Pressure (barG) Holding Time (hr) ID (m) L (m) T (mm)*

8.5 2 1.41 4.24 13.3

* Material CS
* Corrosion Allowance of 3mm
* Design pressure of 1.2 x Operating
Pressure (barG) Holding Time (hr) ID (m) L (m) T (mm)*
8.5 0.33 0.78 2.33 8.7

* Material CS
* Corrosion Allowance of 3mm
* Design pressure of 1.2 x Operating
Pressure (barG) Holding Time (hr) ID (m) L (m) T (mm)*
8.5 0.17 0.62 1.85 7.5

* Material CS
* Corrosion Allowance of 3mm
* Design pressure of 1.2 x Operating
Flow (NTP) = ((Pf + 101.325)* (288.15)/(101.325)(Tf + 273.15) )* (Ac
NTP T 288.15 K
P 101.325 kPa

Trial 1
Pressure 8.5 barg 861.2625 kPag
Temperatur 30 degC 303.15 K
Flow 15 Nm3/hr
ID 1.412754 m
Area 1.567758 m2
Flow at 8.5 barG, 30 degC
1.661141 m3/hr
Holding T 2.00 h
L/D Ratio 3.00
Volume 3.32 m3
Moles 1.27 kmol
Vessel L 4.24 m
101.325)(Tf + 273.15) )* (Actual Flow)