Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Ref:BVIPL: SPL: CLl828 I 212019 /2 Date:21.02.

2019
Test Order dated:08.02.20 I 9

M/s Gypelite Lrdia Pvt., Ltd.,


Sarvepalli Bit 2, Y lllage,
Venkatachalam Mandal, Nellore (Andhra Pradesh) - 524 32I.

PRELIMINARY PITYSICAL TEST REPORT ON GYPSUM PLASTER SAMPLX


Source of sample Sample supplied by the customer
Customer Reference Letter No GYP/ACCT/BUREAU/ 17 21 18-19
dated 01.02.2019 & E-mail dated78.02.2019
UIN 1900s219
Project Not Furnished
Water Powder Ratio # 0.7
Identification # Tough Plaster Sample 2
Period of Test 18.02.2019 to 2l .02.2019
Condition of Sample Satisfactory
Test Method lS:2542 (Part 2) - 1981 (Reaffrmed 2017)

sl. Requirements as per


Test Conducted Test Results ISz 2547 @art land 2) - 1976
No.
(Reaffirmed 2017)
I Setting Time (minutes) 30 10-30
Residue on 150 microns IS
2. 1.65 Maximum 5.0
Sieve. o/o
a
J. Transverse Strength (kg/ crfi) 1s.6 Minimum 5.0
Set Plaster does not show
Set plaster pats shall not show
4. Soundness
any sign of
any sign of disintegration,
disintegration, popping or
pittins popping or pitting

5. Dry Bulk Density (kgl*-.) 743 Maximum 770

Compressive Strength
6. 3.8 Minimum 1.0
(N/mm)

Pull off strength (N/mm2)


TYC Not Soecified
@7 Days
# As furnished by the customer.
TYC Test Yet to be Completed

Note: 1. The results relate only to the items tested.


2. Report shall not be reproduced except in full, without the written approval of the lab.
3. Any correction invalidates this report.
for BUREAU VERITAS (INDIA) PRTVATE LIMITED
Construction
bs at: Ahmedabad, Baroda
hennai, Cochin, Coimbatore
a, Hubli, Hyderabad, Indore
Magadi Road, Kamakshipalya, Bangalore - 560 079 | inada, Kandla, Kolkata, Ludhiana
Tel.: +Sl 80 23011800 Fax: *91 80 26716833 1 , Nagpur, Nashik, Pune, Raipur
bangalore.lab@in.bureauveritas.com pdZMpOnt 9\thjPatva, Surat, Trichy & Visakhapatnam
BANGALORE - 560 079.
Ref:BVIPL: SPL: CLl82 8 / 21 2019 I 1 Date:21.02.2019
Test Order dated:}8.02.20 19

M/s Glpelite India Pvt., Ltd.,


Sarvepalli Bit 2, V illage,
Venkatachalam Mandal, Nellore (Andhra Pradesh) - 524 321.

PRELIMINARY PITYSICAL TEST REPORT ON GYPSTJM PLASTER SAMPLE


Source of sample Sample supplied by the customer
Customer Reference Letter No GYP/ACCT/BUREAU/ 17 21 1 8-19
dated 01.02.2019 & E-mail dated18.02.2019
I-IIN t9005219
Project Not Fumished
Water Powder Ratio # 0.7
Identification # Tough Plaster Sample I
Period of Test 18.02.2019 to 21.02.2019
Condition of Sample Satisfactorv
'est I\ ethod IS:2542 (Part 2) - 1981 (Reaflrmed 2017
Requirements as per
sl.
Test Conducted Test Results lS:2547 (Part land 2) -1976
No. (Reaffirmed 2017)
1 Setting Time (minutes) 30 t0-30
Residue on 150 microns IS
2. r.45 Maximum 5.0
Sieve. %

J. Transverse Strength (kgl crfi) 14.5 Minimum 5.0


Set Plaster does not show
Set plaster pats shall not show
any sign of
4. Soundness any sign of disintegration,
disintegration, popping or
popping or pitting
oittins
5. DryBulkDensity (kglm') 760 Maximum 770

Compressive Strength
6.
(N/mm2)
3.0 Minimum 1.0

,| Pull off strength (N/mm2)


TYC Not Specified
@7 Days
# As furnished by the customer.
TYC Test Yet to be Completed

Note: 1. The results relate only to the items tested.


2. Report shall not be reproduced except in full, without the written approval of the lab.
3. Any correction invalidates this report.

for BUREAU VERITAS (INDIA) PRMTE LIMITEI)


Construction Seryices

(tlr;'r'r1 | $ r' t-r I


kr/,tJ Vtt{[1Ab
(ervices LatloratorY
n ^-"";;;
n
4A
Bureau Veritas (India) Private Limited H4
HT
,abs at: Ahmedabad, Baroda
I ct
l)t
( C onstruction S eru i ce s Laboratory ) hennai, Cochin, Coimbatore
43,45-47,Pete Chennappu Inds. i,state, 1st Main M a, Hubli, Hyderabad, Indore
Magadi Road, Kamakshipalya, Bangalore - 560 079 kinada. Kandla. Kolkata. Ludhiana
Tel.: *91 80 23011800 Fax: *91 B0 26716833 'w-ww. Dureauverltas. co.ln Mangalore, Nagpur, Nashik, Pune, Raipur
bangalore.lab@in. bureauverrtas.com CIN: U742 1 0MH200 1PT C'13 4262 Surat, Trichy & Visakhapatnam
RetBVIPL: SPL: CLl828 I 21 2019 I 2 Date:26.02.2019
Test Order dated:08.02.20 I 9

M/s Glpelite India Pvt., Ltd.,


Sarvepalli Bit 2, Village,
Venkatachalam Mandal, Nellore (Andhra Pradesh) - 524 321.
FINAL PHYSICAL TEST REPORT ON GYPSUM PLASTER SAMPLE
Source of sample Sample supplied by the customer
Customer Reference Letter No GYP/ACCT/BUREAU/ 17 2l 18-19
dated 01.02.2019 & E-mail dated78.02.2019
UIN 19005219
Project Not Fumished
Water Powder Ratio # 0.7
Identification # Tough Plaster Sample 2
Period of Test 18.02.2019 to 25.02.2019
Condition of Sample Satisfactory
Test Method lS:2542 (Part 2) - 1981 (Reaffirmed 2017)

sl. Requirements as per


Test Conducted Test Results ISz 2547 @art land 2) -1976
No.
(Reaffirmed 2017)
I Setting Time (minutes) 30 10-30
Residue on 150 microns IS
2. 1.65 Maximum 5.0
Sieve. o%

Transverse Strength (kg/ cr#) 1s.6 Minimum 5.0


Set Plaster does not show
Set plaster pats shall not show
4. Soundness
any sign of
any sign of disintegration,
disintegration, popping or
pittine popping or pitting

5. DryBulk Density (kglrn') 743 Maximum 770

Compressive Strength
6. 3.8 Minimum 1.0
(N/mm2)

Pull off strength (N/mm2)


- 1.23 Not Specified
@7 Days
# As furnished by the customer.
This report supersedes the earlier report of dated 21.02.2019

Note: 1. The results relate only to the items tested.


2. Report shall not be reproduced except in full, without the written approval of the lab.
3. Any correction invalidates this report.

for BUREAU VERITAS (INDIA) PRTVATE LIMITED


Services Laboratory
Bureau Veritas (India Limited Regd. Off. : 72 Business Parf Ground Floor Offices/Labs at: Ahmedabad, Baroda
(Construction Seruices Dv Marol Industrial Ar ross Road'C' Bhopal, Chennai, Cochin, Coimbatore
43,45-47, Pete Chenna 9].INDIA Delhi, Goa, Hubli, Hyderabad, Indore
22 62742008 Jaipur, Kakinada, Kandla, Kolkata, Ludhiana
Tel.: +91 80 23011800 Fax: + Mangalore, Nagpur, Nashik, Pune, Raipur
ban galore.lab@in.bureauveritas.com Surat, Trichy & Visakhapatnam
Ref:BVIPL: SPL: CLl828 I 2 120 19 I I Date:26.02.20L9
Test Order dated:08.02.20 19

M/s Gypelite India Pvt., Ltd.,


Sarvepalli Bit 2, Village,
Venkatachalam Mandal, Nellore (Andhra Pradesh) 524
- 321r

FINAL PITYSICAL TEST REPORT ON GYPSIIM PLASTER SAMPLE


Source of sample Sample supplied by the customer
Customer Reference Letter No GYP/ACCT/BUREAU/ l7 2l 18-19
dated 01.02 .2019 & E-mail dated,18.02.2019
UIN 190052t9
Project Not Furnished
Water Powder Ratio # 0.7
Identification # Tough Plaster Sample 1
Period of Test 18.02.2019 to 25.02.2019
Condition of Sample Satisfactorv
Test Method IS:25 42 2 98I (Reaflrmed 20
sI. Requirements as per
Test Conducted Test Results ISz 2547 (Part land 2) -1976
No.
(Reaffirmed 2017)
I Setting Time (minutes) 30 l0-30
Residue on 150 microns IS
2. 1.45 Maximum 5.0
Sieve, o/o

Transverse Strength (k! crfi) 14.s Minimum 5.0


Set Plaster does not show
Set plaster pats shall not show
4. Soundness
any sign of
any sign of disintegration,
disintegration, popping or
popping or pitting
pittine
5. Dry BulkDensity (kg/m) 760 Maximum 770

Compressive Strength
6. 3.0 Minimum 1.0
(N/mm)

Pull off strength (N/rrun2)


7. t.02 Not Specifred
@7 Days
# As furnished bv the customer.
This report supersedes the earlier report of dated 21.02.2019

Note: 1. The results relate only to the items tested.


2. Report shall not be reproduced except in fuIl, without the written approval of the lab.
3. Any correction invalidates this report.

foT BUREAU VERITAS (INDIA) PRTVATE LIMITED

: 72 Business Park, Ground Floor Offices/Labs at: Ahmedabad, Baroda


strial Area, MIDC. Cross Road'C' Bhopal, Chennai, Cochin, Coimbatore
43,45-47, Pete Chenn I st), Mumbai - 400 093. INDIA Delhi, Goa, Hubli, Hyderabad, Indore
Magadi Road, Kamaks 9 62742000 Fax: *91 22 62742008 Jaipur, Kakinada, Kandla, I{olkata, Ludhiana
Tel.: *91 80 23011800 Fax: *91 80 26716833 verltas.co.ln Mangalore, Nagpur, Nashik, Pune, Raipur
bangalore.lab@in.bureauveritas.com CIN: U742 1 0MH2001PTC 134262 Surat, tichy & Visakhapatnam

You might also like