Ref No.

: 2253/CCEED-AI/INA1/SHE/ARKM/VII/18 Date: 31th Dec2018


To:
PT ANEKA RAYA KONSTRUKSI MESINDO
Komplek Perkantoran PT. ACSET Indonesia, Tbk
Jl. Majapahit No.26, Petojo Selatan, Gambir,
Jakarta Pusat 10160

Attn: Mr. Frederick / Mr. Christian

Dear Sirs,

SUBJECT : PROPOSED INDONESIA 1 PROJECT, JAKARTA


NOTICE OF POTENTIAL SAFETY HAZARD

Hereof we, JO CCEED-ACSET, kindly inform you to install the edge protection railing, the detail
is as following:
1. The entrance of passenger hoist at the floor have no both side protection railing.
2. The construction void have no protection railing.
We consider you have to install those railing immediately, and hope you can finish this work in 4
days:

We trust all above is in order.

Yours sincerely,
JO. CCEED-ACSET
PROJECT INDONESIA 1

Philips Lou Wei


Project Director

Annex 1

JO CCEED-ACSET
ACSET BUILDING, JL. MAJAPAHIT NO.26, PETOJO SELATAN GAMBIR, JAKARTA PUSAT DKI JAKARTA
JO CCEED-ACSET
ACSET BUILDING, JL. MAJAPAHIT NO.26, PETOJO SELATAN GAMBIR, JAKARTA PUSAT DKI JAKARTA

You might also like