1.

3.23
Fck = 25 MPa Fy = 415 MPa
DIAMETER OF THE CURVED BAEM C/C = 3.23 m
RISE = 1.5 m
CHORD DIFFERENCE = 0 m
TOTAL RISE OF THE BEAM C/C = 1.5 m
NO OF PARTS TO BE DIVIDED = 10
RADIUS OF THE CURVED BEAM = 1.619 m
INCLUDED ANGLE OF THE SECTOR = 171.543 degrees
CURVED LENGTH OF THE BEAM 4.85 m
BEAM SECTION :
BREADTH b = 230 mm
DEPTH h = 450 mm
CLEAR COVER = 30 mm
DIAMETER OF MAIN REINFORCEMENT = 20 mm
EFFECTIVE DEPTH = 410 mm

LOAD CALCULATION :
SELF WEIGHT = 2.5875 KN/m
SLAB LOAD = 7.75 KN/sqm
SLAB LOAD TRANSFERRED ON TO THE BEAM = 1.60 KN/m
WALL LOAD = 11.95 KN/m
TOTAL LAOD w = 16.14 KN/m

SEMI CENTRAL ANGLE = 85.771 degrees


1.497 radians
q = EI / GJ = 3.5h2 = 2.233
6b 2

C = 2(q+1)sinq - 2qqcosq 1.2540


(q+1)q-(q-1)sinqcosq

e = b2 = 2.72 mm
12 R
Rc = 1.62

wR2 = 42.4586 KN.

AT f = 0 deg AT MID SPAN SECTION :


MFc = w x R2(c cosf -1) = 10.7849047 KNm
Mtc = w x R2(c sinf -f) = 0 KNm

AT f = 85.771 deg 1.497 AT SUPPORT :


MFf = w x R2( cosf -1) = -39.3279 KNm
Mtf = w x R2(c sinf -f) = -10.4617 KNm

DESIGN OF THE SECTION:


Me = M + T(1+h/b)/1.7 = 57.5221347 KNm
Me IS THE DESIGN MOMENT AT THE SUPPORT
EFFECTIVE DEPTH REQUIRED d = 329.75 mm
OVERALL DEPTH REQUIRED = 369.75 mm< 450 mm
AT MID SPAN :
Mu/(B*d2)= 0.3473 pt = 0.200 Ast = 188.6 sqmm
AT SUPPORT SECTION :
Mu/(B*d2)= 1.2666 pt = 0.374 Ast = 352.84 sqmm
DIA OF STEEL PROVIDED = 20 mm
PROVIDING 2 20 ST AT BOTTOM
2 20 ST + 1 20 EX AT TOP
CRITICAL SHEAR FORCE AT DISTACE d FROM SUPPORT V = w x ( Rq - d )
V= 32.57 KN.
Ve = V+1.6 T/b = 105.34 KN.
tv= 1.68 N/sq.mm Ast (pr)= 942.48 sqmm
tc= 0.64 N/sq.mm pt = 0.999 %
t e= t v-t c = 1.03 N/sq.mm b = 2.90
Vs = (tv - tc)*b*d 97.54 KN.

SPACING OF STIRRUPS Sv = 0.87 Fy Asv d / Vs = 152.56 mm


PROVIDING STIRRUPS OF 2 L - 8 @ 150 mm SPACING