Professional Documents
Culture Documents
HSPK Kelapa Tempilang
HSPK Kelapa Tempilang
TAHUN 2017
Kepala Dinas Pekerjaan Umum dan Penataan Ruang Plt.Kepala Dinas Perumahan Kawasan Permukiman Dan Perhubungan
Kabupaten Bangka Barat Kabupaten Bangka Barat
NOTE :
-
MUHAMMAD KAIDI, S.E
TOKO BESI 6.00 8.00 10.00 12.00
30,000.00 45,000.00 65,000.00 100,000.00
25,000.00 45,000.00 60,000.00 95,000.00
35,000.00 55,000.00 70,000.00 95,000.00
30,000.00 45,000.00 60,000.00 85,000.00
25,000.00 40,000.00 65,000.00 90,000.00
30,000.00 45,000.00 65,000.00 80,000.00
JUMLAH 175,000.00 275,000.00 385,000.00 545,000.00
228,000.00
57,000.00
60,000.00 70,000.00
55,000.00 65,100.00
57,000.00 66,500.00
54,500.00 63,700.00
226,500.00 265,300.00
56,625.00 66,325.00
NO JENIS BESI DIAMETER Ø BERAT JENIS Panjang M
1 6 2.66 12
2 8 4.47 12
3 9 6.00 12
4 10 7.40 12
5 12 10.66 12
6 BESI BETON POLOS 13 12.48 12
7 16 18.96 12
8 19 26.76 12
9 22 35.76 12
10 25 46.20 12
11 28 57.96 12
12 32 75.72 12
13 36 95.88 12
28000
50000
60000
55000
165000 55000 11000