PSS®E

IEC 60909 Fault Calculations

IEC 60909 Fault Calculations (IECS) Our solution


®
„ Easy to setup, IEC fault calculation uses existing PSS E
power flow and sequence network data. No
„ Fast solution,
additional validation of such data is required.
„ Multiple ways to initiate calculations and All fault currents are calculated per IEC 60909
report results, standard and the currents calculated include:
„ Meet IEC 60909-2001 standard requirements „ I”k Initial RMS symmetrical short-circuit cur-
rent
At a glance
PSS®E Version 31 performs IEC 60909 based „ ip(B) Peak short-circuit current by IEC 60909
fault analysis in addition to its other well known Method B
suite of fault analyses capabilities. This new „ ip(C) Peak short-circuit current by IEC 60909
fault calculation methodology is a self- Method C
contained analysis within PSS®E. The single
requirement prior to entering the IECS fault „ ib (DC) DC component of asymmetrical
calculation method is a valid power flow work- breaking current
ing case. The system sequence data is required „ ib (SYM) RMS Symmetrical short-circuit
only if unsymmetrical faults are to be simulated. breaking current
It simulates all fault types specified in IEC
60909, namely: „ ib (ASYM) RMS Asymmetrical short-circuit
breaking current
„ three-phase (3PH) faults
„ single-line-to-ground (LG) faults
„ double line-to-ground (LLG) faults
„ line-to-line (LL) faults
It can simulate one or all fault types at one bus
or all system or sub-system buses in one run
thereby reducing the analysis time.
The challenge
The electrical utilities and industries need to
design, operate, protect and maintain the elec-
trical installations as per IEC fault current du-
ties. To determine the worst fault duties, one
needs to consider various types of faults and
The various network elements, i.e., generators,
number of network scenarios potentially leading
motors, transformers, power station units,
to a large number of short circuit calculations.
loads, shunts, and dc devices are treated as
Assembling and validating the vast electrical
per the IEC 60909 standard.
network data required for fault analyses is cum-
bersome and time consuming.

Siemens PTI − Software Solutions


The fault calculations can be launched Application example
from PSS®E GUI; PSS®E batch scripts Results show the comparison of short
(BAT_, Python, IDEV) to simulate one or circuit currents obtained from PSS E
®

all faults at one or all buses in one run, IEC fault calculations and results given
without requiring additional commands. in IEC 60909-4, 2001 standard Sections
6.3.1 and 6.3.2.

Solution Faulted 3PH Fault LG Fault


Method Bus I”k kA I”k kA
standard 40.6447
1
PSS®E 40.6447
standard 31.7831 15.9722
2
PSS®E 31.7831 15.9722
Reports presenting “Total Fault Cur- standard 19.6730 10.4106
3
rents” and “Fault Currents Contributions” PSS®E 19.6730 10.4106
at N levels away from the faulted bus are standard 16.2277 9.0498
4
available. Fault currents and voltages PSS®E 16.2277 9.0498
(Ia1, Ia2, Ia0, IA, IB, IC, Va1, Va2, Va0, standard 33.1894 17.0452
VA, VB, VC) can also be displayed on 5
PSS®E 33.1894 17.0452
network model one line diagrams or standard 37.5629
exported to Python lists. 6
PSS®E 37.5630
standard 25.5895
7
PSS®E 25.5896
Figure 2 IEC 60909 Fault Calculation Dialog standard 13.5778
8
PSS®E 13.5778

Published by and copyright © 2009: Siemens AG For more information, please contact All rights reserved.
Energy Sector our Customer Support Center. Trademarks mentioned in this document
Siemens Energy, Inc. E D SE PTI Phone: +49 180 524 70 00 are the property of Siemens AG, its affiliates,
Power Distribution, T&D Service Solutions Freyeslebenstrasse 1 Fax: +49 180 524 24 71 or their respective owners.
Siemens Power Technologies International 91058 Erlangen, Germany (Charges depending on provider) Subject to change without prior notice.
400 State Street E-mail: support.energy@siemens.com The information in this document contains general
PO Box 1058 Siemens Transmission and Distribution Ltd descriptions of the technical options available,
Schenectady, NY 12301-1058 PTI Power Distribution Division which may not apply in all cases.
Sir William Siemens House, Princess Road Printed in Germany The required technical options should therefore be
www.siemens.com/energy/power-technologies Manchester, M20 2UR Printed on elementary chlorine-free specified in the contract.
United Kingdom bleached paper.
SWPE06-EN-200905

You might also like