HondaX

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
ZA HONDA WG, tlas Honda Cy Wee ta)) eer i) For a Million Reasons Zi Mark-up Installment Plans Pr 4 A ss ys oo ee ® » SILKBANK Pr Silkbank Limited, in collaboration with Atlas Honda Limited, offers Silkbank Credit Card customers a smart and easy payment plan for purchasing Atlas Honda motorbikes. Silkbank Credit Card customers can now enjoy 0% mark-up up to 3 months on Atlas Honda motorbikes by availing Silkbank Shop Smart Installment Plan option. C70 eazo ai i — a= CD70-70cc Features: © Engine: 4-stroke OHC single cylinder cooled by air Displacement: 72 cm3 Bore and stroke: 47.0 x 41.4 mm © Compression ratio: 8.8:1 © Dimension (LxWxH): 1897 x 751 x 1014 mm. © Clutch: Multiple weight plates © Transmission: Continuous 4 speed mesh Starting: Kick-start © Frame: Backbone type Ground clearance: 136 mm © Petrol capacity: 8.5 liters Tyre at front: 2.25 - 17 (4 PR) © Tyre at back: 2.50 - 17 (4 PR) © Dry weight: 82 kg CD70 DREAM -70cc Features: Engine: 4-stroke OHC cooled by air © Displacement: 72 cm3 Bore and stroke: 47.0 x 41.4 mm © Compression ratio: 8.8:1 © Dimension (LxWxH): 1899 x 751 x 1014 mm © Clutch: Multiple weight plates * Transmission: Continuous 4 speed mesh © Starting: Kick-start Frame: Backbone type © Ground clearance: 136 mm © Petrol capacity: 8.6 liters © Dry weight: 82 kg © Tyre at front. 2.25 - 17 (4 PR) © Tyre at back: 2.50 - 17 (4 PR) MAI ra PRIDOR-100cc Features: Engine: 4-stroke OHC cooled by air © Bore and stroke: 50.0 x 49.5 mm - 97.1 cm3 © Petrol capacity: 9.7 liters (reserves 1.5 liters) © Starting: Kick-start Transmission: 4 speed constant mesh Final Drive: Roller chain Measurement: 1986 x 718 x 1050 mm © Seat height: 798 mm © Ground clearance: 156 mm ¢ Wheel base: 1226 mm © Tyre at front: 2.75 - 18.4 (4 PR) Tyre at back: 2.75 - 18.6 (4 PR) © Dry weight: 96 kg © Suspension front: Telescopic fork 94 mm travel Suspension back: Swing arm 84 mm travel 0% CG125-125cc Features: Engine: 4-stroke OHV cooled by air © Bore and stroke: 50.5 x 49.5 mm © Wheel base: 1201 mm. © Dimension (LxWxH): 1911 x 732 x 1016 mm © Starting: Kick-start © Transmission: Continuous 4 speed mesh © Seat height: 771 mm * Ground clearance: 140 mm © Petrol capacity: 9.2 liters © Tyre at front: 2.50 - 18 (4 PR) Tyre at back: 3.00 - 17 (6 PR) © Dry weight: 99 kg Final driver: Roller chain 7 © Suspension front: Telescopic fork 103 mm travel © Suspension back: Swing afm 68 mm travel 0% Le CB 150F -150cc Features: © Engine: 4 Stroke 150cc SOHC Air Cooled Engine with Balancer © Displacement: 149.2 cm3 © Bore & Stroke: 57.3 x 57.8 mm © Compression Ratio: 9.1.1 © Transmission: Continuous 5 Speed Mesh Starter: Self-StartKick-Start © Final Drive: Roller Chain © Dimension (LxWxH): 2051 x 760 x 1085 mm © Petrol Capacity: 13.0 Liters (Reserve 1.4 Liters) © Wheel Base: 1311 mm © Tire at Front: 80/100 -18 M/C (47) © Tire at Back: 90/90-18 M/C (61P) © Suspension at Front: Telescopic 107 mm Fork © Suspension at Back: Swing Arm 91 mm © Dry Weight: 124 kg 7 172,000 ME ss te ft es) HOW TO AVAIL SILKBANK SHOP SMART INSTALLMENT PLAN = Call Silkbank 24 hours phone banking service at (021) 111-100-777 to Place an order for the motorbike of your choice through our Silkbank Shop Smart Installment Plan. Enjoy 0% mark-up by opting for an Installment Plan tenure of 3 months. Furthermore, Silkbank Credit Card customers can also choose from Installment Plans involving tenures of 6,9,12, 18,24 and 36 months. . Your selected product will be delivered at the nearest dealership. Terms & Conditions This offer can be availed by Silkbank Visa Platinum & Gold Credit Card holders. Silkbank Credit Card customers can purchase Atlas Honda motorbikes using Silkbank Shop Smart Installment Plan during the validity of the offer. Silkbank shall process and authorize Shop Smart Installment Plans transactions provided that the amount is within the available credit limit and card accounts in good standing as per the Terms & Conditions of Silkbank Credit Cards and Silkbank policies. This offer is valid from June 01,2018 - December 30,2018. The approved Shop Smart Installment Plan transaction will appear on the next statement of account. The offer cannot be exchanged for cash and is not valid in conjunction with any other special promotions, offers, events or activities as defined by Silkbank &. Alliance Partners. Customer or his/her authorized nominated person must provide his/her CNIC copy and sign the delivery documents at the time of product delivery. All products booked through Silkbank Shop Smart installment Plan will be delivered to the customer within 10-15 working days at the designated address. First shipment delivery charges will be borne by the Alliance Partners for all products booked through Silkbank Shop Smart Installment Plan. However in case of warranty claims or upgrades, customer has to bear the cost of shipment and other related things as per standard Terms & Conditions of Partners. Delivery of the product would be subject to availability of stock and pricesare subjectto change without notice. Card member's account(s) that is/are closed or terminated or delinquent prior to the offer period date will not be eligible for Silkbank Shop Smart Installment Plan. Product warranty shall be determined as per the Alliance Partner's warranty Terms & Conditions for the particular item. Silkbank’s decision on all matters relating to the offer and in case of any dispute shall be final and binding on all eeligible. card += members and no correspondences/negotiations/discussions in relation therewith shall be entertained. Silkbank reserves the right to change the Terms & Conditions of this offer at any time without prior notice and without assigning any reason. However, from time to time new products can be offered in future subject to availability in stock maintained by Partner. Silkbank will not be responsible for the services or if product quality provided is not to the satisfaction of Silkbank customers. In no event shall Silkbank, or any of its representatives/affiliates, be liable or responsible for any loss, damage or expense arising out of or otherwise in connection with the offer/services. Please refer to Silkbank Schedule of Charges for processing/service fees. Silkbank, at its absolute discretion shalll have the right to terminate the offer without assigning any reason and without prior notice, and shall not be held liable for any inconvenience/damage caused due to such termination of the offer. In case the card member decides to cancel his/her Shop Smart Installment Plan then the card member will be liable to pay prepayment penalty amount as per Silkbank Schedule of Charges. ieee iw ET Ty Ct Ee ues SS) Cru ey )ptions ed SILKBANK 7 ©(021) 111-100-333 “Oamusitoank com pk Yes we can [£)/SilkbankCreditcards DXISMS 9873

You might also like