Item Rede de alimentação Main substation Subestação

1 OHL-SEM NOME LC00B-J06/J15 LC06B


2 OHL-SEM NOME LC00B-J08/J17 LC07B
3 OHL-SEM NOME LC00B-J08/J17 LC20B
4 OHL-K LC00B-J03 LC20
5 OHL-K LC00B-J03 LC17B
6 OHL-K LC00B-J03 LC21
7 OHL-K LC00B-J03 LC23
8 OHL-K LC00B-J03 LC24
9 OHL-K LC00B-J03 LC16B.2
10 OHL-K LC00B-J03 LC16B.1
11 OHL-M LC00B-J09 LC03B
12 OHL-M LC00B-J09 LC01B
13 OHL-M LC00B-J09 LC14B
14 OHL-M LC00B-J09 LC13B
15 OHL-M LC00B-J09 LC02B
16 OHL-O LC00B-J18 LC11(08B)
17 OHL-O LC00B-J18 LC09B

18 OHL-SEM NOME LC00B-J20 LC22B

19 OHL-SEM NOME LC00B-J20 LC24B

20 OHL-SEM NOME LC00B-J20 LC23B


21 OHL-SEM NOME LC00A-J03/J12 LC01
22 OHL-SEM NOME LC00A-J04/J13 LC02
23 OHL-E LC00A-J06 LC-30B
24 OHL-E LC00A-J06 LC-04B
25 OHL-E LC00A-J06 LC-06
26 OHL-E LC00A-J06 LC-05
27 OHL-E LC00A-J06 LC-28
28 OHL-E LC00A-J06 LC-28B
29 OHL-F LC00A-J07 LC-35
30 OHL-F LC00A-J07 LC-26
31 OHL-F LC00A-J07 LC-22
32 OHL-F LC00A-J07 LC-10B
33 OHL-F LC00A-J07 LC-10
34 OHL-F LC00A-J07 LC-31
35 OHL-H LC00A-J15 LC-14
36 OHL-H LC00A-J15 LC-15B
37 OHL-H LC00A-J15 LC-14.1
38 OHL-H LC00A-J15 LC-12
39 OHL-H LC00A-J15 LC-33
40 OHL-H LC00A-J15 LC-08
41 OHL-H LC00A-J15 LC-13
42 OHL-H LC00A-J15 LC-09
43 OHL-H LC00A-J15 LC-18B
44 OHL-SEM NOME LC00A-J16 LC03
45 OHL-SEM NOME LC00A-J16 LC04
46 OHL-SEM NOME LC00A-J16 LC07
47 OHL-D LC00A-J17 LC-17
48 OHL-D LC00A-J17 LC-29B
49 OHL-D LC00A-J17 LC-18.2
50 OHL-D LC00A-J17 LC-18.1
51 OHL-D LC00A-J17 LC-26B
OHL-SEM NOME LC00B-J21
Utilidade/ilu
Localização Utilidade MTZ 1* MTZ 2* Patio minaçao
Coal preparation Plant C (CPP3) X
Coal preparation Plant D (CPP4) X
Product transfer X
Gate House X
Buter pump station X
Revuboe High lift X
Revuboe low lift 01 X
Revuboe low lift 02 X
Pump station X
Revuboe Pump station X
Transfer station X
Primary Crusher X
Daily maintenance X
Pit de-watering X
Tranfer station X
Stockyard south X
Railway Loud Out X
Overland conveyor feed
Sec/Tert.Crusher X

Secondary/Tertiary Crushing CPP4 X

Secondary/Tertiary Crushing CPP3 X


Coal preparation Plant A X
Coal preparation Plant B X
CPP2 Reject transfer X
CPP2 Reject X
Pit de-watering x
Primary Crusher-QA1 X
Reject conveyor-QA1 X
Rejects Bin X
Stockyard transfer X x
Stockyard TLS x
Hazardous store X
Stockyard north x
Stockyard north x
Railway Lighting x
Canteen and locker room x
New locker room x
Canteen and locker room x
Workshop, water house and LDV x
Clinic x
Main offices x
HDV x
Bulk Fuel x
New HDV Building x
Crusher station X
Laboratory X
Overland conveyor X
Process Wast Water X
Process Treatment X
Process Water CC2 X
Process Water CC1 X
Process Water X
Linha 33kV