TEMPLATE SEVEN (7)-YEAR WP FOR GSC

Seven-Year Work Program for Geothermal Service Contract

Project Name:
Project Location:

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6


ACTIVITIES
1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q
PHASE 1: GEOSCIENTIFIC STUDIES
1 Reconnaissance Survey
Detailed Geological Survey and report
2 submission
Detailed Geochemical Survey and report
3 submission
Detailed Geophysical Survey and report
4 submission
5 Pre-Feasiblity Study
n Technical presentation

PHASE 2: TEST DRILLING PHASE


1 Pre-Drilling Preparation
2 Drilling Infrastructure Construction
3 Detailed Environmental Impact Studies
4 Confirmatory Drilling (slimhole/conventional)
5 Well testing and bore output measurements
5 Conceptual modelling
n Technical presentation
PHASE 3: DELINEATION AND DOC
1 Delineation Drilling (conventional)
2 Well testing and bore output measurements
3 Interference Testing
4 Grid System Impact Study
5 Feasiblity Study and Final EIA
6 Technical presentation
7 Financial Closure
8 Declaration of Commerciality

Prepared by: Approved by:

(Name and Designation) (Name and Designation)


ANNEX-I.2
ervice Contract

Year 6 Year 7 Financial Commitment (PhP)


4Q 1Q 2Q 3Q 4Q Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7

You might also like