From: ACONSPM
Sent: Monday, December 23, 2019 6:45 PM
To: Steve Zuo; Thinh, Nguyen Van
Cc: Ai, Chung Bac; ACONSPDPM; Nhy, Tran Thao; peterao@sgi-engineer.com;
yuyue@sgi-engineer.com; annk@sgi-engineer.com
Subject: Re: New capital CBD D01 drawings&reports
Dr. Ai Chung:
The following is the scope of work. Please read the scope of work and
prepare a draft content of the review report for D01 for me.
I also send the another C05 calculation to you. please create a etabs
model fisrt. Thanks. _Steve
Redarding your questions below, let us have a short meeting tomorrow and
we get it back to you during the meeting.
========================================================================
=======================================================
2
Review drilling plans provided by local geotechnical engineers as well as
geological research reports and basic designs, and provide review
comments.
For steel structures, review the dimensions of the primary and secondary
beams, columns, braces, and lateral force supporting frames of typical
steel structures, as well as the details of selected connections and
standard connections.
3
• provide information relevant to this review. Such as wind tunnel
report.
Dear Steve,
4
Please find the etabs model of CBD Tower D01 in the attachment. I have assigned the loads for the
model but there are some notes as the following.
If there is any information which is not suitable with the Egyptian code, especially the seismic load,
please help us to adjust them. We will check carefully all of information of the design in the next week.
Thanks,
Thinh
Dear Steve,
Please take a look the etabs model in the attachment. The geometry is done and the load assigns is in
progress. I will update the loads for the model tomorrow.
Thanks,
Thinh
5
<nhy.tran@acons.vn>
Subject: RE: New capital CBD D01 drawings&reports
Dear Steve,
We downloaded the files. Please find the story data and floor areas of the New capital CBD project in the
attachment.
The etabs model of the Tower will be sent to you soon.
Thanks,
please check whether you can still download the files or not. thanks. -Steve
6
左总:
本邮件为埃及新首都 CBD 项目 D01 的 FD 图纸,建筑结构两个专业,还包含地勘、计算书、风洞试验的报告
等内容,请您查收。