Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1 2 2.

8
1 2 2.8 1 2 2.8

20'-0 16'-0 20'-0 16'-0 20'-0 16'-0

2'-10

N
2'-10

M
2'-10
N
M

LU
C.18 C.18

LU

CO
C.18 C.18 C.18 C.18

CO

G
B3 - W18X46

IN
NG
C C B3 - W18X46

T
3

TI

IS
C C
X3 C C

IS

EX
10 B5 - W12X26 B5 - W12X26

EX
4'-10

4'-10
-W

4'-10
N

W14X26

W14X26
M
C7

LU
B.8 B.8 B12 - W12X14 B12 - W12X14

CO
B.8 B.8 B.8 B.8

G
T IN
IS

EXISTING BEAM -
33

EXISTING BEAM -
EX
X
10

N
11'-10

B2 - W18X46

B2 - W18X46
M
-W

X3
11'-10
LU

11'-10
10
N
C8

CO
M

-W
LU

N
NG

M
CO

C7

LU
TI
IS

CO
G
IN

EX
ST

N G
B.4 B.4 B4 - W12X19 XI B4 - W12X19

TI
B.4 E B.4 B.4 B.4

IS
EX
W14X26

W14X26
12'-0

12'-0

12'-0
54'-0

54'-0

54'-0
EXISTING BEAM -

EXISTING BEAM -
N
M
LU
B B B10 - W12X19 B10 - W12X19
CO
B B B B
2'-4 2'-6

NG

N
2'-4 2'-6

2'-4 2'-6
M
TI

A.9 A.9

LU
N

IS

A.9 A.9 A.9 A.9


M

CO

N
EX
LU

M
EXISTING BEAM - W14X26

LU
A.8 A.8

G
EXISTING BEAM - W14X26
CO

IN
A.8 A.8

CO
A.8 A.8

ST
NG

G
I
EX
TI

N
IS
7'-0

TI
EX

IS
7'-0

7'-0

EX
N
M
LU
A.4 A.4

N
A.4 A.4

CO

M
A.4 A.4

LU
G

CO
IN
ST

G
IN
I
EX
10'-8

ST
10'-8

10'-8

I
EX

N
N

UM
N

N
M
N

M
M

LU
M

L
LU

LU
LU

LU

CO
CO

CO

CO
CO

CO

NG
NG
A A

G
G

TI
N

N
A A

I
IN

A A
IN

ST

IS
TI

TI
T

IS

IS

EX
I
IS

IS

EX

EX

EX
EX

EX

1 2 2.8 1 2 2.8
1 2 2.8
PLAN AT EL. 2ND PLAN AT EL. 4TH
ESC: 1:86 PLAN AT EL. 3RD
ESC: 1:86 ESC: 1:86

1 2 2.8 3
1 2 2.8
1 2 2.8

20'-0 16'-0
36'-0
B3 - W18X46

N
2'-10

UM

2'-10
L

20'-0 16'-0

2'-10
CO

C.18 C.18 20'-0 16'-0


C.18 C.18
NG

C.18 C.18
TI
IS

C C
EX

B5 - W12X26 C C
C C
4'-10

W14X26

4'-10

4'-10
B12 - W12X14
B.8 B.8
B.8 B.8
B.8 B.8
EXISTING BEAM -
3
X3
B2 - W18X46

10
11'-10

-W

11'-10
N

11'-10
C9

M
LU
CO
NG
TI

B4 - W12X19
IS

B.4 B.4
EX

B.4 B.4
B.4 B.4
W16X40
12'-0

12'-0
54'-0

12'-0
EXISTING BEAM -

54'-0

N
M

54'-0
LU

N
CO

M
LU

B11 - W12X19
NG

CO

3
B B
TI

X3
IS

B B
2'-4 2'-6

NG

10
EX

B B
2'-4 2'-6

N
-W
TI

M
A.9 A.9

2'-4 2'-6
IS

C6

LU
A.9 A.9
EX

CO
EXISTING BEAM - W14X26 A.9 A.9
A.8 A.8 B6 - W12X26

NG
A.8 A.8 B6 - W12X26

TI
A.8 A.8

IS
EX
7'-0

W14X26
X3

7'-0

W14X26
10

7'-0
B8 - W12X14
N
-W

UM

B8 - W12X14
L
C5

A.4 A.4
CO

A.4 A.4
G

EXISTING BEAM -

A.4 A.4
IN

B1 - W12X26
ST

EXISTING BEAM -
B1 - W12X26
I
EX
10'-8

10'-8
N
33

UM

10'-8
X
10

L
CO
-W

G
C2

N
TI

N
M
A A B7 - W12X26
IS

LU
EX

A A B7 - W12X26

CO
A A

G
IN
ST
N

REV DESCRIPTION DATE


M

I
EX
LU
3

CO

The One Steel Group


3
X3

X3
10

NG

10
-W

-W
TI
IS
C2

C3
EX

1 2 2.8 3
SECOND TO SEVENTH FLOOR
Tekla structures

DESCRIPTION
PLAN AT EL. 5TH 1 2 2.8
1 2 2.8 PROJECT NAME 90-75 Sutphin blvd. Queens. NY 11432
ESC: 1:86
PLAN AT EL. 6TH
ESC: 1:86 PLAN AT EL. 7TH DRAWN BY The One Steel Group JOB No. DRG No.
ESC: 1:86
DATE DRAWN 12/08/2019 PROJ-054 E-001
BILL OF MATERIAL
MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

RD B1 3 3 3 3 3 B1 2 BEAMS SQ-2
3 16'-4 1/4
3 - 13/16 "Ø 3 - 13/16 "Ø
B1 2 W12X26 16'-7 1/4" 865 A992

1 3/4
B2 3 BEAMS SQ-2
3

3
B2 3 W18X46 27'-7 1/4" 3805 A992
3

6 1/2
1 3/4
3

3
4'-3 5/8 B3 3 BEAMS SQ-2

B3 3 W18X46 4'-6 7/8" 630 A992

1/8 p10 3 PL3/8"X7 13/16" 1'-4 13/16" 29 A36


(-6 3/8 ) W12X26 x16'-7 1/4 (-6 3/8 )

B4 3 BEAMS SQ-2
B3
B4 3 W12X19 19'-4 7/8" 1104 A992
BEAM - B1 4 - 13/16 "Ø
p10 a2 6 L4X4X3/8 0'-9 1/8" 45 A36
1 3/4

B5 3 BEAMS SQ-2

3
B5 3 W12X26 19'-3" 1503 A992

3
1 3/4

3
B6 2 BEAMS SQ-2

3
3 3 3 3 3 B6 2 W12X26 19'-0 1/8" 990 A992

B2 B7 2 BEAMS SQ-2
RD 11'-1 5 1/4 23'-1 5 1/4 27'-4 1/4
B7 2 W12X26 19'-1" 994 A992
3 3 3 3 3
3
B8 2 BEAMS SQ-2
(-6 3/8 ) W18X46 x4'-6 7/8
3

3
B8 2 W12X14 17'-6 1/2" 497 A992
3

3
a2 8 L4X4X3/8 0'-9 1/8" 59 A36
3

3
BEAM - B3
3

3
TOTAL WEIGHT THIS DRAWING 10520

3
4 - 13/16 "Ø

3 3 3 3 3 5 - 13/16 "Ø
3
(-6 3/8 ) W18X46 x27'-7 1/4 (-6 3/8 )

BEAM - B2

2 1/16

RD
2 1/16 19'-1 7/8
B4
2 11/16
a2 (B/ S) 3 - 13/16 "Ø
3

3
1 1/4
3

3
3

3
(- 5/16 ) 19'-5 5/16 (W12X19 x19'-4 7/8 ) (-6 3/8 )

BEAM - B4
B8
2 15/16 2 15/16
a2 (B/ S)
a2 (B/ S)
RD B5
3 19'-0

3
3 - 13/16 "Ø

1 1/8

1 1/8
3

3
3

3
3

3
3

13/16

13/16
2 15/16
3

2 15/16

RD
2 17'-4 1/2
(-5 1/2 ) W12X26 x19'-3 (-3 1/2 )
(- 1/4 ) 17'-7 1/2 (W12X14 x17'-6 1/2 ) (- 1/4 )

BEAM - B5 BEAM - B8
RD B6
3 9'-3 15/16 5 3/16 18'-9 1/8
3 - 13/16 "Ø 3 - 13/16 "Ø
RD B7
3 9'-3 15/16 5 3/16 18'-10
3 - 13/16 "Ø 3 - 13/16 "Ø
3

3
3

3
3

3
3

3
(-5 1/2 ) W12X26 x19'-0 1/8 (-6 3/8 )

(-5 1/2 ) W12X26 x19'-1 (-5 1/2 )

BEAM - B6
REV DESCRIPTION DATE
BEAM - B7
The One Steel Group

BEAM
Tekla structures

DESCRIPTION
PROJECT NAME 90-75 Sutphin blvd. Queens. NY 11432
DRAWN BY The One Steel JOB No. DRG No.

DATE DRAWN 12/09/2019 PROJ-054 B-001


BILL OF MATERIAL
MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

B10 2 BEAMS SQ-2

B10 2 W12X19 19'-10 1/2" 753 A992

a1 4 L4X4X3/8 0'-9 1/8" 30 A36


RD
a2 4 L4X4X3/8 0'-9 1/8" 30 A36
2 1/16 19'-8 1/2
B10
2 11/16 2 3/16
a2 (B/ S) a1 (B/ S) B11 1 BEAM SQ-2

B11 1 W12X19 19'-10 1/2" 377 A992

a1 2 L4X4X3/8 0'-9 1/8" 15 A36


3

3
1 1/4

1 3/16
a2 2 L4X4X3/8 0'-9 1/8" 15 A36
3

3
3

3
B12 3 BEAMS SQ-2

B12 3 W12X14 19'-5 3/4" 827 A992

a1 6 L4X4X3/8 0'-9 1/8" 45 A36


(- 5/16 ) 19'-11 7/16 (W12X19 x19'-10 1/2 ) (- 1/4 )
TOTAL WEIGHT THIS DRAWING 2091

BEAM - B10

RD
2 1/16 19'-8 7/16
B11
2 11/16 3 1/8
a2 (B/ S) a1 (B/ S)
3

3
1 1/4

1 1/4
3

3
3

3
(- 5/16 ) 19'-11 7/16 (W12X19 x19'-10 1/2 ) (- 5/16 )

BEAM - B11

B12
2 3/16
3 - 13/16 "Ø a1 (B/ S)
3

1 3/16
3

3
3

3
RD
3 19'-3 3/4
19'-3 3/4
(-5 1/2 ) 19'-6 1/4 (W12X14 x19'-5 3/4 ) (- 1/4 )

BEAM - B12

REV DESCRIPTION DATE

The One Steel Group

BEAM
Tekla structures

DESCRIPTION
PROJECT NAME 90-75 Sutphin blvd. Queens. NY 11432
DRAWN BY JOB No. DRG No.

DATE DRAWN 12/09/2019 PROJ-054 B-002


BILL OF MATERIAL
MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

2 1/2 2 1/2 1 1/2 1 1/2


C2 1 COLUMN SQ-2
5/8 C2 1 W10X33 16'-6 3/4" 547 A992
5/8 BP2 1 PL3/4"X15" 1'-3" 48 A36

p6 1 PL1/2"X9 13/16" 0'-11 1/2" 14 A36

3
3
p7 1 FL1/2"X6" 0'-9" 8 A36

3
16'-2
3

3
C3 1 COLUMN SQ-2

1/8

15'-8

15'-8
C3 1 W10X33 9'-1" 300 A992

1/8
p6 1 PL1/2"X9 13/16" 0'-11 1/2" 14 A36

B-B p7 1 FL1/2"X6" 0'-9" 8 A36

A-A
2 1/2 2 1/2 1 1/2 1 1/2 C5 1 COLUMN SQ-2

2 1/2 2 1/2 1 1/2 1 1/2 C5 1 W10X33 16'-6 3/4" 547 A992

BP2 1 PL3/4"X15" 1'-3" 48 A36

p6 1 PL1/2"X9 13/16" 0'-11 1/2" 14 A36

p7 1 FL1/2"X6" 0'-9" 8 A36

3
3
3

3
3

16'-2 1/4
3

3
p3 p3 C6 1 COLUMN SQ-2

16'-2 1/4
3

3
8 1/2

3
p5
D D C6 1 W10X33 9'-1" 300 A992
3

15'-8 1/4

15'-8 1/4
p6 1 PL1/2"X9 13/16" 0'-11 1/2" 14 A36
15'-8 1/4

15'-8 1/4
p7 1 FL1/2"X6" 0'-9" 8 A36

12'-6 3/8

12'-6 3/8

1/2 )
3

16'-8 (W10X33 x16'-6


C7 1 COLUMN SQ-2

1'-7
C7 1 W10X33 16'-6 1/2" 547 A992

11'-9 1/2
16'-7 1/2 (W10X33 x16'-6 3/4 )

3
p6 8 1/2 9 3/8 BP1 1 PL1 1/2"X15" 1'-3" 96 A36
C C
16'-7 1/2 (W10X33 x16'-6 3/4 )

B B

11'-6 1/2
11'-6 1/4

11'-6 1/4
8 1/2 9 3/8 p3 2 FL1/2"X6" 1'-0" 20 A36

p6
A A p5 1 PL1/2"X9 7/8" 0'-11 7/16" 14 A36
p7
9 3/8 9 3/8 p8 4 FL3/4"X6" 1'-6" 91 A36

3
p9 4 PL3/8"X3 3/4" 0'-8 3/4" 13 A36
3

3
p9 (B/ S)
3

11'-9 3/4

11'-9 3/4
TOTAL WEIGHT THIS DRAWING 2659
11'-9 3/4

11'-9 3/4

12'-6 1/2
C5

p7
C5
C2 BP2

RD

RD
BP2
RD

RD

2 15/16 2 15/16 2 15/16 2 15/16


2 15/16 2 15/16 2 15/16 2 15/16

COLUMN - C5 C7

RD

RD
COLUMN - C2
2 15/16 2 15/16 2 15/16 2 15/16

BP1
COLUMN - C7 5/8

8 1/2 9 3/8 8 1/2


1/8 5/8 p8 p9 p8
1/8 5/8 9 3/8 p8
p6 p7 p6 p7 p8

1 3/4
3/16
1 3/4
3

1 3/4
3

1 3/4
3

3
9 3/8 9 3/8
8'-4

8'-4

3 3 3 3 3 3 3 3
8'-4

8'-4
3 3 3 3 9 3/8 9 3/8 3 3 3 3

C-C
p9
D-D
W10X33 x9'-1

W10X33 x9'-1

C3

C3 C6
3

3
3

3
1 1/2 3

1 1/2 3
1 1/2 3

1 1/2 3

1 1/2 3

1 1/2 3
RD

RD

RD

RD

REV DESCRIPTION DATE

2 1/2 2 1/2 1 1/2 1 1/2 2 1/2 2 1/2 1 1/2 1 1/2


The One Steel Group

COLUMN
Tekla structures

DESCRIPTION
COLUMN - C3 COLUMN - C6 PROJECT NAME 90-75 Sutphin blvd. Queens. NY 11432
DRAWN BY The One Steel JOB No. DRG No.

DATE DRAWN 12/09/2019 PROJ-054 C-001


BILL OF MATERIAL
MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS

2 1/2 2 1/2 1 1/2 1 1/2 C8 1 COLUMN SQ-2

C8 1 W10X33 12'-7 1/2" 417 A992


p9 (B/ S) p8
p3 2 FL1/2"X6" 1'-0" 20 A36

p8 p5 1 PL1/2"X9 7/8" 0'-11 7/16" 14 A36


6 3/4 1 3/4 1 3/4 3 3 3 3 9 3/8 9 3/8 3 3 3 3

3
3
p8 4 FL3/4"X6" 1'-6" 91 A36
p5

3
12'-3
p9 4 PL3/8"X3 3/4" 0'-8 3/4" 13 A36

3
11'-9

11'-9

8'-6 7/8

8'-6 7/8
C9 1 COLUMN SQ-2

C9 1 W10X33 8'-7" 284 A992

3
D D p3 2 FL1/2"X6" 1'-0" 20 A36

3
p3 p5 1 PL1/2"X9 7/8" 0'-11 7/16" 14 A36

3
7'-10
p8 4 FL3/4"X6" 1'-6" 91 A36
C C

7'-7
7'-6 3/4

7'-6 3/4
p9 4 PL3/8"X3 3/4" 0'-8 3/4" 13 A36

7'-0 1/16
TOTAL WEIGHT THIS DRAWING 979

p3

p3
p5 8 1/2
B B

8'-7 3/4 (W10X33 x8'-7")


8'-6 7/8

8'-6 7/8
3

1'-6 15/16
3

W10X33 x12'-7 1/2


p3
3
7'-10

A A
7'-7
7'-6 3/4

7'-6 3/4

9 3/8 9 3/8

p9 (B/ S)

3
3

3
1 1/2 3

1 1/2 3
1 1/2 3
8'-7

RD

RD
C9

(- 1/2 )
2 1/2 2 1/2 1 1/2 1 1/2

5/8

p8
p8
p9

1 3/4
3

1 3/4

3/16
3

3
1 1/2 3

1 1/2 3
1 1/2 3

3 3 3 3 9 3/8 9 3/8 3 3 3 3
RD

RD

C8
C-C p9

2 1/2 2 1/2 1 1/2 1 1/2 D-D

COLUMN - C8 5/8
COLUMN - C9
p8
p8 p9
p8
p8
1 3/4
3/16
1 3/4

1 3/4
1 3/4

3 3 3 3 9 3/8 9 3/8 3 3 3 3
3 3 3 3 9 3/8 9 3/8 3 3 3 3

A-A
p9
B-B

REV DESCRIPTION DATE

The One Steel Group

COLUMN
Tekla structures

DESCRIPTION
PROJECT NAME 90-75 Sutphin blvd. Queens. NY 11432
DRAWN BY The One Steel JOB No. DRG No.

DATE DRAWN 12/09/2019 PROJ-054 C-002

You might also like