Lotte Chemical Titan TE 3 Project
Lotte Chemical Titan TE 3 Project
Lotte Chemical Titan TE 3 Project
Home/ Business Sectors / Oil and Gas / Projects / Lotte Chemical Titan TE-3 Project Like 1 Share
Year: 2016
Status:
Supply of six (6) Towers and twenty two (22) Drums & Vessels in carbon steel material with a total
fabricated weight of 307 tons and thickness of up to 27 mm.
The expansion project would increase the complex’s production capacities for ethylene by 92,000
ton/year, for propylene by 170,000 ton/year, and for BTX by 134,000 ton/year.