Professional Documents
Culture Documents
Laguna Bel Boq
Laguna Bel Boq
IV FORM WORKS
5.0 FORM WORKS & SCAFFOLDING
a. Coco Lumber 2"x 3" x 12'Ft
b Coco Lumber 2"x 3" x 10'Ft
c. Ordinary Plywood 1/2"
d. Assorted Common Nail
e. Scaffolding (rental)
f. Shoring Jack
g. Consumables
Sub- Total
V ARCHITECTURAL WORKS
5.1 Ceiling WORKS
a. Hardiflex 1/4"
b. Bracing
c. Consumables
Sub- Total
5.5 Kitchen
a. Counter top w/ Granite
b. Consumables
Sub- Total
VI ROOFING WORKS
6.1 Steel Trusses
a. C-Purlins 2" x 4" x 1.2 thk.
b. W1 - 32" x 32" x 4.5mm
c. W2 - 50 x 50 x 4.5mm
d. Welding Rod
e. Red Oxide
d. Welding Machine
f. Consumbles
Sub- Total
Prepared By :
- - - -
- - - -
1.0 lot 4,000.00 20,000.00
120,000.00
5,192,786.45
259,639.3
623,134.4