Method Statement For Decksheet Laying PDF
Method Statement For Decksheet Laying PDF
1. SC
COPE OF WO
ORK
2. PU
URPOSE
3. REESOURCES
4. SEEQUENCE / M
METHOD OFF WORK
5. QU
UALITY ASSU
URANCE
6. HEEALTH AND SSAFETY
7. EM
MERGENCY C
CONTACT NU
UMBERS
Page 1
P
1. SC
COPE OF WO
ORK
Th
he Scope of tthis method statement ccovers Laying & Fixing of Metal Deck Work for SSands
Inffra build Privvate Limited
d at Kochi, Keerala.
2. PU
URPOSE
Th
he purpose o
of this metho
od statemen
nt is to set ou
ut the proceedures to be implementeed by
project metho
odology to carry
c out thee deck sheeeting activities in a prop
per sequencce for
Strructural stee
el erection w
works.
3. REESOURCES
Th
he following resources (b
but not limitted to) shall be used
3.1 M
Materials
Deck Sheets
Stud
Edge trim , Closure
Fasteners ‐SScrew
3.2 M
Man power
S.No. Tools
s & Tackles
s
2 Arc/Manua
al Welding M
Machine
3 Sprit level
4 Measuring Tape
5 Hammers
6 U Clamp
7 Fire Exting
guishers
8 Total Statio
on with acce
essories
10 AG 7 Grind
ding Machine
11 Deck shee
et Screwing m
machine
4. SEEQUENCE / M
METHOD OFF WORK
4.1 Siite Planning & Preparation
4.1.1 Material Reeceipts &Sto orage facilities:
The levelled lay down n area for sto
orage / asseembly of matterials shall b be provided by client as
per the aagreed locatiions. The tem mporary lay down area shall be barrricaded and fenced
around w with signage for stackingg the materiaals. Limited materials on nly shall be kkept on the
floor whe ere the conccrete column ns and beam ms located.
All
A deck sheeets & materrials on receeipt at site by trailers sshall be unloaded at th
he
designated loocation or att the erection location byy tower cran ne or hydra.
Materials
M shaall be prope
erly identifieed and stackked on woo oden planks clear off thhe
ground. Stackking shall faccilitate easy identificatioon and inspeection.
P
Page 3
4.1.2 Th
he sequence
e of installation of metal deck shall be followed
d as given be
elow:
Description of Activity
1 Unlo
oading and storing of deck sheets.
2 Liftin
ng and positioning of deck sheets on
n floor beam
ms
3 Instaallation or laying of deckking
4 Fixin
ng of deckingg by screws
5 Fixin
ng of edge trims / Closurre angles
5 Deckk stud weldin
ng
6 Testing of weldeed shear stud
ds.
7 Inspeection &Han
nd over to Co
oncrete worrks
4.1.3 Saafety Pre‐cau
utionary Me
ethod
2. D
During first flloor deck insstallation gro
ound level n
need to be b
barricaded 3M away from
th
he deck slab boundary, aand any unaauthorized entry shall bee restricted bby a watcherr.
3. Cutout openings will be cclosed by cattch net or m
metal planks.
4.1.4 Se
equence of M
Metal deck installation
1. U
Upon inspection and co ompletion o
of bolting and
a alignmeent of floorr beams, th
he
reespective meetal deck sheet bundles shall be placed over thee beams.
2. The sheet bu
undles shall be opened and the deck sheets sh
hall be placeed adjacenttly
one after anoother by rigggers manually.
3. Deck sheet sh
D hall be spreaad as per thee approved d
drawing and
d sequence.
4. U
Upon placingg the sheets, the sheets shall be screewed to fix tthe sheets firmly over th
he
stteel beams.
P
Page 4
sh
heets, as sho
own in the d
drawings.
7. U
Upon compleetion of stud d welding on n the floor / bay, the sam me shall be inspected an
nd
handed overr to the further activitiies (fixing of
o reinforcem
ment mesh & casting of
o
co
oncrete slab
b by others).
4.1.5 Brrief Descripttion of proce
edure for Me
etal Deckingg installation
n
1. M
Metal deck sh o bundles and the sheets
hall be delivvered to site normally ass packed into
are secured w
with metal sttraps.
3. Visual inspect
V tions shall be carried ou
ut for any damage.
4. The bundle sh
hall be lifted
d from the trrailer using ttower craness or hydra.
6. D
Decking bund
dles shall be
b stored an
nd placed in
n the allocaated area on the timbeer
packers.
7. The bundles shall be plaaced on, beaarers which provide a ggentle slope to allow an
ny
co
ondensationn or rain to d drain and freee flow of airr around thee bundle.
8. The bundles shall not be stored morre than 4 higgh (1.2m maax) and no o
other material
sh
hall be place
ed over them
m.
9. The identificaation tags sh
hall be used tto ensure po
ositioning th
he bundles on frame.
11. Prior to the lifting of bun
ndles, span o
orientation p
positions shall be checkked as per th
he
drawings.
12. The bundles sshall be opened only wh
hen all sheetts can be possitioned and
d secured.
13. The sheet layying shall be carried out grid by grid,, as per the cconstruction
n sequence.
15. Decking shee
D ets must be ffixed to the top of the ssteel beams.. All fixings sshall be mad
de
th
hrough the ttroughs in th
he decking as given the ddrawings.
P
Page 5
16. The surface o of the beamss, where decck sheets arre to be placced, shall be ensured thaat
it is free from
m water, dirt,, debris etc.
20. Once layout
O and fixing ensured thorroughly, stud d welding sh
hall be carrieed out as peer
th
he sequencee. The area u underneath the stud we elding workss shall be baarricaded an
nd
any unauthorrized entry sshall be restrricted by a w
watcher.
21. In
nspection sh
hall be carrieed out for pro
oper welding of shear sttuds, as per the ITP.
22. Bend tests sh
hall be carrieed out rando
omly, as per tthe approveed ITP.
23. After comple
A tion of inspeection, the aarea shall be handed oveer to the clieent for furtheer
sllab concretin
ng.
4.1.6 Stud Welding
2. Ceramic ferruules shall be placed on b
bottom of the studs whille welding w
with stud gun
ns
to
o serve as sh
hield to the aarc.
3. After comple
A tion of stud welding, thee ferrules sh
hall be brokeen free and ccleaned.
4. M
Manual fillet welding shaall be carrieed out at the e locations w
where stud machine gu un
does not reacch or not po ossible to weeld by stud ggun. When m manual weld ding is carrieed
out, it shall b
be ensured that the stud d is directly w
welded to thhe supportin ng beams an nd
of equivalentt to the we
eld thicknesss of machine welding (Fillet size –as per ouur
reequirement)).
4.1.7 To
ouch‐up Pain
nt Procedure
e
The P
Primer touch
h up work sh
hall be carrieed out on the connections locationss, Welded an
nd
damaaged areas.
a) The approved d primer only shall be ussed for touch
h up work.
b) The surfaces must be cleean and dry.. Using mechanical cleaning methods, dirt, dusst,
oil and all oth
her contaminnations shall be removed prior to appply the prim
mer.
c) The primer w will be handle
ed generallyy in accordannce with Maanufacturer’s instruction
ns
P
Page 6
and project specification.
d) Primer shall b
be applied bby brush / rooller and mu
ultiple coats shall be applied in ordeer
to
o achieve the required DDFT microns.
e) In ed out as peer approved ITP.
nspections shall be carrie
5. QU UALITY ASSU
URANCE
he Quality Assurances enccompass of ffollowing.
Th
1. ITP Shall be followedd and coorddinated accordingly witth the Engiineers site
activities.
2. Execution of work shall be don ne as per latest “Issu
ued for Con
nstruction”
drawings aand Specificaations.
3. Ensure materials shaall be used d as per approved Material and Approval
Submittalss
4. Work Inspection Request forms (W WIR) will be raised and aapproval from m client.
5. Conduct trraining to en ngineers andd workers for the awaren ness of proje
ect related
quality and d process on
n each activitty.
6. Daily pep ttalk for weldding supervissors.
6. HEEALTH AND SSAFETY
6.1 HSSE General P
Precautions & General M
Mitigation M
Measures/Co
ontrols
P
Page 7
7. EMERGENCY CONTACT N
NUMBERS
Sl.No Category N
Name Contact Name
1 Project Maanager Mr.Paramaaguru 7899130006
2 Safety Offiicer North To
ower Mr.Veereshh 8618235197
3 Safety Offiicer South To
ower Mr.Alex Thangaraj 9894917455
4 Lifting Sup
pervisor Northh Tower Mr. Gunaseekaran 9751965608
5 Lifting Sup
pervisor Southh Tower Mr. Binu Th
hankachan 9037124998
6 Fire Service Kerala 1011
7 Ambulance e Service Kerala 1088
7 Police servvice Kerala 1000
P
Page 8