 – 610 74,6 0,78
611 - 625 76,2 0,76

457860009.xlsx
Tebal
benda
Isi benda uji uji Angka
(cm3) (mm) koreksi
421 – 431 52,4 1.39

432 – 443 54,0 1.32


444 – 456 55,6 1.25
457 – 470 57,2 1.19

471 – 482 58,7 1.14


483 – 495 60,3 1.09
496 – 508 61,9 1.04
509 – 522 63,5 1
523 – 535 65,1 0.96
536 – 546 66,7 0.93
547 – 559 68,3 0,89

560 – 573 69,9 0,86


574 – 585 71,4 0,83
586 – 598 73,0 0,81
599 – 610 74,6 0,78
611 - 625 76,2 0,76

457860009.xlsx
457860009.xlsx
KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )
KEGIATAN :
PAKET :
KONSULTAN : Tanggal
KONTRAKTOR :
ANALISA SARINGAN
SNI 03 - 1968 - 1990
Material : HOT BIN I (1) Material HOT BIN I (2)
Ukuran saringan Komulatif Ukuran saringan Komulatif
Rata - rata
Inch mm Brt tertahan % Tertahan % Lolos Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.00 100.00 100.00 1½ 37.5 0.00 0.00

1 25.4 0.00 0.00 100.00 100.00 1 25.4 0.00 0.00

3/4 19.0 0.00 0.00 100.00 100.00 3/4 19.0 0.00 0.00

1/2 12.7 0.00 0.00 100.00 100.00 1/2 12.7 0.00 0.00

3/8 9.8 0.00 0.00 100.00 100.00 3/8 9.8 0.00 0.00

No.4 4.75 5.40 0.24 99.76 99.74 No.4 4.75 6.40 0.28

No. 8 2.35 419.10 18.71 81.29 80.86 No. 8 2.35 439.70 19.58

No.16 1.18 821.20 36.65 63.35 63.04 No.16 1.18 837.00 37.27

No. 30 0.6 1183.50 52.82 47.18 46.98 No. 30 0.6 1195.00 53.21

No. 50 0.30 1722.70 76.89 23.11 22.12 No. 50 0.30 1771.20 78.86

N0.100 0.15 1879.00 83.87 16.13 16.04 N0.100 0.15 1888.00 84.06

No. 200 0.075 1945.00 86.81 13.19 13.07 No. 200 0.075 1955.00 87.05
Berat contoh : 2240.50 gram Berat contoh : 2245.90 gram

Material HOT BIN II (1) Material HOT BIN II (1I)


Ukuran saringan Komulatif Ukuran saringan Komulatif
Rata - rata
Inch mm Brt tertahan % Tertahan % Lolos Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.00 100.000 100.00 1½ 37.5 0.00 0.00
1 25.4 0.00 0.00 100.000 100.00 1 25.4 0.00 0.00
3/4 19.0 0.00 0.00 100.000 100.00 3/4 19.0 0.00 0.00
1/2 12.7 0.00 0.00 100.000 100.00 1/2 12.7 0.00 0.00
3/8 9.8 9.60 0.43 99.569 99.53 3/8 9.8 11.60 0.50
No.4 4.75 437.20 19.62 80.384 80.27 No.4 4.75 460.60 19.84
No. 8 2.35 1252.40 56.19 43.808 44.48 No. 8 2.35 1273.20 54.85
No.16 1.18 1682.00 75.47 24.533 25.69 No.16 1.18 1698.00 73.15
No. 30 0.60 1786.10 80.14 19.863 20.28 No. 30 0.60 1841.10 79.31
No. 50 0.30 2001.10 89.78 10.216 10.21 No. 50 0.30 2084.40 89.79
N0.100 0.15 2052.00 92.07 7.933 7.79 N0.100 0.15 2144.00 92.36
No. 200 0.075 2154.00 96.64 3.356 4.57 No. 200 0.075 2187.00 94.21
Berat contoh : 2228.80 gram Berat contoh : 2321.40 gram

KONTRAKTOR KONSULTAN PROYEK

CORE TEAM 2013


KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )
KEGIATAN :
PAKET :
KONSULTAN : Tanggal :
KONTRAKTOR
ANALISA SARINGAN
SNI 03 - 1968 - 1990
Material : HOT BIN III (1) Material HOT BIN III (2)
Ukuran saringan Komulatif Ukuran saringan Komulatif
Rata - rata
Inch mm Brt tertahan % Tertahan % Lolos Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.00 100.00 100.00 1½ 37.5 0.00 0.00

1 25.4 0.00 0.00 100.00 100.00 1 25.4 0.00 0.00

3/4 19.0 0.00 0.00 100.00 100.00 3/4 19.0 0.00 0.00

1/2 12.7 832.00 27.037 72.963 70.24 1/2 12.7 932.00 32.49

3/8 9.8 2754.90 89.52 10.477 10.93 3/8 9.8 2542.10 88.62

No.4 4.75 2998.30 97.43 2.567 2.69 No.4 4.75 2787.80 97.19

No. 8 2.35 3011.80 97.87 2.128 2.27 No. 8 2.35 2799.10 97.58

No.16 1.18 3017.40 98.05 1.947 2.09 No.16 1.18 2804.50 97.77

No. 30 0.60 3022.40 98.22 1.784 1.92 No. 30 0.6 2809.30 97.94

No. 50 0.30 3033.80 98.59 1.414 1.53 No. 50 0.30 2821.00 98.35

N0.100 0.15 3055.70 99.30 0.702 0.79 N0.100 0.15 2843.40 99.13

No. 200 0.075 3068.30 99.71 0.292 0.31 No. 200 0.075 2859.20 99.68
Berat contoh : 3077.30 gram Berat contoh : 2868.40 gram

Material HOT BIN IV (1) Material HOT BIN IV (2)


Ukuran saringan Komulatif Ukuran saringan Komulatif
Rata - rata
Inch mm Brt tertahan % Tertahan % Lolos Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.000 100.000 100.00 1½ 37.5 0.00 0.000

1 25.4 1145.30 16.599 83.401 83.35 1 25.4 1166.07 16.696

3/4 19.0 1210.20 17.539 82.461 82.42 3/4 19.0 1230.50 17.618

1/2 12.7 1913.50 27.732 72.268 72.27 1/2 12.7 1937.10 27.735

3/8 9.8 2163.60 31.357 68.643 68.72 3/8 9.8 2178.90 31.197

No.4 4.75 467.40 6.774 93.226 93.24 No.4 4.75 471.65 6.753

No. 8 2.35 0.00 100.000 0.000 0.00 No. 8 2.35 0.00 100.000

No.16 1.18 0.00 100.000 0.000 0.00 No.16 1.18 0.00 100.000

No. 30 0.60 0.00 100.000 0.000 0.00 No. 30 0.60 0.00 100.000

No. 50 0.30 0.00 100.000 0.000 0.00 No. 50 0.30 0.00 100.000

N0.100 0.15 0.00 100.000 0.000 0.00 N0.100 0.15 0.00 100.000

No. 200 0.075 0.00 100.000 0.000 0.00 No. 200 0.075 0.00 100.000

CORE TEAM 2013


Berat contoh : 6900.00 gram Berat contoh : 6984.22 gram

KONTRAKTOR KONSULTAN PROYEK

KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )
KEGIATAN :
PAKET : PEMELIHARAAN BERKALA JALAN GAKO - BATAS KOTA ENDE
KONSULTAN : PT. DELTA TAMA WAJA CORPORATION Tanggal :
KONTRAKTOR PT. AGOGO GOJDEN GROUP
ANALISA SARINGAN
SNI 03 - 1968 - 1990
Material : Semen (1) Material : Semen (2)
Ukuran saringan Komulatif Rata - rata Ukuran saringan Komulatif
Inch mm Brt tertahan % Tertahan % Lolos Lolos (%) Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.00 100.00 100.00 1½ 37.5 0.00 0.00

1 25.4 0.00 0.00 100.00 100.00 1 25.4 0.00 0.00

3/4 19.0 0.00 0.00 100.00 100.00 3/4 19.0 0.00 0.00

1/2 12.7 0.00 0.00 100.00 100.00 1/2 12.7 0.00 0.00

3/8 9.8 0.00 0.00 100.00 100.00 3/8 9.8 0.00 0.00

No.4 4.75 0.00 0.00 100.00 100.00 No.4 4.75 0.00 0.00

No. 8 2.35 0.00 0.00 100.00 100.00 No. 8 2.35 0.00 0.00

No. 16 1.18 0.00 0.00 100.00 100.00 No. 16 1.18 0.00 0.00

No. 30 0.60 0.00 0.00 100.00 100.00 No. 30 0.60 0.00 0.00

No. 50 0.30 0.00 0.00 100.00 100.00 No. 50 0.30 0.00 0.00

N0.100 0.15 0.00 0.00 100.00 100.00 N0.100 0.15 0.00 0.00

No. 200 0.075 0.00 0.00 100.00 100.00 No. 200 0.075 0.00 0.00
Berat contoh : 500 gram Berat contoh : 500 gram

Material : Material :
Ukuran saringan Komulatif Rata - rata Ukuran saringan Komulatif
Inch mm Brt tertahan % Tertahan % Lolos Lolos (%) Inch mm Brt tertahan % Tertahan
1½ 37.5 0.00 0.000 100.000 100.00 1½ 37.5 0.00 0.00

1 25.4 0.00 0.000 100.000 100.00 1 25.4 0.00 0.00

3/4 19.0 0.00 0.000 100.000 100.00 3/4 19.0 0.00 0.00

1/2 12.7 67.00 4.602 95.398 95.40 1/2 12.7 67.00 4.60

3/8 9.8 123.00 8.448 91.552 91.56 3/8 9.8 123.00 8.44

No. 8 2.35 1011.00 69.437 30.563 30.61 No. 8 2.35 1011.00 69.34

CORE TEAM 2013


No. 30 0.60 1123.00 77.129 22.871 22.92 No. 30 0.60 1123.00 77.02

No. 50 0.30 1211.00 83.173 16.827 16.88 No. 50 0.30 1211.00 83.06

N0.100 0.15 N0.100 0.15

No. 200 0.075 1249.00 85.783 14.217 14.28 No. 200 0.075 1249.00 85.67
Berat contoh : 1456 gram Berat contoh : 1458 gram

KONTRAKTOR KONSULTAN PROYEK

CORE TEAM 2013


AN

Komulatif

% Lolos
100.00
100.00
100.00
100.00
100.00
99.72
80.42
62.73
46.79
21.14
15.94
12.95

Komulatif

% Lolos
100.00
100.00
100.00
100.00
99.50
80.16
45.15
26.85
20.69
10.21
7.64
5.79

PROYEK

CORE TEAM 2013


AN

Komulatif

% Lolos
100.00
100.00
100.00
67.508
11.376
2.810
2.416
2.228
2.060
1.652
0.872
0.321

Komulatif

% Lolos
100.000
83.30 1145.30 0 471.65 471.65
82.38 1145.3 2355.50 1145.3 1166.07 1637.72
72.26 1913.5 3827.00 3058.8 1230.5 2868.22
68.80 2163.6 4327.20 5222.4 1937.1 4805.32
93.25 1210.2 1677.60 6432.6 2178.9 6984.22
0.00 467.4 13332.60
0.00
0.00
0.00
0.00
0.00

CORE TEAM 2013


PROYEK

AN

Komulatif

% Lolos
100.00
100.00 4.309392
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Komulatif

% Lolos
100.00
100.00
100.00
95.40
91.56
30.66

CORE TEAM 2013


22.98
16.94

14.33

PROYEK

CORE TEAM 2013


KEMENTERIAN PEKERJAAN UMUM DAN PERUM
DIREKTORAT JENDERAL BINA MARGA 54.06 48.36
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )

GRADASI GABUNGAN
Ukuran saringan HOT BIN IV HOT BIN III HOT BIN II HOT BIN I FILLER
HASIL SPESIFIKASI
Inch mm 100% 19% 100% 34% 100% 29% 100% 12% 100% 6% 100%
11/2" 38.100 100.00 18.86 100.00 33.95 100.00 29.23 100.00 12.26 100.00 5.70 100.00 100 100

1" 25.400 83.35 15.72 100.00 33.95 100.00 29.23 100.00 12.26 100.00 5.70 96.86 90 - 100 90

3/4 19.000 82.42 15.54 100.00 33.95 100.00 29.23 100.00 12.26 100.00 5.70 83.45 76 - 90 76

1/2 12.700 72.27 13.63 70.24 23.85 100.00 29.23 100.00 12.26 100.00 5.70 75.36 60 - 78 60
3/8 9.800 68.72 12.96 10.93 3.71 99.53 29.09 100.00 12.26 100.00 5.70 63.72 52 - 71 52

No.4 4.750 93.24 17.58 2.69 0.91 80.27 23.46 99.74 12.23 100.00 5.70 45.76 35 - 54 35

No. 8 2.350 0.00 0.00 2.27 0.77 44.48 13.00 80.86 9.91 100.00 5.70 29.39 23 - 41 23

No.16 1.180 0.00 0.00 2.09 0.71 25.69 7.51 63.04 7.73 100.00 5.70 21.65 13 - 30 13

No. 30 0.600 0.00 0.00 1.92 0.65 20.28 5.93 46.98 5.76 100.00 5.70 18.04 10 - 22 10

No. 50 0.300 0.00 0.00 1.53 0.52 10.21 2.99 22.12 2.71 100.00 5.70 11.92 6 - 15 6

N0.100 0.150 0.00 0.00 0.79 0.27 7.79 2.28 16.04 1.97 100.00 5.70 7.65 4 - 10 4

No. 200 0.075 0.00 0.00 0.31 0.10 4.57 1.34 13.07 1.60 100.00 5.70 5.70 3-7 3

GRAFIK GABUNGAN ASPHALT CONCRETE BASE COURSE (AC BASE )


100 0.00

90
100.00

80

70

60
% Lolos

50

40

30

20

10

0
1

Ukuran saringan (mm)

CORE TEAM 2013


10

1
Ukuran saringan (mm)

CORE TEAM 2013


5.70

100 38.1
100 25.4
90 19.0
78 12.7
71 9.8
54 4.75
41 2.35
30 1.18
22 0.6
15 0.30
10 0.15
7 0.075 5.70

0.15
0.15
1.18
1.18
2.35
2.35
4.75
4.75

CORE TEAM 2013


KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII
KEGIATAN :
PAKET :
KONSULTAN : Tanggal
KONTRAKTOR :
AGREGAT KASAR : HOT BIN I SUMBER MATERIAL
BERAT JENIS DAN PENYERAPAN AGG. KASAR
SNI 03 - 1970 - - 1990
NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT CONTOH KERING PERMUKAAN B Gram

BERAT CONTOH DALAM AIR C Gram

A
BERAT JENIS BULK Gr/cc
B - C

B
BERAT JENIS SSD Gr/cc
B - C
A
BERAT JENIS APPARENT Gr/cc
A - C

B - A
PENYERAPAN AIR X 100% %
A

AGREGAT KASAR : HOT BIN II SUMBER MATERIAL


NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT CONTOH KERING PERMUKAAN B Gram

BERAT CONTOH DALAM AIR C Gram

A
BERAT JENIS BULK Gr/cc
B - C

B
BERAT JENIS SSD Gr/cc
B - C
A
BERAT JENIS APPARENT Gr/cc
A - C

B - A
PENYERAPAN AIR X 100% %
A

457860009.xlsx
KONTRAKTOR KONSULTAN

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII
KEGIATAN :
PAKET :
KONSULTAN : Tanggal
KONTRAKTOR :
AGREGAT KASAR : HOT BIN III SUMBER MATERIAL
BERAT JENIS DAN PENYERAPAN AGG. KASAR
SNI 03 - 1970 - - 1990
NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT CONTOH KERING PERMUKAAN B Gram

BERAT CONTOH DALAM AIR C Gram

A
BERAT JENIS BULK Gr/cc
B - C

B
BERAT JENIS SSD Gr/cc
B - C
A
BERAT JENIS APPARENT Gr/cc
A - C

B - A
PENYERAPAN AIR X 100% %
A

457860009.xlsx
AGREGAT KASAR : HOT BIN IV SUMBER MATERIAL
NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT CONTOH KERING PERMUKAAN B Gram

BERAT CONTOH DALAM AIR C Gram

A
BERAT JENIS BULK Gr/cc
B - C

B
BERAT JENIS SSD Gr/cc
B - C
A
BERAT JENIS APPARENT Gr/cc
A - C

B - A
PENYERAPAN AIR X 100% %
A

KONTRAKTOR KONSULTAN

KEMENTERIAN PEKERJAAN UMUM


DIREKTORAT JENDERAL BINA MARGA

457860009.xlsx
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII
KEGIATAN :
PAKET :
PENGUJIAN : BERAT JENIS DAN PENYERAPAN AGG. HALUS (SNI 03 - 1969 - 1990)
KONSULTAN : Tanggal
KONTRAKTOR :

AGREGAT HALUS : HOT BIN IV SUMBER MATERIAL


NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT BOTOL + AIR B Gram

BERAT BOTOL + AIR + CONTOH C Gram

A
BERAT JENIS BULK Gr/cc
B + 500 - C

500
BERAT JENIS SSD Gr/cc
B + 500 - C
A
BERAT JENIS APPARENT Gr/cc
B+A-C

500 - A
PENYERAPAN AIR X 100% %
A

AGREGAT HALUS : BIN II SUMBER MATERIAL


NOMOR CONTOH

BERAT CONTOH KERING A Gram

BERAT BOTOL + AIR B Gram

BERAT BOTOL + AIR + CONTOH C Gram

A
BERAT JENIS BULK Gr/cc
B + 500 - C

500
BERAT JENIS SSD Gr/cc
B + 500 - C
A
BERAT JENIS APPARENT Gr/cc
B+A-C

500 - A
PENYERAPAN AIR X 100% %
A

457860009.xlsx
KONTRAKTOR KONSULTAN

457860009.xlsx
Tanggal :

SUMBER MATERIAL :
ASAR

1 2 Rata - rata
3845.00 3356.00
3904.00 3405.00
2380.00 2082.00

2.523 2.537 2.523


2.523
2.562 2.574 2.562
2.562
2.625 2.634 2.625
2.625

1.534 1.460 1.534


1.534

SUMBER MATERIAL :
1 2 Rata - rata
3508 3006
3596 3076
2217 1893
2.542
2.544 2.541 2.542

2.604
2.608 2.600 2.604

2.709
2.717 2.701 2.709

2.509 2.329 2.419

457860009.xlsx
AN PROYEK

Tanggal :

SUMBER MATERIAL :
ASAR

1 2 Rata - rata
2343.10 2343.10
2381.00 2381.00
1439.00 1439.00
2.487
2.487 2.487 2.487
0.000
2.528
2.528 2.528 2.528
0.000
2.592
2.592 2.592 2.592

1.618 1.618 1.618

457860009.xlsx
SUMBER MATERIAL :
1 2 Rata - rata
2151 2151
2381 2183
1319 1319

2.025 2.490 2.258

2.242 2.527 2.384

2.585 2.585 2.585

10.693 1.488 6.090

AN PROYEK

457860009.xlsx
Tanggal :

SUMBER MATERIAL :
1 2 Rata - rata
489.4 489.5
675.4 674.9
985.1 983.6

2.572 2.559 2.565


2.565
0.000
2.627 2.614 2.621
2.621
0.000
2.724 2.707 2.716
2.716

2.170 2.145 2.158

SUMBER MATERIAL :
1 2 Rata - rata
493.1 493.1
645.8 645.8
961.8 961.8

2.680 2.680 2.680


2.680
0.000
2.717 2.717 2.717
2.717
0.000
2.784 2.784 2.784
2.784

1.399 1.399 1.399

457860009.xlsx
AN PROYEK

457860009.xlsx
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )

METODE REFLUX
(SNI 03-6894-2202 DAN 03-3640-1994)
No UraIan 1 2 Rata2
1 Berat benda uji sebelum extraxsi (a) 450.00 425.00
2 Berat benda uji sesudah extraxsi (b) 421.60 398.80
3 Berat air (c) 2.00 1.50
4 Berat filter sebelum (d) 1.60 1.60
5 Berat filter sesudah (e) 2.80 2.80
6 Berat abu dalam filter (f) (d-e) 1.20 1.20
7 Berat agregat (g) (b+f) 422.80 400.00

(a-c)-b
Kadar aspal X 100% = 5.893 5.832 5.863
(a-c)

No. saringan KOMULATIF NO. SARINGAN KOMULATIF


RATA2 SPESIFIKASI KET
inch mm B. Tthn % Tthn % Lolos (Inch) (mm) B. Tthn % Tthn % Lolos

1½ 38.100 0.00 0.00 100.00 100.00 3/4 19.000 0.00 0.00 100.00 100

1" 25.400 35.75 8.46 91.54 45.77 1"


3/4 19.000 43.45 10.28 89.72 94.86 3/4 19.000 0.00 0.00 100.00 100

1/2 12.700 46.00 10.88 89.12 89.06 1/2 12.700 44.00 11.00 89.00 87 - 100

3/8 9.800 55.00 13.01 86.99 86.25 3/8 9.800 58.00 14.50 85.50 55 - 88

#.4 4.750 87.00 20.58 79.42 77.34 #4 4.750 99.00 24.75 75.25 -

#8 2.380 178.70 42.27 57.73 58.37 #8 2.380 164.00 41.00 59.00 50 - 62

#16 1.180 185.00 43.76 56.24 54.75 #16 1.180 187.00 46.75 53.25 -

#30 0.600 256.00 60.55 39.45 40.60 #30 0.600 233.00 58.25 41.75 20 - 45

#50 0.300 276.00 65.28 34.72 28.49 #50 0.300 311.00 77.75 22.25 15 - 35

#200 0.075 336.00 79.47 20.53 17.01 #200 0.075 346.00 86.50 13.50 6 - 10

100

90

80

70

60
% lolos

50

40

30

20

10

0
1

Ukuran saringan (mm)

KONTRAKTOR KONSULTAN PROYEK

MARSHALL CORE TEAM 2011CORE


MARSHALL CORE TEAM 2011CORE
EXTRAKSI

26.40 24.70
448.00 423.50

0.152
68.54

19.000 100 100 100.00


12.700 87 100 89.06
9.800 55 88 86.25
2.380 50 62 58.37
0.600 20 45 40.60
0.300 15 35 28.49
0.075 6 10 17.01

19.000 0
19.000 100
9.800 0.600
9.800 0.600
2.380 0.300
2.380 0.300
0.075
0.075

MARSHALL CORE TEAM 2011CORE


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )

BERAT JENIS CAMPURAN MAXIMUM ( Gmm)


SNI 03 - 6893 - 2002

NOMOR CONTOH
URAIAN
1 2
Berat piknometer + benda uji A 969.5 1457.6
Berat piknometer B 293.5 303.8
Berat benda uji ( A - B ) C 676 1153.8
Berat piknometer + air D 1350 1297.9
Berat piknometer + benda uji + air E 1738.4 1962.8
Berat benda uji (C + D) - E F 287.6 488.9
Gmm C/F) 2.350 2.360

Di Setujui Oleh Di Periksa Oleh Konsultan Supervisi PT. Di Buat Oleh Kontraktor PT.
Pengawas PU BM ESKAPINDO MATRA CE WINDHU TUNGGAL UTAMA
UMAHAN RAKYAT

MALUKU DAN MALUKU UTARA )

mm)

NOMOR CONTOH
Rata2

2.355

Di Buat Oleh Kontraktor PT.


WINDHU TUNGGAL UTAMA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH IX ( MALUKU DAN MALUKU UTARA )

ANALISA BERAT JENIS AGREGAT


BERAT JENIS
KOMPONEN PROPORSI (%) KETERANGAN
BULK SSD APPARENT

a) BIN I 19% 2.523 2.562 2.625

b) BIN II 34% 2.542 2.604 2.709

c) BIN III 29% 2.487 2.528 2.592

d) BIN IV 12% 2.565 2.621 2.716

e) ASBUTON 6% 3.150 3.150 3.150

100
BULK = =
18.86 33.95 29.23 12.26 6
+ + + +
2.523 2.542 2.487 2.565 3.150

100
SSD = =
18.86 33.95 29.23 12.26 6
+ + + +
2.562 2.604 2.528 2.565 3.150

100
APPARENT = =
18.86 33.95 29.23 12.26 6
+ + + +
2.625 2.709 2.592 2.716 3.150

Di Periksa Oleh Konsultan


Di Kerjakan Oleh Kontraktor PT.
Di Setujui Oleh Pengawas Lapangan Supervisi PT. ESKAPINDO MATRA
WINDHU TUNGGAL UTAMA
CE
DAN MALUKU UTARA )

KETERANGAN

2.592

18.86
39.168899 33.95 39.955
2.503
2.503 29.23
12.26
5.7

38.55352642 38.725
2.582

37.32094079 37.42094
2.672

jakan Oleh Kontraktor PT.


DHU TUNGGAL UTAMA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII

RANCANGAN CAMPURAN ASPAL


URAIAN NILAI SATUAN

Proporsi fraksi Kasar CA 70.61 %

Proporsi fraksi Halus FA 23.69 %

Proporsi Bahan Asbuton FF 5.70 %

Nilai Konstanta K 1.00 %

Perkiraan Kadar Aspal Pb 5.56 %

Rumus Perkiraan Kadar Aspal (Pb)

Pb =0,035 (CA) + 0,045 (FA) + 0,18 (FF) + K

KOMPOSISI KADAR ASPAL RENCANA (%)


KOMPONEN
AGREGAT 5 5.5 5.7 6.5 7
a HOT BIN I 12% 11.647 11.586 11.561 11.463 11.402

b HOT BIN II 29% 27.769 27.622 27.564 27.330 27.184

c HOT BIN III 34% 32.253 32.083 32.015 31.743 31.574

d HOT BIN IV 19% 17.917 17.823 17.785 17.634 17.540

e ASBUTON 6% 5.415 5.387 5.375 5.330 5.301

TOTAL AGG. CAMPURAN (%) 100% 95.000 94.500 94.300 93.500 93.000

TOTAL CAMPURAN (%) 100.00 100.000 100.000 100.000 100.000

KOMPOSISI CAMPURAN KOMPOSISI AGGREGAT BERAT TIMBANGAN


KADAR ASPAL RENCANA % 5 5.5 5.7 6.5 7
a HOT BIN I 12% 128.1 127.4 127.2 126.1 125.4

b HOT BIN II 29% 305.5 303.8 303.2 300.6 299.0

c HOT BIN III 34% 354.8 352.9 352.2 349.2 347.3

d HOT BIN IV 19% 197.1 196.0 195.6 194.0 192.9

e ASBUTON 6% 59.6 59.3 59.1 58.6 58.3

BERAT AGREGAT CAMPURAN (gr) 1045.0 1039.5 1037.3 1028.5 1023.00

BERAT ASPAL (gr) 55.0 60.5 62.7 71.5 77.0

BERAT RENCANA TOTAL CAMPURAN (gr) 1100.0 1100.0 1100.0 1100.0 1100.0

#REF! #REF! #REF! #REF! #REF!


KONTRAKTOR KONSULTAN PROYEK
128 127 127 126 125
305 304 303 301 299
355 353 352 349 347
197 196 196 194 193
60 59 59 59 58
1045 1040 1037 1029 1023

Timbangan di LAB
k.aspal 5 5.5 5.7 6.5 7
Berat panci 176.1 176.1 176.1 176.1 176.1
Berat panci + aggregat 1006 1009 1002 1000 991
Berat agregat 829.9 832.9 825.9 823.9 814.9
Berat bitumen 44 48 50 57 61
Berat timbangan 1050 1057 1052 1057 1052

Timbangan di AMP Berat rencana /Batch 700 700 Kg 6.00% 0.94


BIN I = 12% 81 81
BIN II = 29% 192 273
BIN III = 34% 223 496
BIN IV = 19% 124 620
Filler = 6% 38 658
Kadar aspal = 6.00% 42.0 700 TOTAL
68.61

25.69

5.7

100.00

4.66
GRAFIK MARSHALL
KA

6 7.2 7.2 6 7.2 7.2


2.243000 2.243000 2.140000 4.61 4.61 0
Kadar aspal >< VIM 5
Kadar aspal >< Kepadatan 2
10 5.5
9
2.380 8 5.7
7
2.340 6 6.5
5
2.300 4
7
3
2.260 2
2.226 1
2.220 0 0
5 5.2 5.4 5.6 5.8 6 6.2 6.4 6.6 6.8 7
2.180 3
5 5.5 6 6.5 7 5
5.5
6

Kadar aspal >< VFB 6.5


Kadar aspal >< VMA
7
20 90
85
19
80 5
18 75
73.00 5.5
17 70
6
16 65
60 6.5
15 15.03
55 7
14 3 50 3
1
5 5.2 5.4 5.6 5.8 6 6.2 6.4 6.6 6.8 7 5 5.2 5.4 5.6 5.8 6 6.2 6.4 6.6 6.8 7

5.5
5.7
Kadar aspal >< Stability Kadar aspal >< MQ
6.5
600
2500 1532.6
2277.05 500

2000 400

300
1500
200

1000 100 3
5 5.5 6 6.5 7 5 5.2 5.4 5.6 5.8 6 6.2 6.4 6.6 6.8 7

Kadar
Kadar aspal
aspal ><VIM
>< VIM Prd PRD
Kadar aspal >< flow
5
8
10.54.5
7 9.5 4 4.20
8.5
6 3.5
7.5
6.5 3
5 4.90 5.52.5
4 4.5 2
3.51.5
3
2.5
1.5
1 3
2 3
5 5.5 6 6.5 7
5 5.5 6 6.5 7 6 6.2 6.4 6.6 6.8 7 7.2 7.4 7.6 7.8 8

kus PWR 2012


4.90 5.52.5
4 4.5 2
3.51.5
3
2.5
1.5
1 3
2 3
5 5.5 6 6.5 7
5 5.5 6 6.5 7 6 6.2 6.4 6.6 6.8 7 7.2 7.4 7.6 7.8 8

kus PWR 2012


7

2.243 4.61
PADAT VIM 5
2.282 3.84 7 5 3 4
2.289 2.89 5.7 5 3 4
2.255 4.06 5.7 0.00
2.296 1.27 8 10.00
2.226 3.60 8

STAB VMA VFB


673.54 5 13.376 5 71.35 5 5.4 5.80
2321.08 7 13.573 7 78.73 7 5.4 5.80
2481.98 800.00 15.029 15 73.00 65.00 50 14.00
2282.76 800.00 14.24 15 91.06 65.00 90 20.00
2655.70 17.271 79.13
FLOW MQ
3.35 5 200.87 5 7.85
4.69 7 494.05 7 7.85
4.90 3 606.92 250 100
5.45 3 419.48 250 400
6.55 405.82

PRD
3.83 5 7.85
3.77 7 7.85
3.12 2.5 2
2.5 6

PADAT VIM VMA VFB


7 2.226 3.604293 15.03 73.00
5.7 2.255 3.604293 15.03 73.00
5.7 2.18 0 14 50

STAB MQ FLOW PRD


2277.05 607 4.90 4.2
2277.05 606.92 4.9 4.2
700 100 2 1

kus PWR 2012


KEMENTERIAN PEKERJAAN UMUM

DIREKTORAT JENDERAL BINA MARGA


BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII

EVALUASI
SIFAT - SIFAT CAMPURAN ASPAL
KADAR ASPAL
SIFAT - SIFAT
5.0 5.5 5.7 6.0 7.0

STABILITAS MARSHALL

RONGGA DALAM AGREGAT (VMA)

RONGGA TERISI ASPAL (VFB)

RONGGA DALAM CAMPURAN (VIM)

RONGGA PRE REFUSAL DENSITY (VIM PRD)

KELELEHAN (FLOW)

MARSHALL QUITIENT (MQ)


7 5.7

No SIFAT - SIFAT NILAI SATUAN SPESIFIKASI


1 Kadar aspal optimum 5.7 % -
2 Kepadatan 2.255 g/cm3 -
3 Rongga dalam agregat (VMA) 15.03 % Min 15
4 Rongga terisi aspal (VFB) 73.00 % Min 65
5 Rongga dalam campuran (VIM) 3.60 % 3-5
6 Rongga dlm campuran membal (VIM PRD) 4.20 % Min 2.5
7 Stabilitas 2277.05 Kg Min 800
8 Marshall Quotient (MQ) 606.92 Kg/mm Min 250
9 Kelelehan Marshall (Flow) 4.90 mm Min 3

KONTRAKTOR KONSULTAN PROYEK


JOB MIX FORMULA
ASPHALT CONCRETE BINDER COURSE
PEMELIHARAAN BERKALA JALAN BTS. KOTA ENDE - GAKO

KONRAKTOR
PT. AGOGO GOLDEN GROUP
KONSULTAN
PT. DELTA TAMA WAJA CORPORATION
ENDE 20 JUNI 2012
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII 2.160 96.28
KEGIATAN :
PAKET :
KONSULTAN : Tanggal :
KONTRAKTOR :
Type Campuran :

KEPADATAN CAMPURAN PANAS (CORE DRILL)


POSISI TEBAL BERAT CONTOH VOLUME BJ. BULK (Gr/cc) KEPADATAN Tebal gembur
NO STA SPEK
L/CL/R CM DI UDARA DLM AIR SSD CM3 LAP LAB (%) CM
1 3.50 705.0 388.0 707.5 319.5 2.207 2.244 98.35 MIN 98 4
2 2.40 626.9 343.0 632.5 289.5 2.165 2.244 96.52 MIN 98 2.8
3 3.00 378.3 194.4 369.0 174.6 2.167 2.244 96.57 MIN 98 3.3
4 3.80 397.2 214.5 399.7 185.2 2.145 2.244 95.60 MIN 98 4.3
LINTASAN 12

5 3.30 533.0 289.4 535.5 246.1 2.166 2.244 96.54 MIN 98 3.3
6 3.90 543.5 289.9 545.8 255.9 2.124 2.244 94.67 MIN 98 3.9
7 4.20 581.7 312.9 583.4 270.5 2.150 2.244 95.85 MIN 98 5
8 3.00 420.1 228.9 422.5 193.6 2.170 2.244 96.72 MIN 98 3.7
9 4.80 740.1 396.9 743.8 346.9 2.133 2.244 95.09 MIN 98 5.8
10 4.50 611.5 332.4 613.7 281.3 2.174 2.244 96.89 MIN 98 4.8

Disetujui Oleh, Diperiksa Oleh, Diajukan oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor
PT> BUANA ARCHICON JO BAYU PRATAMA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII 2.189 97.58
KEGIATAN :
PAKET :
KONSULTAN Tanggal :
KONTRAKTOR
Type Campuran :
KEPADATAN CAMPURAN PANAS (CORE DRILL)
POSISI TEBAL BERAT CONTOH VOLUME BJ. BULK (Gr/cc) KEPADATAN Tebal gembur
NO STA SPEK
L/CL/R CM DI UDARA DLM AIR SSD CM3 LAP LAB (%) CM
1 4.50 625.3 340.5 626.4 285.9 2.187 2.244 97.49 MIN 98 5.6
2 4.50 649.6 357.3 651.5 294.2 2.208 2.244 98.42 MIN 98 5.7
3 4.50 750.2 409.2 753.4 344.2 2.180 2.244 97.15 MIN 98 5.4
4 3.00 840.6 457.8 842.1 384.3 2.187 2.244 97.50 MIN 98 3.7
LINTASAN 14

5 3.80 768.5 415.8 769.2 353.4 2.175 2.244 96.93 MIN 98 4.6
6 3.20 933.2 508.5 935.7 427.2 2.184 2.244 97.37 MIN 98 3.8
7 3.00 734.1 403.0 736.2 333.2 2.203 2.244 98.20 MIN 98 3.7
8
9
10

Disetujui Oleh, Diperiksa Oleh, Diajukan oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor
PT> BUANA ARCHICON JO BAYU PRATAMA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL WILAYAH VIII
KEGIATAN :
PAKET :
KONSULTAN Tanggal :
KONTRAKTOR 2.227 99.25
Type Campuran :
KEPADATAN CAMPURAN PANAS (CORE DRILL)
POSISI TEBAL BERAT CONTOH VOLUME BJ. BULK (Gr/cc) KEPADATAN Tebal gembur
NO STA SPESIFIKASI
L/CL/R CM DI UDARA DLM AIR SSD CM3 LAP LAB (%) CM
1 4.1 667.0 370.7 669 298.3 2.236 2.244 99.67 MIN 98 4.2
2 4.7 664.0 373.0 664.6 291.6 2.277 2.244 101.50 MIN 98 4.8
3 3.9 687.6 380.8 689.5 308.7 2.227 2.244 99.28 MIN 98 4.0
4 4.2 629.9 350.9 630.5 279.6 2.253 2.244 100.42 MIN 98 4.3
16 LINTASAN

5 4.1 757.7 409.9 758.4 348.5 2.174 2.244 96.91 MIN 98 4.3
6 3.1 447.1 241.0 448.6 207.6 2.154 2.244 95.99 MIN 98 3.3
7 5.3 717.3 398.7 718.5 319.8 2.243 2.244 99.98 MIN 98 5.5
8 4.0 648.0 359.6 649.7 290.1 2.234 2.244 99.56 MIN 98 4.1
9 4.5 600.5 334.9 602.6 267.7 2.243 2.244 99.99 MIN 98 5.5
10

Disetujui Oleh, Diperiksa Oleh, Diajukan oleh,


Pengawas Lapangan Konsultan Pengawas Kontraktor
NO LINTASAN Kepadatan (%)

1 12 96.28
2 14 97.58
3 16 99.25

GRAFIK LINTASAN
100.00

99.00

98.00
% KEPADATAN

97.00

96.00

95.00

94.00
10 11 12 13 14 15 16 17 18 19 20

JUMLAH LINTASAN
95.00

94.00
10 11 12 13 14 15 16 17 18 19 20

JUMLAH LINTASAN
1.142857
1.166667
1.1
1.131579
1
1
1.190476
1.233333
1.208333
1.066667
1.123991
1.244444
1.266667
1.2
1.233333
1.210526
1.1875
1.233333
1.225115
1.02439
1.021277
1.025641
1.02381
1.04878
1.064516
1.037736
1.025
1.222222
1.054819
12 96.28
14 97.58
16 99.25
TACK COAT

PEMAKAIAN
LOKASI UKURAN KERTAS UKURAN BERAT SPESIFIKASI
ASPAL
KETERANGAN
B. kertas B. Kertas Berat
NO STA Panjang Lebar Luas Kg/m 2
Ltr/m 2
Kg/m 2
semula dan aspal aspal

(mm) (mm) (mm2) (gr) (gr) (gr)


1 0 + 300 340 230 78200 35 98 63 0.806 0.782 0,5 - 1,0 Memenuhi

4
RANCANGAN CAMPURAN KERJA (JMF)

MATERIAL
1 BATU PECAH 3/4" EX.NANGAPANDA
2 BATU PECAH 1/2" EX. NANGAPANDA
3 ABU BATU EX. NANGAPANDA
4 PASIR EX.NANGAPANDA
5 FILLER / SEMEN EX. TIGA RODA
6 ASPAL EX. PERTAMINA
7 ADDITIVE EX. DERBO

NO KOMPONEN SATUAN PROPORSI SPESIFIKASI KETERANGAN


1 HOT BIN I % 12.26 - Tdk disyaratkan
2 HOT BIN II % 29.23 - Tdk disyaratkan
3 HOT BIN II % 33.95 - Tdk disyaratkan
4 HOT BIN III % 18.86 - Tdk disyaratkan
5 FILLER % 5.7 Max 2.0 Memenuhi
6 KADAR ASPAL % 7.2 - Tdk disyaratkan
7 ADDITIVE % 0.3 - Thdp. Peren aspal
SIFAT - SIFAT
NO SIFAT - SIFAT SATUAN HASIL SPESIFIKASI KETERANGAN
1 kadar aspal total % 7.2 - Tdk disyaratkan
2 Berat jenis Camp. (GMM) % 2.36 - Tdk disyaratkan
3 Berat Jenis Aspal % 1.03 - Tdk disyaratkan
4 Penyerapan aspal effektif % 0.7415 Max 1.7 Memenuhi
5 Berat Jenis camp. Padat (Gmb) T/m 3
2.24 - JSD
6 Stabilitas Kg 772.67 Min 800 Memenuhi
7 Kelelehan Marshall (FLOW) % 3.60 Min 3 Memenuhi
8 Marshall Quotient (MQ) % 232.73 Min 250 Memenuhi
9 Rongga dlm campuran (VIM) % 3.64 3-6 Memenuhi
10 Rongga dlm agregat (VMA) % 16 Min 18 Memenuhi
11 Rongga terisi aspal (VFB) % 73.6 Min 60 Memenuhi
12 Rongga kepadatan mutlak % 3 Min 2 Memenuhi

Disetujui Oleh, Disetuui Oleh, Diajukan Oleh,


Pengawas Konsultan Pengawas Kontraktor Pelaksana
12% 12.26
29% 29.23
34% 33.95
19% 18.86
6% 5.7
7% 7.2
0.3
KALIBRASI COLD BIN
BUKAAN W R r m q
(cm)
COLD BIN I ( kg ) (meter/menit) (meter) (%) (kg/menit)
5 7.00 24.00 2.00 3.00 28.00
10 11.50 24.00 2.00 3.00 46.00
15 23.00 24.00 2.00 3.00 92.00
COLD BIN II
5 6.80 24.00 2.00 2.00 163.20
10 8.10 24.00 2.00 2.00 194.40
15 14.20 24.00 2.00 2.00 340.80
COLD BIN III
5 1.50 24.00 2.00 2.50 45.00
10 2.60 24.00 2.00 2.50 78.00
15 5.00 24.00 2.00 2.50 150.00
COLD BIN IV
5 2.00 24.00 2.00 1.00 24.00
10 5.00 24.00 2.00 1.00 60.00
15 11.00 24.00 2.00 1.00 132.00

WR W = berat agregat m = kadar air agregat


q=
r(1+m) R = kecepatan ban berjalan
r = panjang ban berjalan dlm meter dimana agregat
diambil untuk ditimbang
Q = 0.151 TP
Q = aliran agregat yg diperlukan
T= produk rencana AMP (ton/jam)
P= proporsi agregat thdp camp total(%)
Contoh :
Kapasitas AMP tiap jam ditentukan 60 Ton dengan perbandingan proporsi (hasil agregat
gabungan), BIN I (Agg. Max 3/4) 19%, BIN II (Agg. Max 1/2) 19%, Abu batu 45%, Pasir 15%, dan
kadar aspal 7%, dari hasil proporsi di atas diperlukan jumlah material masing-masing adalah
sebagai berikut :

BIN I : 0.151 x 60 X 15 = 135.90 kg/meni


t
BIN II : 0.151 x 60X 45= 407.70 kg/meni
t
BIN III : 0.151 x60 X 19 = 172.14 kg/meni
t
BIN IV : 0.151 x60 X 19 = 172.14 kg/meni
t
GRAFIK BUKAAN PINTU

00
0.
60 0 0
0.
56 0 0 BIN I
0. Linear
52 0 0
0. (BIN I)
48 0 0
0. BIN II
44 0 0 Linear
0.
40 0 0 (BIN II)
0.
36 0 0
kg/menit

0.
32 0 0
0.
28 0 0
0.
24 0 0
0.
20 0 0
0.
16 0 0
0.
12 0 0
.
80 0
.0
40 0
0
0. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
BERITA ACARA
PERCOBAAN CAMPURAN DAN PEMADATAN PEKERJAAN
LATASTON LAPIS AUS (HRS WEARING COURSE) GRADASI SEMI SENJANG
(TRIAL SECTION)
PELAKSANA KEGIATAN : PPK SOE - BATAS KOTA KEFAMENANU
PAKET KONTRAK : PEMELIHARAAN BERKALA JALAN NIKI NIKI - NOELMUTI
TANGGAL KONTRAK : 16 MARET 2012
KONTRAKTOR : PT. HUTAMA KARYA (Persero)
KONSULTAN SUPERVISI : PT. CIPTA STRADA JO. CV. KENCANA LAYANA KONSULTAN

Pada hari ini Senin tanggal Empat Belas Bulan Mei Tahun Dua Ribu Dua Belas, telah diadakan Percobaan
Campuran (Trial Mix) dan Pemadatan (Trial section) untuk pekerjaan Lataston Lapis Aus (HRS WC)
Gradasi semi senjang Paket : PEMELIHARAAN BERKALA JALAN NIKI NIKI - NOELMUTI)

TATA CARA PERCOBAAN LABORATORIUM


Dimana untuk tahap awal diadakan pengujian material untuk campuran beraspal dengan dasar Rumus
Campuran Rancanaga (Design Job Formula) yang dikeluarkan oleh Bidang Pengujian Dinas Pekerjaan
Umum Provinsi Nusa Tenggara Timur, yang didalamnya dicantumkan Sumber Material atau agregat,
ukuran nominal makasimum partikel dan sifat-sifat fisik dari masing-masing material atau bahan serta
ringkasan ketentuan yang ditetapkan spesifikasi dari campuran yang dimaksud.

Perlakuan dalam skala besar, dari masing-masing Cold Bin AMP yang telah diisi material Stock pile,
material diambil dan selanjutnya dilkukan percobaan pemisahan butiran dilaboratorim guna
digambarkan dengangrafik gradasi dari stok matwrial dengan tujuan mendapatkan bayangan komposisi
campuran.

Dari gradasi di stok material (Cold Bin) didapatkan komposisi campuran sebagai berikut :

1. Batu Pecah ukuran 3/4" Ex Polen 7.04%


2. Batu Pecah ukuran 1/2" Ex Polen 14.00%
3. Batu Pecah ukuran 3/8" Ex Polen 18.00%
4. Abu batu Ex. Stone Crusher Ex Polen 36.00%
5. Pasir alam Ex Polen 23.00%
6. Filler Ex Semen Kupang 2.00%
6. Filler Ex Semen Kupang
RANDOM Y RANDOM X
0.342 12.0 0.675 2.0
0.129 4.5 0.157 0.5
0.524 18.3 0.227 0.7
0.225 7.9 0.919 2.8
0.516 18.1 0.322 1.0
0.806 28.2 0.531 1.6

RANDOM Y RANDOM X
0.320 11.2 0.734 2.2
0.781 27.3 0.953 2.9
0.348 12.2 0.399 1.2
0.071 2.5 0.091 0.3
0.731 25.6 0.030 0.1
0.057 2.0 0.002 0.0

RANDOM Y RANDOM X
0.949 33.2 0.175 0.5
0.079 2.8 0.443 1.3
0.977 34.2 0.918 2.8
0.633 22.1 0.108 0.3
0.592 20.7 0.812 2.4
0.810 28.4 0.284 0.9