Catalogue Bitexco Group

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 76

THE ONE HCMC

THE MANOR PARK CITY


THE ONE HCMC
KHÁCH SẠN J.W. MARRIOTT
J.W. MARRIOTT HANOI HOTEL
OMA © All rights reserved
Bitexco Group currently Nho Que 3, Ho Ho, Dak Mi 4, Se San 3A, Binh Dien,
invested in 10 hydropower Eakrongrou. Among those of Bitexco independent
projects with the total development, Nho Que 3 project in the province of Ha
output of 700 megawatts Giang is the largest, with an output of 110 MW, and is
(MW). Despite facing many due to be in operation in 2011. This is considered the
difficulties and challenges vital project in the development of the Meo Vac district,
in Ha Giang.
during construction phase,
Bitexco's hydropower
projects are always
undertaken on schedule.
Currenty there are 6 projects
under operation:

Tập đoàn BITEXCO đã và đang tham gia đầu tư xây dựng 10 Thủy điện Nho Quế 3, Hố Hô, Đak Mi 4, Se San 3A,
nhà máy thủy điện trên khắp lãnh thổ Việt Nam, với tổng Bình Điền, Eakrongrou. Lớn nhất phải kể đến dự án
công suất khoảng 700MW và tổng kinh phí đầu tư lên đến 800 thủy điện Nho Quế 3 với công suất 110 MW. Đây là
triệu USD. Trong đó, hiện có 6 nhà máy thủy điện đã đi vào công trình trọng điểm của BITEXCO trên địa bàn
hoạt động là: đặc biệt khó khăn tại huyện Mèo Vạc tỉnh Hà Giang.

You might also like