SUMMARY
This document will be used to manage the hazardous and non-hazardous equipments that
Used for Afam F5 Project.
KEY WORD:
REFERENCES HOLDS
SLOT Document No Shell document No Description Page
TABLE OF CONTENTS
1.0 INTRODUCTION
1.0 INTRODUCTION
The Afam field is located in OML- 11 in SPDC’s Eastern division, approximately 32km East of Port Harcourt.
Okoloma Gas Plant was originally constructed to supply gas to Afam Power Plant located approximately 1.5km from
the plant. The Afam F5.0A project will contribute further gas supplies to continue the achievement of both those
original objectives.
In addition, it will introduce a new crude oil stream which will be stabilized in Okoloma Gas Plant and exported to
Bonny Crude Terminal, taking up unused capacity in the existing condensate treatment trains and pipeline
infrastructure.
1.2 SCOPE
The scope of works covers all the construction activities like planning, construction materials, calculation, evaluation,
certification, specifications, procedure, Mobilization and demobilization.
The flow line Procurement and Construction scope of work is as follows:
1.3 OBJECTIVE
The purpose of this methodology is to ensure that the requirements and responsibilities of all works associated
with construction and hook up of Afam F5 well16 (WNQZ-2, WNQZ-3) & 17 (WLQU-2) is as per project
specification
Make: M/Diesel
2. Mark Trailer
Make: Mack
Make: Volkswagon
4. Medivac
Make: Volvo
Make: Daf
7. Toyota Hilux
Make: Toyota
8. Toyota Bus
Make: Toyota
9. Toyota Bus
Make: Toyota
Make: Mack
Make: Mack
12. Excavator
Type: 320 BL
Make: CAT