SATIP No.

APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
Galvanic Cathodic Protection SATIP-X-400-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Not Applicable

RECEIVING
2.0
INSPECTION

Storage, Handling, and Preservation SAIC-P-


2.1
Visual Inspection
SAIC-P-3002
3002 W S Weekly Inspection by Contractor QC

Material Receiving
SAIC-X- SA PID shall be notified on initial receipt of each listed
2.2 Exothermic Welding Tools & Materials SAIC-X-3001
3001 H W accessory (by type and/or manufacturer).
Visual Inspection

CP Accessories See GENERAL NOTES.


SAIC-X-
2.3 Material Receiving SAIC-X-3002
3002 H W SA PID shall be notified on initial receipt of each listed
Visual Inspection accessory (by type and/or manufacturer).

Material Receiving
SAIC-X- SA PID shall be notified on initial receipt of each anode
2.4 Galvanic Anodes for CP SAIC-X-3101
3101 H W type (by material and/or manufacturer).
Visual Inspection

Material Receiving
SAIC-X- SA PID shall be notified on initial receipt of each listed
2.5 CP Test Stations / Junction Boxes SAIC-X-3102
3102 H W accessory (by type and/or manufacturer).
Visual Inspection

3.0 INSTALLATION

Galvanic CP Anode Installation SAIC-X-


3.1
Visual Inspection
SAIC-X-3103
3103 H W Notify SA on start of installation for each anode.

Below Grade Exothermic Welding


SAIC-X-
3.2 (Prior to taping, coating, and backfilling) SAIC-X-3003
3003 H W Notify SA on start of installation for each anode.
Visual Inspection

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Galvanic Cathodic Protection SATIP-X-400-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

SAIC-X- SA PID shall be notified on start of this activity for each


3.3 CP Test Station Installation SAIC-X-3104
3104 H W process system, and plant area.

Raceway Installation See See SATIP-P-104-05 A/G Conduit


3.4
Visual Inspection Remarks Remarks H W SATIP-P-104-07 B/G Conduit

See SATIP-P-104-01 LV Cable


Below Grade CP Cable
SAIC-X- Hold points prior to backfilling of cable and safety
3.5 Pulling, Taping & Coating Installation SAIC-X-3105
3105 H W warning markers. SA PID shall be notified on start of
Visual Inspection
this activity for each process system, and plant area.

Above Grade CP Cable Pulling,


See SATIP-P-104-01 LV Cable
Cable Dressing, Cable Identification SAIC-X-
3.6
and Termination
SAIC-X-3105
3105 H W SA PID shall be notified on start of this activity for each
process system and plant area.
Visual Inspection

4.0 PRE-COMMISSIONING

Galvanic CP Anode Precommissioning SAIC-X-


4.1
Visual Inspection
SAIC-X-3103
3103 H W Notify SA on start of installation for each anode.

SAIC-X- SA PID shall be notified on start of this activity for each


4.2 CP Test Station Installation SAIC-X-3104
3104 H W process system, and plant area.

Galvanic CP Circuit SATR-X- SA PID shall be notified on start of this activity for each
4.3
Potential Testing
SATR-X-3101
3101 H W process system and plant area.

Galvanic CP Circuit See


4.4
Quality Document Review Remarks
EIL RH RH Review all associated Quality Records

Review FEIL and all associated Quality Records.


Galvanic CP Circuit PMCC Hold point for certification of mechanical completion of
4.5
Final Visual Inspection
FEIL
MCC H H each galvanic circuit. [After backfilling and final
grading of terrain.]

Saudi Aramco: Company General Use


SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Galvanic Cathodic Protection SATIP-X-400-01 14-May-18 Electrical
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1
adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.

Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.

Accessories include test stations, junction boxes, conductors, split bolts, mechanical fasteners, rubber tape, vinyl tape, crimp connectors, crimp tools, exothermic (thermite) welding materials,
5
exothermic welding molds & tools, conductive lubricating grease, and coatings (epoxy, aluminum alkyd, zinc chromate, and bituminous coatings, ID tags, and warning tape.
6 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)

Saudi Aramco: Company General Use


Rev. 2018.03.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14-May-2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018)

Saudi Aramco: Company General Use


Rev. 2018.03.00

###

Saudi Aramco: Company General Use


###

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use

You might also like