As Stake Plan (Tubtub-Amas Road)
As Stake Plan (Tubtub-Amas Road)
As Stake Plan (Tubtub-Amas Road)
TUBTUB-AMAS ROAD
AS-STAKE PLAN
BROOKE'S POINT, PALAWAN
SUMMARY OF QUANTITIES
ITEM WORK DESCRIPTION AS PER PLAN QUANTITIES AS-STAKE QUANTITIES UNIT
PART C. EARTHWORKS
02
30
BASE MAP
05
30
V
V
V
V
06
30
V
07
30
08
30
09
30
10
30
11
30
12
30
13
30
14
30
15
30
16
30
17
30
18
30
19
30
20
30
21
30
22
30
23
30
24
30
GENERAL NOTES (ROADS)
PI
SYMBOLS AND ABBREVIATIONS
Lc
1.1. DIMENSIONS 1.7. DESIGN FEATURES ON PLANS
A. STATIONS ARE GIVEN IN KILOMETERS WITH OR WITHOUT DECIMALS. CENTERLINE
B. PIPE CULVERT DIAMETERS AND DIMENSIONS ARE GIVEN IN METERS. BENCK MARK / REF. POINT PC
PI PT
C. RADII AND ELEVATION, ETC. ARE GIVEN IN METERS WITH OR POINT OF TANGENCY
PC PT
PI
WITHOUT DECIMALS. POINT OF CURVATURE
PC PT
1.2. STATIONING
A. THE ROAD STATION AND ELEMENT OF CURVES ARE RELATIVE TO THE 1.8. DESIGN FEATURES ON PROFILE R
CENTERLINE OF THE ROAD R
B. ALL STATIONS ALONG THE ROAD CENTERLINE ARE RECKONED FROM POINT OF VERTICAL INTERSECTION, yv
STATION AND ELEVATION
PPNR
Lc g1
LENGTH OF VERTICAL CURVE
1.3. ELEVATIONS AND GRADES I -g2
25
30
PCCP CUT SECTION
1.50
4.50 4.50 MINIMUM
S2
S2
S2
S2
1.5 2.00% 2.00%
3.00% 3.00% :1
:1
1.5 LANE SHOWING TRANSVERSE
S2
3.05
CONSTRUCTION JOINT AT
1
:1 :1 :1 LOCATION OF WEAKENED PLANE JOINT
1 1
S2
S2
S2
LONGITUDINAL
CONSTRUCTION JOINT
S2
S2
S2 S2
S2
PCCP FILL SECTION
S2
S2
400 S1 S1 S1 S1 S1 400 400 S1 S1 S1 S1 S1 400
3.05
S2
LANE SHOWING TRANSVERSE
1.00 3.05 3.05 1.00 CONSTRUCTION JOINT AT
MIDDLE THIRD OF NORMAL
JOINT INTERVAL
1.5
1.5
:1 :1 EXPANSION JOINT @ EVERY 90.0M AND/OR EVERY ADJACENT EXISTING STRUCTURES
T/4
T/3
200mm
25mm PREMOLDED
300mm 300mm
EXPANSION FILLER 300mm 300mm HALF OF THE LENGTH SHALL BE 300mm 300mm
26
30
8.00
1.60 3.20 1.30 3.50
2.00 0.70
1.90
3.00
INSPECTOR / QUALITY
1.35
PERSONEL'S ROOM
1.10
ENGINEER'S ROOM
CURING
(PEO)
POND
6.00
1.50
T&B
3.00
LAB ROOM
(QUALITY CONTROL)
FIELD OFFICE /
CONFERENCE
1.50
1.60 3.20 4.80
CORR GALVALUME ROOFING 9.60
SAWALI WALLING
FLUSH DOOR
JALOUSIE DOOR W/
SECURITY GRILLS JALOUSIE DOOR W/
SAWALI WALLING
SECURITY GRILLS
APEX APEX
1.50
TOP OF GIRT
4.40
2.90
1.55
2.00
FFL
0.20
0.20
NGL
TOP OF GIRT
2.64
2.90
FFL
0.20
0.20
NGL
FIELD OFFICE
27
30
0.30
“ CONCRETE FOUNDATION
0.30
SIGN FACE, 3mm THK. ALUMINUM SHEET
EDGE OF CARRIAGEWAY
1.50
TOP OF PCCP SHOULDER P L A N
0.35
0.50
ELEVATION
0.05
YELLOW-GREEN BACKGROUND
BLACK BORDER
REFLECTORIZED
0
BLACK BORDER
0.6
0.6
0
WHITE BACKGROUND
0.75
0.65
0.75
0.05
0.60
4.00m
ROAD EDGELINE
0.30m
WARNING SIGN SCHEDULE 3.00m 6.00m 3.00m
0.30m
STATION ROAD SIGN CODE LOCATION DESCRIPTION
6.10m
ROAD CENTERLINE
0 + 098 W6-2 RIGHT CHILDREN WARNING SIGN
0 + 198 R6-9 RIGHT SCHOOL CHILDREN CROSSING
0 + 202 R6-9 LEFT SCHOOL CHILDREN CROSSING 150mm X 3.0m (CENTERLINE)
REFLECTORIZED TRAFFIC PAINT (WHITE)
0 + 302 W6-2 LEFT CHILDREN WARNING SIGN
0 + 551 W2-4B RIGHT JUNCTION
1 + 346 W2-4B RIGHT JUNCTION 300mm x 4.0m (PEDESTRIAN LANE) ROAD EDGELINE
REFLECTORIZED TRAFFIC PAINT (WHITE)
1 + 958 W6-2 RIGHT CHILDREN WARNING SIGN 100mm (EDGELINE)
REFLECTORIZED TRAFFIC PAINT (WHITE)
2 + 058 R6-9 RIGHT SCHOOL CHILDREN CROSSING
2 + 062 R6-9 LEFT SCHOOL CHILDREN CROSSING
2 + 162 W6-2 CHILDREN WARNING SIGN
LEFT
THERMOPLASTIC PAVEMENT MARKING
PEDESTRIAN MARKING SCHEDULE
STATION DESCRIPTION
0 + 200 M. TUNGGAL ELEMENTARY SCHOOL
2 + 060 MANGKONGON ELEMENTARY SCHOOL
0.15 12 mm dia.
PROPOSED EXTENSION
long bars
LENGTH = 1.5O M
0.20
H/4
12 mm dia.stiffener
hook @ 0.60m. O.C.
12 mm dia.RSB 12 mm dia.RSB
@ 0.25m. O.C. @ 0.25m. O.C. 12 mm dia.RSB
4 4 4 @ 0.30m. O.C.
H=1.50 MTRS. h
2
LENGTH = 5.0M
h/3
H/4 2"dia.PVC Weepholes
@ 0.50m. O.C.
0.30
50 mm thick
3 8 5 Lean Concrete 6 8 5 3 6 8 5 3
PROPOSED EXTENSION
T S T S T S T
LENGTH = 1.5O M
0.15 x 0.15
WHEEL GUARD
RSB PLAN
THREE BARREL BOX CULVERT
WATER LINE
CONCRETE APRON
0.30
1.52 1.48 3.00 3.00 3.00
DOWNSTREAM
BAR SCHEDULE
GENERAL PLAN
s/4 + 0.25 0.20
0.20
0.10 0.20
h = 0.50
h = 0.50
h = 0.50
(s/4 x 2) + t 0.20
TOP OF ROADWAY
BAR NO. 6
0.20
0.10 0.10 0.20
0.20
WINGWALL WINGWALL
0.30
0.30
0.50m
0.30m
0.50m
1.50 2.50 2.50 1.50
12 mm dia. Vert. & Hor. Bars
@ 0.30m O.C. bothways 12 mm dia. Vert. & Hor. Bars 0.30m 0.30m
@ 0.30m O.C. bothways
.3
t
0.30m
0.30
0.15
0.30 0.50M(L) X 0.30M (W)X 0.30M(H)
height
0.30
CONCRETE BLOCK @ 0.30M SPACING
50 mm thick 1.00
Lean Concrete 50 mm thick
1.50 Lean Concrete
0.30 1.50 0.40
SECTION
WINGWALL DET. HEADWALL DET.
29
30
1.60 CL
0.35 0.35
CL 1.60 m.
10 mm dia. RSB spaced
@ 0.30 Horizontal Bars 10 MMØ HOR. RSB @ 0.20
2"Ø 2"Ø 0.30M O.C
WEEP HOLES WEEP HOLES
WINGWALL
WINGWALL
2"Ø
0.50
WEEP HOLES 0.30
4
1.0
12 mm dia. RSB 0.30
60
@ 0.30m
B 1.00 0.15
0.60m. inlet
2"Ø
0.40
10 - 12 mm dia. WEEP HOLES
2"Ø
WEEP HOLES
Continuous Hor. Bar
0.15
10 mm dia. RSB TIES 12 mm dia. RSB @ 0.30m 0.20
@ 0.30m. O.C. NAT.GRD. LINE 0.60 1.60 m. 0.60
0.60
P L A N ELEVATION
10-12MMØ
10 MMØ VERT.RSB CONT. HOR. BARS
@ 0.30 O.C
0.30
ELEVATION P L A N
0.20 Top of Road way
1.00 1.00
12 mm dia. @
o.40 m min.
50mm diam. Drain Weepholes Spaced 0.30m. O.C. BW
@ 1.0m on center and staggered
12 mm dia. Vert. & Hor. Bars
@ 0.30m O.C. bothways
SLOPE: 1.90
Filter cloth tied at the inner end
-0.5%
of the Weepholes
0.90m dia.
1.00
SLOPE: -0.5%
1.00
0.15
0.30
1H
IV
3% SLOPE SHOULDER
0.15
5
0.1
0.6
ADDITIONAL WORK: LINE CANAL 200M ON BOTH SIDES ADDITIONAL WORK: RCPC 910MM DIAM X 9.0 LN.M. WITH
STA START: 1 + 365 FLARED HEADWALL ON BOTH SIDES
STA END: 1 + 565 STA. 0 + 480
30
30