Project No.

E-1109

Line#4 Project
Gummidipoondi, Tamilnadu, India

Project Document Title:


Design Calcution of Current Transformer
(CT) Support Structure

V-1140-700-SIE-CA-201204

Customer : SKI Carbon Black (P) Limited


EPC Contractor : SiEmens Ltd.
Engineering Consultant : L&T Hydrocarbon Engineering Ltd.
Engineering Services

16-Apr-19 A Issued for Review & Approval


JP PM PBM
Date Rev. Description Prepared By Checked BY Approved By

V-1140-700-STE-CA-201204 Page 1 of 15
V-1140-700-STE-CA-201204 Page 1 of 15
Line #4 Project, Gummidipoondi Design Calculation of CT Support Structures
Co-gen Boiler Package V-1140-700-STE-CA-201204 Rev. A 16-Apr-19

Issue and Approval Record

Issued Category Approval Code

✘ Engineering Procurement Construction Code A - Approved


Consent to proceed

Information Enquiry Construction Code B - Comments As Noted


Work may proceed subject to incorporation of comments

Review Purchase Commissioning Code C - Rejected


Revise and Resubmit. Work shall not proceed

✘ Approval Void As-Built Code D - Information


Accepted for information only

Is issued Category required approval? Code: Date Approver:

✘ Yes No NA Note: This approval does not relive the document ORIGINATOR any
of his obligations and responsibilities under this Contract .

V-1140-700-STE-CA-201204 Page 2 of 15
V-1140-700-STE-CA-201204 Page 2 of 15
Design Calculation of CT Support Structures
16-Apr-19

Approval Code

Code A - Approved
Consent to proceed

Code B - Comments As Noted


Work may proceed subject to incorporation of comments

Code C - Rejected
Revise and Resubmit. Work shall not proceed

Code D - Information
Accepted for information only

Approver:

Note: This approval does not relive the document ORIGINATOR any
of his obligations and responsibilities under this Contract.

V-1140-700-STE-CA-201204 Page 2 of 15
V-1140-700-STE-CA-201204 Page 2 of 15
Line #4 Project, Gummidipoondi Design Calculation of CT Support Structures
Co-gen Boiler Package V-1140-700-STE-CA-201204 Rev. A 16-Apr-19

Revision Record

Rev. Date Prepared By Checked By Approved By Revision Note/ Description


A 16-Apr-19 JP PM PBM For Review & Approval

V-1140-700-SIE-CA-201204 Page 3 of 15
V-1140-700-SIE-CA-201204 Page 3 of 15
Design Calculation of CT Support Structures
16-Apr-19

Revision Note/ Description


For Review & Approval

V-1140-700-SIE-CA-201204 Page 3 of 15
V-1140-700-SIE-CA-201204 Page 3 of 15
Line #4 Project, Gummidipoondi Design Calculation of CT Support Structures
Co-gen Boiler Package V-1140-700-STE-CA-201204 Rev. A 16-Apr-19

Contents
1.0 Loading Calculations 5

2.0 Design of Main Leg & Bracing 9

3.0 Design of Base Plate & Anchor Bolt 13

4.0 Summary 15

V-1140-700-STE-CA-201204 Page 4 of 15
V-1140-700-STE-CA-201204 Page 4 of 15
Design Calculation of CT Support Structures
16-Apr-19

V-1140-700-STE-CA-201204 Page 4 of 15
V-1140-700-STE-CA-201204 Page 4 of 15
#REF! Project Document Title
#REF! Project Document Number Rev. 0 20-May-18

1.0 Main Heading 1


Following guidelines shall be followed while writing project document:
·          Templates: Standard Templates for Excel (A4/A3) shall be used.
  
·          Cover Page:
 
§   Project Title: Font Size – 18pt, Font Style - Arial Bold
§   Document Title/Document and Contract Number – Font Size – 14pt
§   Period: Only applicable for progress report otherwise Heading can be removed.
§   LTHE Logo: By default the Logo size is width 6.5cm/2.55inch and height is 1.2cm/0.47inch,
however the logo may be re-sized to Minimum – Width 4.5cm/1.8inch, Height 0.83cm/0.33inch to
accommodate vendor logo or otherwise. Always stretch logo from corner.
If required, other project stakeholder logo may place after Customer & LTHE Logo as appropriate
§   Role i.e. customer, PMC. EPC , EPCM etc. and companies name shall be changed as per project.
·          Header and Footer: Following shall be adhered for Header and Footer.
 
§    Text Properties in Header Table:
Document Title: Font Size – 10pt, Font Style – Arial Bold;
Stream/Function/Discipline Name: Fort Size – 10, Font Style – Aria Bold;
Document Number/Revision/Date sections: Fort Size – 9, Font Style – Normal;
Date format: DD-MM-YY, ‘MM’ in Text format (i.e. Jan, Feb, Oct...);
§    Footer: Page No. Text Size – 9 pt, Page No. Style – X of Y.
§   Note 1: Wherever required in project ‘Project-Title’ and ‘Service Type’ section can be merged.
§   Note 2: Document Title and Project Document Number shall write directly (after deletion of caption)
i.e. For Document Title-‘Procedure for Audit’, For Project Doc. No.- ‘ G-STDX-00-ES-FT-000801’.
§   Note 3: Project Document Number shall be as per project document numbering philosophy agreed
with customer on a particular project. However Footer Bottom ‘LTHE Doc. No.’ shall be as per standard
LTHE document numbering philosophy. Both Project and LTHE document number may be same
where customer agreed on LTHE document number philosophy
·          Page Margins: Left – 1.90, Right – 1.5, Top – 1.0cm, Bottom –1.1, Header-1.0, Footer-0.8
  
·          Heading (Title/Subtitle/Sub-subtitle):
   Font Size: Main Title – 12pt, Subtitle – 11pt, Sub to Subtitle –10pt and any further heading
§   
title after sub to subtitle – 10pt;
§    Font Style: Arial Bold, Not in Capital;
At-least Main Title/Subtitle/Sub-subtitle shall number as given here (i.e. 1.0, 2.0,..1.1, 1.2,
§   
1.1.1, 1.1.2...)
·          Bullets:
  
§    Type: Main Bullet Sym. ‘Circle’ and Size – 11pt, Sub-bullet Sym. ‘Square’ and Size – 11pt;
·          Table:
 
§    Alignment: Follow page alignment;
·          Font : All in arial
  
·          Font Size for Text (document contents): 10pt
  

·              Text Writing: All text writing shall start from ‘0’ Left Indentation (hanging) as used in this document.
Vendor Doc. No. Page 6 of x
#REF! Project Document Title
#REF! Project Document Number Rev. 0 20-May-18

1.1.1 Sub Sub Heading


Follow the guidelines as detailed above

2.0 Main Heading 2


2.1 Sub Heading 1
Follow the guidelines as detailed above
2.1.1 Sub Sub Heading
Follow the guidelines as detailed above

Vendor Doc. No. Page 6 of x

You might also like