I. PROJECT TITLE: Assistance to Severely Affected Fisherfolks by Typhoon


URSULA in Biliran Province

II. PROJECT PROPONENT: BFAR 8 – PFO Biliran

III. DURATION: January – May 2020

IV. PROJECT COST: 5,509,700.00


V. RATIONALE:

Biliran Province was one of the worst-hit provinces by Typhoon Ursula. Several houses
including fishing boats were washed out by storm surge and were damaged by the strong winds
that was felt on Christmas Eve. Due to the damages brought by the typhoon, the whole of
Biliran Province was declared under state of calamity.

As of January 7, 2019, the estimated total damages on fisheries in the Province of Biliran
reached Php 66,847,575. The total includes destroyed fishing boats, fishing gears, engines,
mariculture infrastructure and seaweed farm implements.

The eight (8) coastal municipalities were affected by the typhoon, however, the worst-hit
were the municipalities of Kawayan, Caibiran, and Culaba.

Indeed, for our local fisherfolks to immediately restore their livelihood, repair and
rehabilitation is badly needed.

VI. OBJECTIVES:

General Objectives:

To help recover and provide immediate input assistance to severely affected fisherfolks by
typhoon Ursula in Biliran Province.
Specific Objectives:

1. Distribution of marine plywood and other materials for immediate repair of


motorized/non-motorized wooden boats to 500 partially affected fisherfolks in Biliran
Province.
2. Distribution of fishing gears such as Bottom Set Gillnet and Bottom Set Long Line to
fisherfolks in Biliran Province.

VII. GHANT CHART OF ACTIVITIES


ACTIVITIES MONTHS (2020)
JAN FEB MAR APR MAY
Formulation of proposal
Validation of fisherfolk beneficiaries
Distribution of boat materials and gears
Reporting of accomplishment
Monitoring

VIII. BUDGETARY REQUIREMENTS

a. Wooden Boat
Qty Unit Description Unit Price For 1 unit For 400 units
2 Pcs Marine Plywood, ¼ ”x 4’ x 1,200.00 2,400.00 960,000.00
8 ft. (Sta. Clara)
1 Kgs Copper Nails (1” and 1 ½ ”) 1,200.00 1,200.00 480,000.00
2 L Enamel Epoxy ( A & B) 350.00 700.00 280,000.00
2 L Marine Enamel Paint 350.00 700.00 280,000.00
1 Pcs Paint Brush, 2” 108.00 108.00 43,200.00
1 bottles Lacquer Thinner 60.00 60.00 24,000.00
TOTAL 5,168.00 2,067,200.00
b. Bottom Set Gill net

Qty Unit Description Unit Price For 1 unit For 100 units
1000 m Mononylon net, 7k x 0.20 4.90 4,900.00 490,000.00
6 Kgs Mononylon, #60 lbs/1.00mm 390.00 2,340.00 234,000.00
1 Kgs Mononylon twine, #30/0.65mm 390.00 390.00 39,000.00
15 Kgs Lead sinker, DOUBLE X 220.00 3,300.00 330,000.00
350 Pcs PVC floats J-1.5 5.00 1,750.00 175,000.00
6 Pcs Netting Needle 20.00 120.00 12,000.00
TOTAL 12,800.00 1,280,000.00

c. Bottom Set Long Line

Qty Unit Description Unit Price For 1 unit For 100 units
4 Kls Mono nylon (0.90 lbs test) 360.00 1,440.00 144,000.00
2 Kls Mono nylon (0.35 lbs test) 360.00 720.00 72,000.00
1 Roll PE Rope (4mm) 275.00 275.00 27,500.00
15 Boxes Fishing hooks No. 565 110.00 1,650.00 165,000.00
6 Pcs Brass Stainless Swivel (medium) 45.00 270.00 27,000.00
2 Kls Lead sinker No. 2 200.00 400.00 40,000.00
6 Pcs Styro foam balls (10” dia.) 65.00 390.00 39,000.00
1 Pc Marine Plywood (1/2” LL-BIN) 880.00 880.00 88,000.00
0.5 Kg Copper Nails (1 ½ inch) 1,200.00 600.00 60,000.00
TOTAL 6,625.00 662,500.00

d. Repair/Rehabilitation of Seawall Concrete Reinforcement and Perimeter


Fence of PFO-Biliran (Phase 1) = 1,500,000.00
(Please see attached Program of Work)
BUDGETARY SUMMARY:

Units Description Amount


400 Repair and rehab of wooden boats 2,067,200.00
100 Bottom Set Gillnet 1,280,000.00
100 Bottom Set Long Line 662,500.00
1 Repair/Rehabilitation of 85 ln. m Seawall Concrete 1,500,000.00
Reinforcement and Perimeter Fence of PFO-Biliran (Phase 1)
GRAND TOTAL 5,509,700.00

Prepared and Submitted by:

LUZVIMINDA H. ROBIN
PFO-Biliran

Approved by:

DR. JUAN D. ALBALADEJO


Regional Director