SAUDI ARAMCO
CORONAVIRUS PREVENTION AND CONTROL
PLAN
DOCUMENT TITLE:
DOCUMENT NO:
CONTRACT NO:
Jan 30,
00
2020
Page 1 of 8
SINOPEC ENGINEERING (GROUP) CO. LTD.
SAUDI ARAMCO
CORONAVIRUS PREVENTION AND CONTROL
PLAN
1. Purpose
2. Action Plan
Team Structure
a. Team Leader: Peng Fucheng, Lu Jun
b. Deputy Team Leader: Wu Guohua, Wang Ming, Xie
Baoqiang, Zhang Jie, Lu Hongxing, Chen Zhaorong, Hu
Page 2 of 8
SINOPEC ENGINEERING (GROUP) CO. LTD.
SAUDI ARAMCO
CORONAVIRUS PREVENTION AND CONTROL
PLAN
Coordinators
a. Project Management Department: Zhang Dong
0532751677; HR Department: Ma Jinshan 0508649627;
Admin Department: Niu Binghai 0507587006; Camp
Management Center: Xia Xingfang 0554620852.
b. FGP Project: Huang Jiangnan ; EP1 Project: Wang
Xisheng; EP2 Project: Zhou Feng 0530180487; WP
Project: Pan Xiao 0551710588; NP Project: Meng Lingjian
0530743219.
Each project, unit and department shall verify the suspected infection
of their subordinates, on-site personnel, and those returning from
vacation, and reports it to the centre before 11:45 Saudi time on a daily
basis.
Page 3 of 8
SINOPEC ENGINEERING (GROUP) CO. LTD.
SAUDI ARAMCO
CORONAVIRUS PREVENTION AND CONTROL
PLAN
Employees' safety and health is in the first place; early detection, early
reporting, early isolation, and early treatment.
Page 4 of 8
SINOPEC ENGINEERING (GROUP) CO. LTD.
SAUDI ARAMCO
CORONAVIRUS PREVENTION AND CONTROL
PLAN
4. Others
Page 8 of 8