PILE CP REBAR BENDING SCHEDULE PIER 2

Size r
No. Sketsa Gambar Rebar Steel Type
mm

1 N1 HRB500 22 13.82

2 N2 HRB500 29 18.21
a e
3 b c d N3 HRB500 16 10.05

4 N4 HRB500 16 10.05

e d

5 c N5 HRB500 13 8.16

a b

6 N6 HRB500 13 8.16
b a
c
g
7 d e f N7 HRB500 13 8.16
a b c d e f g L

cm m

22.79 13.82 1,012.18 13.82 22.79 1,085.40

30.89 18.21 667.79 18.21 30.89 766.00

16.58 10.05 1,015.95 10.05 16.58 1,069.20

16.58 10.05 675.95 10.05 16.58 729.20

13.52 8.16 166.94 8.16 13.52 210.30

13.52 8.16 56.84 8.16 1,014.64 8.16 13.52 1,123.00

13.52 8.16 56.84 8.16 674.64 8.16 13.52 783.00

Total Volume Pe

Tota

Tota

Tota

Tota
Quantity Total Lenght Weight Totl Weight

Pcs m Kg/m Kg

86 93,344.40 2.99 279,099.76

128 98,048.00 5.19 508,869.12

46 49,183.20 1.58 77,709.46

68 49,585.60 1.58 78,345.25

340 71,502.00 1.04 74,362.08

16 17,968.00 1.04 18,686.72

16 12,528.00 1.04 13,029.12

Total Volume Pembesian Pile Cap 1,050,101.50

Total Volume Besiᴓ13 106,077.92

Total Volume Besi ᴓ16 156,054.70

Total Volume Besi ᴓ22 279,099.76

Total Volume Besi ᴓ29 508,869.12