Professional Documents
Culture Documents
ROAD DATA 18.11.2016 Uranipuram PDF
ROAD DATA 18.11.2016 Uranipuram PDF
I Emulsion / Bitumen
Rate exculding taxes
1 Bitumen Source: Manali
VG10 Rs. 27026.00 /MT
VG30 Rs. 27826.00 /MT
VG40 Rs. 28456.00 /MT
Lead to mid point of project road 367.00 Km
2 Emulsion Source: Irunkattukottai
Slow Setting Rs. 49290.00 /MT
Rapid Setting Rs. 30747.00 /MT
Lead to mid point of project road 337.00 Km
3 Lead to CMP
Metal Plain:55, Hills:0
Bitumen 345.00 Km
Labour Charges
Description Rate
Bitumen Sprayer Man 407.00
Bitumen Raker Man 424.00
Heat Master Operator 424.00
Mini Hot Mix Plant Operator 424.00
Gunnuting Plant Operator 355.00
Gunnuting Gun Operator 386.00
Road Mazdoor Gr.- I 350.00
Road Mazdoor Gr.-II 314.00
Head Mazdoor 361.00
Labour Charges
Description Rate
Carpenter - Ist Class 485.00 /Day
Carpenter - IInd Class 444.00 /Day
Fitter Ist Class (Pipe Laying/ Bar Bending) 431.00 /Day
Fitter II Class (Pipe Laying/ Bar Bending) 400.00 /Day
Mason I Class 496.00 /Day
Mason II Class 444.00 /Day
Mazdoor I Class 310.00 /Day
Mazdoor II Class 280.00 /Day
Head Mazdoor 321.00 /Day
Painter / Varnisher I Class 397.00 /Day
Painter / Varnisher II Class 369.00 /Day
Wodder 321.00 /Day
Description Rate
Clearing Heavy Jungle 4.05 /Sqm.
Clearing Light Jungle 3.05 /Sqm.
Clearing Scrub Jungle 2.80 /Sqm.
Earth Work Excavation SS 20A 59.20 /Cum.
Earth Work Excavation SS 20B 55.60 /Cum.
Earth Work Excavation SS 20B for Foundation 111.20 /Cum.
Refilling with excavated Sand 17.10 /Cum.
Refilling with excavated soil (other than Sand ) 19.50 /Cum.
Vibrator Charges for PCC rate per Cum. 34.80 /Cum.
Vibrator Charges for RCC rate per Cum. 46.80 /Cum.
Mixing Mortar Cement by Manual 57.60 /Cum.
Mixing Mortar Cement by Machine 76.50 /Cum.
Work Code : NABARD RIDF XXII Estimate Amount : Rs. 195.00 Lakhs
Abstract of Data
Rate
Sl No. Description Output Unit Total per
Hire Labour Material
unit
1 CLEARING HEAVY JUNGLE 1 /Sqm. 4.05
2 CLEARING LIGHT JUNGLE 1 /Sqm. 3.05
3 CLEARING SCRUB JUNGLE 1 /Sqm. 2.80
4 EARTH WORK EXCAVATION SS 20A 1 /Cum. 59.20
5 EARTH WORK EXCAVATION SS 20B 1 /Cum. 55.60
6 EARTH WORK EXCAVATION SS 20B FOR FOUNDATION 1 /Cum. 111.20
7 REFILLING WITH EXCAVATED SAND 1 /Cum. 17.10
8 REFILLING WITH EXCAVATED SOIL (OTHER THAN SAND ) 1 /Cum. 19.50
9 PICKING 1 /Sqm. 9.45
Plant mix works
10 GSB PLANT MIX (Grade V) 225 /Cum. 78595.52 3356.40 328600.62 1824.68
11 GSB PLANT MIX (Grade III) 225 /Cum. 78595.52 3356.40 346931.85 1906.15
12 WET MIX MACADAM 1 /Cum. 352.70 38.29 1533.40 1924.39
13 PRIME COAT OVER WBM / WMM SURFACE 10 Sqm /Sqm. 15.00 195.60 461.11 67.17
14 PRIME COAT OVER CRM SURFACE 10 Sqm /Sqm. 15.00 195.60 592.86 80.35
15 TACK COAT OVER PRIMED NON-BITUMINOUS GB 10 Sqm /Sqm. 15.00 18.84 101.85 13.57
16 TACK COAT OVER EXISTING BT SURFACE 10 Sqm /Sqm. 15.00 66.40 81.48 16.29
17 TACK COAT OVER DLC SURFACE 10 Sqm /Sqm. 15.00 18.84 122.22 15.61
18 DENSE BITUMINOUS MACADAM 50MM THICK USING CMP 10 Sqm /Cum. 819.44 190.83 2688.82 7398.18
19 DENSE BITUMINOUS MACADAM 75MM THICK USING CMP 10 Sqm /Cum. 1228.00 229.00 3726.18 6910.91
20 BITUMINOUS MACADAM 50MM THICK USING CMP 10 Sqm /Cum. 817.25 190.83 2107.76 6231.68
Work Code : NABARD RIDF XXII Estimate Amount : Rs. 195.00 Lakhs
Abstract of Data
Rate
Sl21
No. BITUMINOUS MACADAM 80MM THICK
Description
USING CMP Output Unit
10 Sqm /Cum. 1223.55 229.00 3638.31 6787.81
22 PREMIX CARPET WITH SEAL COAT TYPE - A 20MM THICK USING CMP 10 Sqm /Sqm. 354.26 114.50 1340.44 180.92
23 CLOSE GRADED PREMIX CARPET 20MM COMPACTED THICK 10 Sqm /Sqm. 413.28 91.60 932.85 143.77
23 BITUMINOUS CONCRETE 40MM THICK USING CMP 10 Sqm /Sqm. 650.88 190.83 2344.43 318.61
24 BITUMINOUS CONCRETE 30/ 40MM THICK USING CMP 1 /Cum. 7965.25
25 BITUMINOUS CONCRETE 50MM THICK USING CMP 1 /Cum. 7727.86
26 CRUSHER RUN MACADAM 300MM THICK 1 /Cum. 302.61 38.29 1496.18 1837.08
Mix in place works
27 PATCH WORK USING 45MM IRC METAL 1 /Cum. 230.00 2435.14 2665.14
28 PATCH WORK USING 13.20MM IRC METAL 1 /Cum. 230.00 2706.14 2936.14
29 WATER BOUND MACADAM GRADE-II 10 /Cum. 102.67 276.20
30 WATER BOUND MACADAM GRADE-III 10 /Cum. 102.67 276.20
31 PREMIX CARPET WITH SEAL COAT 10 /Sqm. 217.80 350.00
32 PREMIX CARPET 10 /Sqm. 184.83 262.50
33 GSB MIX IN PLACE 1 /Cum. 61.43 13.38
34 BITUMINOUS MACADAM 50MM THICK AT SITE (For Patch Work) 10 /Sqm. 417.98 386.00
35 DENSE BITUMINOUS MACADAM 50MM THICK 10 /Sqm. 450.33 386.00
36 DRY LEAN CEMENT CONCRETE FOR SUB-BASE (CC 1:4:8) 10 /Cum. 348.00 10234.20
Work Code : NABARD RIDF XXII Estimate Amount : Rs. 195.00 Lakhs
Abstract of Data
Sl No. Description Unit Rate
1 CLEARING HEAVY JUNGLE /Sqm. 4.05
2 CLEARING LIGHT JUNGLE /Sqm. 3.05
3 CLEARING SCRUB JUNGLE /Sqm. 2.80
4 EARTH WORK EXCAVATION SS 20A /Cum. 59.20
5 EARTH WORK EXCAVATION SS 20B /Cum. 55.60
6 EARTH WORK EXCAVATION SS 20B FOR FOUNDATION /Cum. 111.20
7 REFILLING WITH EXCAVATED SAND /Cum. 17.10
8 REFILLING WITH EXCAVATED SOIL (OTHER THAN SAND ) /Cum. 19.50
9 PICKING /Sqm. 9.45
10 GSB PLANT MIX (Grade V) /Cum. 1824.68
11 GSB PLANT MIX (Grade III) /Cum. 1906.15
12 WET MIX MACADAM /Cum. 1924.39
13 PRIME COAT OVER WBM / WMM SURFACE /Sqm. 67.17
14 PRIME COAT OVER CRM SURFACE /Sqm. 80.35
15 TACK COAT OVER PRIMED NON-BITUMINOUS GB /Sqm. 13.57
16 TACK COAT OVER EXISTING BT SURFACE /Sqm. 16.29
17 TACK COAT OVER DLC SURFACE /Sqm. 15.61
18 DENSE BITUMINOUS MACADAM 50MM THICK USING CMP /Cum. 7398.18
19 DENSE BITUMINOUS MACADAM 75MM THICK USING CMP /Cum. 6910.91
20 BITUMINOUS MACADAM 50MM THICK USING CMP /Cum. 6231.68
21 BITUMINOUS MACADAM 80MM THICK USING CMP /Cum. 6363.58
22 PREMIX CARPET WITH SEAL COAT TYPE - A 20MM THICK USING CMP /Sqm. 180.92
23 CLOSE GRADED PREMIX CARPET 20MM COMPACTED THICK /Sqm. 143.77
24 BITUMINOUS CONCRETE 30/ 40MM THICK USING CMP /Cum. 7965.35
25 BITUMINOUS CONCRETE 50MM THICK USING CMP /Cum. 7727.86
26 CRUSHER RUN MACADAM 300MM THICK /Cum. 1837.08
Work Code : NABARD RIDF XXII Estimate Amount : Rs. 195.00 Lakhs
Abstract of Data
Sl No. Description Unit Rate
km 0/0 - 1/0 km 1/0 - 2/0 km 2/0 - 3/0 km 3/0 - 4/0 km 4/0 - 5/0
27 PATCH WORK USING 45MM IRC METAL /Cum. 2665.14 2665.14 2665.14 2665.14 2665.14
28 PATCH WORK USING 13.20MM IRC METAL /Cum. 2936.14 2936.14 2936.14 2936.14 2936.14
29 WATER BOUND MACADAM GRADE-II /Cum. 1513.05 1425.64 1425.64 1425.64 1425.64
30 WATER BOUND MACADAM GRADE-III /Cum. 1812.52 1725.11 1725.11 1725.11 1725.11
31 PREMIX CARPET WITH SEAL COAT /Sqm. 177.44 177.44 177.44 177.44 177.44
32 PREMIX CARPET /Sqm. 125.21 125.21 125.21 125.21 125.21
33 GSB MIX IN PLACE /Cum. 1038.39 1038.39 1038.39 1038.39 1038.39
34 BITUMINOUS MACADAM 50MM THICK AT SITE (For Patch Work) /Cum. 5289.92 5289.92 5289.92 5289.92 5289.92
35 DENSE BITUMINOUS MACADAM 50MM THICK /Cum. 6349.50 6349.50 6349.50 6349.50 6349.50
36 DRY LEAN CEMENT CONCRETE FOR SUB-BASE (CC 1:4:8) /Cum. 2910.54 2910.54 2910.54 2910.54 2910.54
km 5/0 - 6/0 km 6/0 - 7/0 km 7/0 - 8/0 km 8/0 - 9/0 km 9/0 -10/0
27 PATCH WORK USING 45MM IRC METAL /Cum. 2665.14 2665.14 2665.14 2665.14 2665.14
28 PATCH WORK USING 13.20MM IRC METAL /Cum. 2936.14 2936.14 2936.14 2936.14 2936.14
29 WATER BOUND MACADAM GRADE-II /Cum. 1425.64 1425.64 1425.64 1425.64 1425.64
30 WATER BOUND MACADAM GRADE-III /Cum. 1725.11 1725.11 1725.11 1725.11 1725.11
31 PREMIX CARPET WITH SEAL COAT /Sqm. 177.44 177.44 177.44 177.44 177.44
32 PREMIX CARPET /Sqm. 125.21 125.21 125.21 125.21 125.21
33 GSB MIX IN PLACE /Cum. 1038.39 1038.39 1038.39 1038.39 1038.39
34 BITUMINOUS MACADAM 50MM THICK AT SITE (For Patch Work) /Cum. 5289.92 5289.92 5289.92 5289.92 5289.92
35 DENSE BITUMINOUS MACADAM 50MM THICK /Cum. 6349.50 6349.50 6349.50 6349.50 6349.50
36 DRY LEAN CEMENT CONCRETE FOR SUB-BASE (CC 1:4:8) /Cum. 2910.54 2910.54 2910.54 2910.54 2910.54
0.370 Cum Cost of 11.2, 6.70, 6, 5.6 & 4.75 mm IRC at Rs. 621.60 /cum. = 229.99
0.630 Cum Cost of 2.36mm IRC at Rs. 526.00 /cum. = 331.38
Rate of Metal For 13.20 mm to 2.36 mm IRC DBM (75mm thick) Rs. 561.37
No
HIRE CHARGES FOR MACHINERIES
1. CENTRAL HOT MIX PLANT
Hire charges excluding fuel charges per hour 9696 /8 =Rs. 1212.00
Fuel charges per Hour
For running the Plant :30 litres of diesel 54.86 /lit =Rs. 1645.80
For heating the bitumen 25 litres of furnace oil 27.36 /lit =Rs. 684.00
For heating the aggregates : 170 litres of furnace oil 27.36 /lit =Rs. 4651.20
Hire Charges including fuel charges per hour Rs. 8193.00
Out turn of CMP per Hour for BM = 135sqm. of 50 mm thick
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 320sqm. of 50 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 25.49
320
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 47.04
135
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 140.02
135
Total hire charges for machineries per 10 sqm = 606.89+ 25.49+ 47.04+ 140.02
= 819.44 /10sqm
LABOUR CHARGES PER 1200SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 11550.00
25.00 Nos Mazdoor IInd Class @Rs. 314.00 /each = 7850.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 3500.00
Total Labour Charges per 1200sqm = 22900.00
0.240 Cum Cost of 26.50 - 13.20mm IRC at Rs. 1478.39 /cum. = 354.81
0.250 Cum Cost of 13.20-2.36mm IRC at Rs. 965.48 /cum. = 241.37
0.230 Cum Cost of 2.36mm & below IRC at Rs. 912.90 /cum. = 209.97
0.000 Cum Cost of Stone Dust (Filling mat.) at Rs. 370.10 /cum. = 0.00
53.20 Kg Cost of VG30 Bitumen at Rs. 35388.50 /MT = 1882.67
10.00 Sqm Hire charges at Rs. 819.44 /10sqm = 819.44
10.00 Sqm Labour charges at Rs. 190.83 /10sqm = 190.83
Rate for 10 sqm =Rs. 3699.09
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 220sqm. of 75 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 37.08
220
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 90 sqm. of 75 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 70.56
90
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 210.03
90
Total hire charges for machineries per 10 sqm =910.33 37.08 70.56 210.03
= 1228.00 /10sqm
LABOUR CHARGES PER 1000SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 11550.00
25.00 Nos Mazdoor IInd Class @Rs. 314.00 /each = 7850.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 3500.00
Total Labour Charges per 1000sqm = 22900.00
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 350sqm. of 50 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 23.30
350
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 47.04
135
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 140.02
135
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 250sqm. of 80 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 32.63
250
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 90 sqm. of 80 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 70.56
90
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 210.03
90
3.VIBRATORY ROLLERS :
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per Hour Rs. 815.65
Out turn of Vibrator Roller per hour= 1000sqm. of 20 mm thick premix carpet
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 8.16
1000
Out turn of Vibratory Roller per Hr.SC = 500sqm
Hire Charges for Vibratory roller per 10sqm.for SC = 815.65 X 10 =Rs. 16.31
500
4. PAVER FINISHER
Hire charges excluding fuel charges per hour 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 325 sqm. of 20mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 19.54
325
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 58.16
325
Total hire charges for machineries per 10 sqm = 252.09 +24.47 +19.54 +58.16
= 354.26 /10sqm
LABOUR CHARGES PER 2000SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 11550.00
25.00 Nos Mazdoor IInd Class @Rs. 314.00 /each = 7850.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 3500.00
Total Labour Charges per 2000sqm = 22900.00
RATE PER SQM OF PREMIX CARPET WITH SEAL COAT 20MM THICK
Tipper
Hire charges excluding fuel charges per day =Rs. 1094.00
Fuel charges per day 3.25lit.of diesel x 8hrs 54.86 /lit =Rs. 1426.36
Total Hire charges per day including Fuel =Rs. 2520.36
Total Hire charges per Hour including Fuel =Rs. 315.05
Water Tankers
Hire charges excluding fuel charges per day =Rs. 855.00
Fuel charges per day 25lit.of diesel 54.86 /lit =Rs. 1371.50
Total Hire charges per day including Fuel =Rs. 2226.50
Total Hire charges per Hour including Fuel =Rs. 278.31
Vibratory Power Roller 8-10 tonne
Hire charges excluding fuel charges per day =Rs. 5428.00
Fuel charges per day 3.00lit.of diesel x 8hrs 54.86 /lit =Rs. 1316.64
Total Hire charges per day including Fuel =Rs. 6744.64
Total Hire charges per Hour including Fuel =Rs. 843.08
Motor Grader including fuel per Hour (Local Rate) =Rs. 1691.63
Base Mix Plant (pug mill) including fuel per hour (local rate) =Rs. 834.88
Total Hire Charges for machineries for 1.00 Cum of WMM =Rs. 352.70 /Cum.
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 20.39
400
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 37.36
170
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 111.19
170
Total hire charges for machineries per 10 sqm =481.94+ 20.39+ 37.36+ 111.19
= 650.88 /10sqm
LABOUR CHARGES PER 1200 SQM
For loading materials into CMP
33.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 11550.00
25.00 Nos Mazdoor IInd Class @Rs. 314.00 /each = 7850.00
For attending Paver Finisher
10.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 3500.00
Total Labour Charges per 1200sqm = 22900.00
3.VIBRATORY ROLLERS :
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per Hour Rs. 815.65
Out turn of Vibratory Roller per hour= 500sqm. of 25 mm thick
Hire Charges for Vibratory roller per 10sqm. = 815.65 X 10 =Rs. 16.31
500
4. PAVER FINISHER
Hire charges excluding fuel charges per hour 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per DAY Rs. 635.04
Out turn of Paver Finisher per hour = 270 sqm. of 25 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 23.52
270
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 70.01
270
Total hire charges for machineries per 10 sqm = 303.44 16.31 23.52 70.01
= 413.28 /10sqm
LABOUR CHARGES PER 2000SQM
For loading materials into CMP
26.40 Nos Mazdoor Ist Class @Rs. 350.00 /each = 9240.00
20.00 Nos Mazdoor IInd Class @Rs. 314.00 /each = 6280.00
For attending Paver Finisher
8.00 Nos Mazdoor Ist Class @Rs. 350.00 /each = 2800.00
Total Labour Charges per 2000sqm = 18320.00
0.0162 Cum Cost of 13.20mm -11.20mm Metal at Rs. 1186.90 /Cum. = 19.23
0.1404 Cum Cost of 11.20mm-5.6mm Metal at Rs. 980.90 /Cum. = 137.72
0.0729 Cum Cost of 5.60mm-2.80 Metal at Rs. 912.90 /Cum. = 66.55
0.0405 Cum Cost of 2.80mm and below Metal at Rs. 912.90 /Cum. = 36.97
19 Kg Cost of VG30 grade Bitumen at Rs. 35388.50 /MT = 672.38
10.00 Sqm Hire charges at Rs. 413.28 /10sqm = 413.28
10.00 Sqm Labour charges at Rs. 91.60 /10sqm = 91.60
Rate for 10 sqm =Rs. 1437.73
Tipper
Hire charges excluding fuel charges per day =Rs. 1094.00
Fuel charges per day 3.25lit.of diesel x 8hrs 54.86 /lit =Rs. 1426.36
Total Hire charges per day including Fuel =Rs. 2520.36
Total Hire charges per Hour including Fuel =Rs. 315.05
Water Tankers
Hire charges excluding fuel charges per day =Rs. 855.00
Fuel charges per day 25lit.of diesel 54.86 /lit =Rs. 1371.50
Total Hire charges per day including Fuel =Rs. 2226.50
Total Hire charges per Hour including Fuel =Rs. 278.31
Vibratory Power Roller 8-10 tonne
Hire charges excluding fuel charges per day =Rs. 5428.00
Fuel charges per day 3.00lit.of diesel x 8hrs 54.86 /lit =Rs. 1316.64
Total Hire charges per day including Fuel =Rs. 6744.64
Total Hire charges per Hour including Fuel =Rs. 843.08
Total Hire Charges for machineries for 1.00 Cum of CRM =Rs. 302.61 /Cum.
0.09 Cost of 53-45mm IRC (7%) 0.090 @Rs 1217.90 /cum 109.61
0.46 Cost of 45-22.40mm IRC (35%) 0.460 @Rs 1358.50 /cum 624.91
0.30 22.40-5.6mm IRC Metal (23%) 0.300 @Rs 1139.10 /cum 341.73
0.46 Cost of 900mm Micron and below (35%) 0.460 @Rs 912.90 /cum 419.93
1 Cum Hire & Labour charges 1 @Rs 340.90 /cum 340.90
Rate for 1.00 cum. Rs. 1837.08
Motor Grader including fuel / Hour (Local Rate) =Rs. 1691.63 /Hour
Wet Mix Plant 75 tonne capacity/ hr (Local Rate) =Rs. 1116.63 /Hour
Vibrator Roller
Hire charges excluding fuel charges per day =Rs. 5428.00
Fuel charges per day (Diesel) 2.50 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 1097.20
Total Hire charges per day including Fuel =Rs. 6525.20
Hire charges of Vibrator Roller per Hour 6525.20 / 8 =Rs. 815.65 /Hour
Tipper Trucks
Hire charges excluding fuel charges per Hour 1094.00 / 8 =Rs. 136.75
Fuel charges per day (Diesel) 3.25 lit/Hr x 54.86 /lit =Rs. 178.30
Total Hire charges per Hour including Fuel =Rs. 315.05 /Hour
Water Tanker
Hire charges excluding fuel charges per day =Rs. 855.00
Fuel charges per day (Diesel) 25.00 /Day 54.86 /lit =Rs. 1371.50
Total Hire charges per day including Fuel =Rs. 2226.50
Hire Charges for Water Tanker per Hour 2226.50 / 8 =Rs. 278.31 /Hour
Front end loader 5 cum capacity
Hire charges excluding fuel charges per day =Rs. 1205.00
Fuel charges per day (Diesel)10.00 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 4388.80
Total Hire charges per day including Fuel =Rs. 5593.80
Hire charges of Vibrator Roller per Hour 5593.80 / 8 =Rs. 699.23 /Hour
Rate Cost
Description Unit Quantity
Rs Rs
Granular Sub-Base with Close Graded Material
(Table:- 400-1)
A Plant Mix Method
Construction of granular sub-base by providing close
graded Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density, complete
as per clause 401
Unit = cum
Taking output = 225 cum (450 tonne)
a) Labour
Mate day 0.400 361.00 144.40
Mazdoor skilled day 2.000 350.00 700.00
Mazdoor day 8.000 314.00 2512.00
3356.40
b) Machinery
Wet Mix Plant 75 tonne capacity/ hr hour 6.000 1116.63 6699.78
Electric generator 125 KVA hour 6.000 647.38 3884.28
Water tanker 6 KL capacity 5 km lead with one hour 4.500 278.31 1252.40
trip per hour
Front end loader 1 cum bucket capacity hour 6.000 699.23 4195.38
Tipper 10 tonne; conveyance: 48 km tonne. 450 x L 2.00 43200.00
km
Add 10 per cent of cost of carriage to cover 4320.00
loading and unloading
Motor Grader 110 HP hour 6.000 1691.63 10149.78
Vibratory roller 8-10 t hour 6.000 815.65 4893.90
78595.52
c) Material
Close graded Granular sub-base Material as per table
400-1
For Grading-V Material (Drainage/ Top Layer)
Cost of 53mm to 9.50mm Broken Stone cum 144.000 1322.68 190465.92
Cost of 9.50mm to 2.36mm Broken Stone cum 100.000 953.70 95370.00
Cost of 2.36mm & Below of Sand cum 43.000 912.90 39254.70
Cost of water KL 27.000 130.00 3510.00
328600.62
OR
For Grading-III Material (Bottom Layer if
thickness more than 300mm)
46.5 mm to 26.50 mm cum 101.000 1291.65 130456.65
26.5 mm to 4.75 mm cum 130.000 1230.90 160017.00
4.75 mm below cum 58.000 912.90 52948.20
Cost of water KL 27.000 130.00 3510.00
346931.85
(i) Rate per cum for grading-V Material
Cost for 225 cum = a+b+c 410552.54
Rate per cum = (a+b+c)/225 Rs.1824.68/Cum.
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 0/0 - 1/0 Metal Quarry 1 at __ 1,0 63-45mm 634.81 Conveyance
8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at Adanakkottai 38,0 Gravel 169.50 282.04 3.05 454.59
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
km 1/0 - 2/0 Metal Quarry 1 at __ 1,0 63-45mm 634.81 8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 2/0 - 3/0 Metal Quarry 1 at __ 1,0 63-45mm 634.81 Conveyance
8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
km 3/0 - 4/0 Metal Quarry 1 at __ 1,0 63-45mm 634.81 8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 4/0 - 5/0 Metal Quarry 2 at __ 1,0 63-45mm 634.81 Conveyance
8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
km 5/0 - 6/0 Metal Quarry 2 at __ 1,0 63-45mm 634.81 8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 6/0 - 7/0 Metal Quarry 2 at __ 1,0 63-45mm 634.81 Conveyance
8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
km 7/0 - 8/0 Metal Quarry 2 at __ 1,0 63-45mm 634.81 8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 8/0 - 9/0 Metal Quarry 2 at __ 1,0 63-45mm 634.81 Conveyance
8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
km 9/0 -10/0 Metal Quarry 3 at __ 1,0 63-45mm 634.81 8.86 3.15 646.82
1,0 53-22.40mm 859.41 8.86 3.15 871.42
1,0 53 - 9.5mm(GSB-I) 935.78 8.86 944.64
1,0 9.50-2.36mm(GSB-I) 566.80 8.86 575.66
1,0 2.36mm & Below(GSB-I) 526.00 8.86 534.86
1,0 45 mm 908.00 8.86 3.15 920.01
1,0 26.50-13.20mm(BM) 1160.01 8.86 1168.87
1,0 13.20-2.36mm(BM) 580.49 8.86 589.35
1,0 2.36 & below(BM) 526.00 8.86 534.86
1,0 26.50-13.20mm(DBM) 1091.49 8.86 1100.35
1,0 13.20-2.36mm(DBM) 578.58 8.86 587.44
1,0 2.36 & below(DBM) 526.00 8.86 534.86
1,0 Stone Dust(DBM) 109.00 6.09 115.09
1,0 53-22.40mm(BUSG) 1042.31 8.86 1051.17
1,0 22.40-2.80mm(BUSG) 1010.96 8.86 1019.82
1,0 13.20mm 1179.00 8.86 3.15 1191.01
1,0 11.20mm 800.00 8.86 3.15 812.01
1,0 6.70mm 594.00 8.86 3.15 606.01
1,0 25 mm IS metal (DLC) 765.00 8.86 773.86
Gravel quarry at 1,0 Gravel 169.50 8.86 3.05 181.41
Sand quarry at __ 1,0 Sand 176.40 8.86 3.05 188.31
Conveyance of earth for embankment and berms
Plain
Lead Kind of Cost of Cost of Stacking
Reach in Km Quarry Total
in Km Materials material Charges
km 0/0 - 1/0 Earth quarry at __ 1,0 Carted Earth Conveyance
8.86 8.86
km 1/0 - 2/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 2/0 - 3/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 3/0 - 4/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 4/0 - 5/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 5/0 - 6/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 6/0 - 7/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 7/0 - 8/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 8/0 - 9/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
km 9/0 -10/0 Earth quarry at __ 1,0 Carted Earth 8.86 8.86
round 2
LEAD IN KM
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion
Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it,
including cost of material, labour charges, rentals for machinery, fuel and all other
incidental charges etc., complete as perClause 502 of MORTH Rev-5
Labour Charges per 500 sqm for preparation of surface
10.00 Nos Mazdoor Ist Grade @Rs 350.00 /each =Rs 3500.00
16.00 Nos Mazdoor IIst Grade @Rs 314.00 /each =Rs 5024.00
For Applying Primer
4.00 Nos Mazdoor IIst Grade @Rs 314.00 /each =Rs 1256.00
Total Labour Charges per 500 sqm =Rs 9780.00
7.00 Kgs Cost of Bitumen Emulsion - SS1 @Rs 65873.53 /MT =Rs 461.11
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 195.60 /10sqm =Rs 195.60
Rate for 10 sqm =Rs 671.71
9.00 Kgs Cost of Bitumen Emulsion (SS1) @Rs 65873.53 /MT =Rs 592.86
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 195.60 /10sqm =Rs 195.60
Rate for 10 sqm =Rs 803.46
Rate per 1.00 sqm =Rs 80.35 /sqm
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of
Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction
over it including cost of material, labour charges, rentals for machinery, fuel and all other
incidental charges etc., complete as perClause 503 of MORTH Rev-5
Labour Charges per 500 sqm
3.00 Nos Mazdoor IInd Grade(Applying TC)@Rs 314.00 /each =Rs 942.00
Total Labour Charges per 500 sqm =Rs 942.00
3.00 Kgs Cost of RS-I Bitumen emulsion @Rs 40741.53 /MT =Rs 122.22
10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 18.84 /10sqm =Rs 18.84
Rate for 10 sqm =Rs 156.06
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen
Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it
including cost of material, labour charges, rentals for machinery, fuel and all other
incidental charges etc., complete as perClause 503 of MORTH Rev-5
2.00 Kgs Cost of RS-I Bitumen emulsion @Rs 40741.53 /MT =Rs 81.48
10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
10.00 sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 sqm Labour Charges @Rs 66.40 /10sqm =Rs 66.40
Rate for 10 sqm =Rs 162.88
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using
2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous
construction over it including cost of material, labour charges, rentals for machinery,
fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Labour Charges per 500 sqm
3.00 Nos Mazdoor IInd Grade(Applying TC)@Rs 314.00 /each =Rs 942.00
Total Labour Charges per 500 sqm =Rs 942.00
2.50 Kgs Cost of RS-I Bitumen emulsion @Rs 40741.53 /MT =Rs 101.85
10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
10.00 Sqm Hire for Bitumen Sprayer @Rs 15.00 /10sqm =Rs 15.00
10.00 Sqm Labour Charges @Rs 18.84 /10sqm =Rs 18.84
Rate for 10 sqm =Rs 135.69
2. Removing the Picked up stuff Mazdoor Ist 1.08x1/8x 350.00 /No - 47.25
4. Spreading the Bitumen for Tack Coat excluding cost of Bitumen -L.S.- - 3.10
5. Premixing the chips with hot Bitumen in the drum mixer and laying
0.625 cum of metal with 44 kg per cum of chips excluding the cost of the
bitumen - - L. S. - - - 15.75
6. Levelling and tamping the premix in the patches and pot holes rolling etc- 4.73
Hire charges of Power Roller per 10 sqm. 1925.20 x 10 =Rs. 42.78 /10sqm
450
Water Sprinklers
Hire charges excluding fuel charges per day =Rs. 1159.00
Fuel charges per day (Diesel) 3.50 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 1536.08
Total Hire charges per day including Fuel =Rs. 2695.08
Daily Out turn 450 sqm of 75mm
Hire charges of Water Sprinklers per 10 sqm. 2695.08 x 10 =Rs. 59.89 /10sqm
450
Total Hire charges for Machineries per10sqm = 42.78 + 59.89 =Rs. 102.67 /10sqm
c.Maintaining berms for traffic barricading, providing danger linghts etc., L.S =Rs 1.50
d. Watering and keeping the surface moist for 15 days when water is =Rs 1.50
available within 200m L.S
e. Rent for tools including basket sharpening Pick-axes etc. L.S =Rs 1.50
Total Hire and Labour charges per 10sqm = 102.67 + 276.20 =Rs 378.87 /10sqm
of 75mm thick
Total Hire and Labour charges = 217.80 + 350.00 =Rs. 567.80 /10sqm
Hire charges of Vibrator Roller per Hour 6525.20 / 8 =Rs. 815.65 /Hour
Tractor + Rotovator
Hire charges for Tractor-Rotovator including fuel per hour 353.00
Water Tanker
Hire charges excluding fuel charges per day =Rs. 2005.00
Fuel charges per day (Diesel) 25.00 /Day 54.86 /lit =Rs. 1371.50
Total Hire charges per day including Fuel =Rs. 3376.50
Hire Charges for Water Tanker per Hour 3376.50 / 8 =Rs. 422.06 /Hour
Hire and Fuel charges for Machineries for 300 cum of GSB Grade - I
Total Hire and Labour Charges for 300 Cum of GSB Grade-I = Rs.22441.14 /300Cum.
Total Hire and Labour Charges per Cum of GSB Grade-I = Rs.74.80 /Cum.
Total Hire Charges for Machineries per 10 sqm =Rs. 184.83 /10sqm
Total Hire and Labour charges = 184.83 + 262.50 =Rs. 447.33 /10sqm
Labour charges for BM 50mm thick per 10 sqm. 46320.00 x 10 =Rs. 386.00 /10sqm
1200
Total Hire and Labour charges = 417.98 + 386.00 =Rs. 803.98 /10sqm
Total Hire Charges for Machineries per 10 sqm =Rs. 450.33 /10sqm
Labour charges for DBM 50mm thick per 10 sqm. 46320.00 x 10 =Rs. 386.00 /10sqm
1200
Total Hire and Labour charges = 450.33 + 386.00 =Rs. 836.33 /10sqm
Hire charges of Power Roller per 10 sqm. 1925.20 =Rs. 4.53 /Cum
425
Water Sprinklers
Hire charges excluding fuel charges per day =Rs. 1159.00
Fuel charges per day (Diesel) 3.25 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 1426.36
Total Hire charges per day including Fuel =Rs. 2585.36
Daily Out turn 1000 Cum.
Hire charges of Water Sprinklers per 10 sqm. 2585.36 =Rs. 2.59 /Cum
1000
Total Hire charges for Machineries per10sqm = 4.53 + 2.59 =Rs. 7.12 /Cum
Total Labour charges for laying gravel per Cum 700.00 =Rs. 7 /Cum
100
Total Hire and Labour charges = 7.12 + 7.00 =Rs. 14.12 /Cum
km 0/0 - 1/0
1.00 Cum. Cost of 45mm IRC at Rs. 920.01 /cum. = 920.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2665.14
km 1/0 - 2/0 21
1.00 Cum. Cost of 45mm IRC at Rs. 920.01 /cum. = 920.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2665.14
km 2/0 - 3/0 42
1.00 Cum. Cost of 45mm IRC at Rs. 920.01 /cum. = 920.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2665.14
km 3/0 - 4/0 63
1.00 Cum. Cost of 45mm IRC at Rs. 920.01 /cum. = 920.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2665.14
km 4/0 - 5/0 84
1.00 Cum. Cost of 45mm IRC at Rs. 920.01 /cum. = 920.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2665.14
km 0/0 - 1/0
1.00 Cum. Cost of 13.20 mm IRC at Rs. 1191.01 /cum. = 1191.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2936.14
km 1/0 - 2/0 21
1.00 Cum. Cost of 13.20 mm IRC at Rs. 1191.01 /cum. = 1191.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2936.14
km 2/0 - 3/0 42
1.00 Cum. Cost of 13.20 mm IRC at Rs. 1191.01 /cum. = 1191.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2936.14
km 3/0 - 4/0 63
1.00 Cum. Cost of 13.20 mm IRC at Rs. 1191.01 /cum. = 1191.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2936.14
km 4/0 - 5/0 84
1.00 Cum. Cost of 13.20 mm IRC at Rs. 1191.01 /cum. = 1191.01
44 Kg Cost of VG10 Bitumen at Rs. 34434.86 /MT = 1515.13
1.00 Cum. Labour charges at Rs. 230.00 /cum. = 230.00
Rate for 1.00 cum. Rs. 2936.14
3.VIBRATOR ROLLERS
Hire charges excluding fuel charges per Hour 5428/8 =Rs. 678.50
Fuel charges per day 2.50 litres x 54.86 /lit =Rs. 137.15
Hire Charges including fuel charges per hour Rs. 815.65
Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick
Hire Charges for Vibrator roller per 10sqm. = 815.65 X 10 =Rs. 20.39
400.00
4.PAVER FINISHER
Hire charges excluding fuel charges per day 2447.00 /8 =Rs. 305.88
Fuel charges per hour 6 litres per hour X 54.86 /lit =Rs. 329.16
Hire Charges including fuel charges per hour Rs. 635.04
Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick
Hire Charges for paver finisher per 10sqm. = 635.04 X 10 =Rs. 37.36
170.00
Hire Charges for Tipper per 10sqm. = 315.05 x6x10 =Rs. 111.19
170.00
0.220 Cum Cost of 26.5 - 13.20mm IRC at Rs. 1549.02 /cum. = 340.78
0.240 Cum Cost of 13.20 - 2.36mm IRC at Rs. 982.69 /cum. = 235.85
0.260 Cum Cost of 2.36 mm and below at Rs. 912.90 /cum. = 237.35
62.40 Kg Cost of VG30 Bitumen at Rs. 35388.50 /MT = 2208.24
10.00 Sqm Hire charges at Rs. 650.88 /10sqm = 650.88
10.00 Sqm Labour charges at Rs. 190.83 /10sqm = 190.83
Rate for 10 sqm =Rs. 3863.93
Hire charges of Power Roller per 10 sqm. 1925.20 =Rs. 4.53 /Cum
425
Water Sprinklers
Hire charges excluding fuel charges per day =Rs. 1159.00
Fuel charges per day (Diesel) 3.25 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 1426.36
Total Hire charges per day including Fuel =Rs. 2585.36
Daily Out turn 1000 Cum.
Hire charges of Water Sprinklers per 10 sqm. 2585.36 =Rs. 2.59 /Cum
1000
Total Hire charges for Machineries per10sqm = 4.53 + 2.59 =Rs. 7.12 /Cum
Labour charges for Laying Earth for 100cum
Total Labour charges for laying earth per Cum 700.00 =Rs. 7 /Cum
100
Total Hire and Labour charges = 7.12 + 7.00 =Rs. 14.12 /Cum
Cost of Earth (as per GO 214, Industries (MMC.2) =Rs. 70.00 /Cum
Department dated 03.11.2015)
Excavation Charges as per PWD rates (SS 20 B) =Rs. 55.60 /Cum
Seigniorage fee per cum ( GO (Ms) No. 6, Industries =Rs. 20.00 /Cum
(MMB1) Department dated 11.1.2001)
Cost of earth per cum at quarrying place =Rs. 145.60 /Cum
Hire charges of Power Roller per 10 sqm. 1925.20 =Rs. 4.53 /Cum
425
Water Sprinklers
Hire charges excluding fuel charges per day =Rs. 1159.00
Fuel charges per day (Diesel) 3.25 lit/Hr x 8.00 Hrs. x 54.86 /lit =Rs. 1426.36
Total Hire charges per day including Fuel =Rs. 2585.36
Daily Out turn 1000 Cum.
Hire charges of Water Sprinklers per 10 sqm. 2585.36 =Rs. 2.59 /Cum
1000
Total Hire charges for Machineries per10sqm = 4.53 + 2.59 =Rs. 7.12 /Cum
Labour charges for Laying Earth for 100cum
Total Labour charges for laying earth per Cum 700.00 =Rs. 7 /Cum
100
Total Hire and Labour charges = 7.12 + 7.00 =Rs. 14.12 /Cum
km 0/0 - 1/0 0
1.16 Cum. Cost of Gravel at Rs. 454.59 /cum. = 527.32
1.00 Cum. Hire and Labour chargesat Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 541.44
km 1/0 - 2/0 21
1.16 Cum. Cost of Gravel at Rs. 181.41 /cum. = 210.44
1.00 Cum. Hire and Labour chargesat Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 224.56
km 2/0 - 3/0 42
1.16 Cum. Cost of Gravel at Rs. 181.41 /cum. = 210.44
1.00 Cum. Hire and Labour chargesat Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 224.56
km 3/0 - 4/0 63
1.16 Cum. Cost of Gravel at Rs. 181.41 /cum. = 210.44
1.00 Cum. Hire and Labour chargesat Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 224.56
km 4/0 - 5/0 84
1.16 Cum. Cost of Gravel at Rs. 181.41 /cum. = 210.44
1.00 Cum. Hire and Labour chargesat Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 224.56
km 1/0 - 2/0 21
1.16 Cum. Cost of Earth at Rs. 145.60 /cum. = 168.90
1.16 Cum. Cost of conveyance at Rs. 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges at Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 193.30
km 2/0 - 3/0 42
1.16 Cum. Cost of Earth at Rs. 145.60 /cum. = 168.90
1.16 Cum. Cost of conveyance at Rs. 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges at Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 193.30
km 3/0 - 4/0 63
1.16 Cum. Cost of Earth at Rs. 145.60 /cum. = 168.90
1.16 Cum. Cost of conveyance at Rs. 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges at Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 193.30
km 4/0 - 5/0 84
1.16 Cum. Cost of Earth at Rs. 145.60 /cum. = 168.90
1.16 Cum. Cost of conveyance at Rs. 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges at Rs. 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 193.30
km 0/0 - 1/0 0
1.16 Cum. Earthwork as per SS20B 55.60 /cum. = 64.50
1.16 Cum. Cost of conveyance 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 88.90
km 1/0 - 2/0 21
1.16 Cum. Earthwork as per SS20B 55.60 /cum. = 64.50
1.16 Cum. Cost of conveyance 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 88.90
km 2/0 - 3/0 42
1.16 Cum. Earthwork as per SS20B 55.60 /cum. = 64.50
1.16 Cum. Cost of conveyance 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 88.90
km 3/0 - 4/0 63
1.16 Cum. Earthwork as per SS20B 55.60 /cum. = 64.50
1.16 Cum. Cost of conveyance 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 88.90
km 4/0 - 5/0 84
1.16 Cum. Earthwork as per SS20B 55.60 /cum. = 64.50
1.16 Cum. Cost of conveyance 8.86 /cum. = 10.28
1.00 Cum. Hire and Labour charges 14.12 /cum. = 14.12
Rate for 1.00 cum. Rs. 88.90
Cost of Steel
As PWD rates = 41500.00
Deduct Loading/ Unloading = -176.80
= 41323.20
Rate + VAT (5 %) = 41323.20
Rate = 41323.2x100/105
0.00 = 39355.43
Deduct Central Excise Duty for Steel = 12.50%
Basic rate of steel = 39355.43x100/112.50
34982.60
Add Storage (5%) = 1749.13
Total Cost of Steel = 43249.13
Picking 5cm to 10cm old metalled surface and sectioning 1Cum. = 9.45 /Sqm.