FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING

UNIVERSITI TUN HUSSEIN ONN MALAYSIA

GROUP PROJECT
(25% marks)
BFC 43201 - Civil Engineering Software (Microsoft Project)
SEM I, 2019/2020

Instruction:

Students are required to submit a comprehensive report consist of:

1. Background information on selected project (location, cost, etc.), introduction of the report,
scope of the report, methodology, discussion & conclusion.
2. Project proposal; work breakdown structure (WBS), working time, table on duration
estimation, Gantt chart, and comparison of physical and financial S-Curve.

Students are encourage to make any logic assumption and it should be written in your project report.

This project needs to be carried out in a group (maximum of 5 students per group). Each group is
required to prepare and submit the report on 18 December 2019, 5.00 pm.

Project Requirement:

1. Only for building works


2. List of activities required to complete a project is 40 activities (minimum).
3. Cost of the project is RM 400,000 (minimum).
4. Project duration is three (3) months (minimum).
5. WBS is three level (minimum).

Students will be evaluated based on:

1. Site Visit
2. Report Content
3. Report presentation (format, sequence of chapters, etc.)
4. Cooperation and commitment among team mates

*Submit your report with a cover page consists of your group members’ details and pictures*

*Don’t forget to write your section number*