Professional Documents
Culture Documents
Research 1001
Research 1001
Next to the building itself, there is no greater investment than the site.
The site should not be viewed merely as an isolated plot of land; it must also
be seen as the part of the total community situation. A home site is more
than a place upon which to build a house. It is permanent location for the
family residence. Great care, therefore, must be exercised to insure a site
and neighborhood suited to the present and future needs of the family.
Site Location
The site must be placed within its proper geographical, political, and
functional context. This fixes the site in relation to adjacent land uses,
community transportation patterns, utility and infrastructure availability,
employment, commercial, cultural and recreational centers. Each of these
has a bearing on the site development potential. For example, the adjacent
land use patterns will determine the appropriate land use for a proposed site
based upon the comprehensive plan. The availability of roads, and in some
cases mass transit may have a significant influence on if, and for what, a site
is suitable in terms of access. The presence of water, sewers, and other
utilities can also dictate the suitability of a site as a target for expansion.
And of course the proximity to work, jobs, and schools are a factor in real
estate suitability.
A. Available Facilities
Schools
Transportation facilities
The present trend in the design of residential areas is such that community
facilities(schools, churches, theaters, etc.) and commercial areas are not
located within walking distance.
Utilities
Utilities and services such as electricity , sewers water, telephones and
fire and police protection are useful to both conservation efforts and
tourism management. These conveniences are important but never
important enough to jeopardize the integrity of the site. Requirements
and limits on them must be established so that the delivery of current
and projected utilities and services can be accomplished without site
damage.
B. Physical Features
Topography
Lot size
Some families enjoy spacious lawns, while others are interested in minimal
amount of yard work. It depends on the owner or the families. Narrow lots
may present difficulties in orientation of the major living areas and/ or the
placement of the building.
C. Physical Ordinates
Zoning
Building codes
It varies from the area to area. Investigate first the building restrictions in
the area prior to any lot commitment.
The deed to the site should be inspected for any restrictions and easements.
E. Site Cost
• Accessible location
• Acceptable land costs
• Manageable development costs
• Ability to support all project components (i.e. - development,
recreation, regulatory constraints, circulation and infrastructure)
• Topography
• Soils
Closely related are the soils characteristics which are frequently a direct
product of the underlying geology. The soils may be important in terms of
stability, suitability for structural foundations, erosion susceptibility, surface
drainage, and soil fertility to support plant growth. Again, the suitability of
soils is very much dependent upon the proposed uses. A site suitable for
intensive structural development may be unsuitable for recreational
activities and vice-versa.
• Water
• Vegetation
• Wildlife
• Site drainage
• Regulatory restrictions
• Property size and shape
• Existing utilities and structures
Generally, these areas will reinforce one another. That is, steep slopes, poor
soils, areas of vegetation to be protected, etc. will fall in the same general
locations, although what is suitable for one type of land use may be
unsuitable for another. This is why it is important to have some idea of the
program prior to completing the site analysis. The composite analysis map
provides clear justification to the designer for where the most intensive
development should occur on a site with the minimum environmental
impact. It also highlights particularly positive elements of the site that
should be accentuated in the subsequent design development.
Off-Site Issues - factor into an acceptable site as well. The project team
must consider potential:
• Air traffic
• Noise
• Views
• Odors
5) Microclimate – Information on general climatic factors such as seasonal
temperature averages, amounts of precipitation, etc. are available locally.
Microclimatic factors refer to variations to the general climate such as might
be created by topography, plants and vegetation, exposure to winds,
elevation above sea level, and relationships to structural elements. These
factors are important to design in terms of delineating the “opportunities and
constraints” of a particular site for development noted by Laurie (See earlier
discussion). Slopes are analyzed in relation to solar orientation to determine
“warm” and “cool” slopes, based on sun exposure. Shade and shadow
patterns created by existing vegetation and structures are important to
design in terms of potential positive or negative impacts for development.
Plants may be used to ameliorate undesirable conditions by providing
windbreaks, shade, etc.
6)
7)
In either case, the end product of the site analysis phase of the design
process is a composite analysis map (sometimes referred to as an
opportunities and constraints sheet). This is developed through an overlay
process (similar to McHarg’s planning approach, although greatly simplified)
delineating the most suitable and least suitable areas of the site for each
analysis factor.
Selection Criteria
3.1
The primary consideration in relation to site selection is an appropriate
location. As a National Stadium, proximity to a large pool of potential
spectators will help to maximise the level of attendance at sporting events.
In addition, for international sporting events, proximity to air and port
facilities is necessary to facilitate people attending from abroad.
3.2
The Dublin area has the greatest concentration of population in the country
having 39% of the population located within Dublin City, County and the
surrounding counties of Meath, Wicklow and Kildare. Furthermore, the
country’s main international airport and car ferry facilities are also based in
the Dublin area. Therefore, at a national level, Dublin is considered to be the
optimum location.
3.3
In selecting particular sites within the Dublin area the following criteria were
considered: (i) Location
3.4
b. downtown or urban sites – sites within the existing built up area of the
city and close to the city centre.
3.5
The initial brief for the consultancy assignment identified the most suitable
site area as being approximately 300 acres to accommodate the Stadium
and ancillary sporting facilities.
3.6
3.7
3.8
(iv) Parking
3.9
For a greenfield site, adequate space for parking on site is required, while for
a city centre location, the capacity of the site itself, plus the surrounding
street network to accommodate adequate parking was considered.
3.10
The road network in the locality of each site was evaluated taking into
account the ability of the existing roads to accommodate the likely traffic
volumes and identifying the extent to which improvements may be required.
Proximity to a motorway was considered to be important.
3.12
The level of existing public transport in the area was considered. While bus
services are important, the existence of heavy or light rail is also beneficial
as a mode of transporting people quickly and efficiently without impacting on
the roads in the area.
(viii) Town Planning
3.13
The current development zoning for each site was identified from the
relevant development plan, together with any possible restrictions the plan
might impose on the development of the property such as the existence of
listed structures. Consideration was given to any issue that would restrict the
possibility of planning permission being granted.
3.14
3.15
The identified sites were evaluated and ranked under the headings of
Greenfield and Urban and within these under the sub-headings of Public
Ownership or Private Ownership. The short list of twelve which best fitted the
selection criteria is set out in Table 3A below.
3.16
Having given due consideration to the selection criteria noted above, and
mindful that as the National Stadium public expectations will be high, both
the consultants and Government Steering Committee were anxious to ensure
that the Stadium location would be in-keeping with, and in harmony with its
surroundings. During the course of the study feedback from the non-
Stadium based NGB’s was strongly supportive of having additional sporting
facilities alongside the Stadium. Ongoing discussions in this regard with the
Government Steering Committee led to further development of the concept
of a Campus of Sporting Excellence alongside the Stadium (detailed in
Section 9). The development of such a campus would necessitate a much
larger site area. We have established that the minimum size in these
circumstances would be 150 acres. None of the urban sites qualified under
this requirement and the greenfield sites capable of accommodating this
concept were Abbotstown/Corduff, Phoenix Park, Santry Demesne and
Belgard Road.
3.17
The selection criteria were further considered for the final short list of four
sites and the scoring is set out in Table 3B below:
3.18
3.19
3.20
Since the opening of the M50 to the west and north of Dublin city, this
corridor has become the focus for considerable development, and has now
become the primary location for large scale business occupiers in suburban
Dublin. When completed, the M50 will have the benefit of linking together all
of the major arterial routes to and from Dublin and also to the Airport.
3.21
This chosen site has the additional benefit of being adjacent to an existing
railway line (with a station at Blanchardstown) and the opportunity to build a
new station to the east of the motorway. The government is currently
proposing to invest significantly in railway infrastructure throughout Ireland
and the promotion of the use of railways is government policy.
3.22
3.23
The site, at 495 acres, is larger than required for the Stadium alone. The
surplus land could be disposed of with a ready market for its development,
subject to planning, for either residential or commercial uses. Demand in the
market for development land is strong and there are major development
schemes in progress immediately adjoining the site.
3.24
3.25
In summary, this site has all the benefits of accessibility and profile together
with being large enough to provide all facilities required on the site, while
still maintaining a rural and high amenity setting just five miles from the city
centre.
3.26
The land use zoning under the Fingal County Council draft Development Plan
1998 is Objective "B", which is "to protect and provide for the development
of agriculture and rural
amenity".
3.27
This zoning restricts the use of the property to agriculture and related uses.
The potential for any development is limited to that which would be
consistent with the rural location. The uses or development which may be
permitted in principle under this zoning include:
• Airfield
• Integrated tourism/recreational complex
• Agricultural Buildings
• Public Services
• Caravan Park
• Woodland/Urban forestry
• Golf Course
3.28
• Car Park
• Hotel/conference centre
• Cultural use
• Park & Ride
• Education
• Recycling
• Hospital
3.29
The value of land is directly related to its land use zoning, as this dictates the
use to which it can be put and its potential for future development. With the
proposed Objective "B" zoning, the current value for the entire 495 acre site
is in the region of IR£30m.
3.30
The majority of the lands surrounding the property are zoned for commercial
or residential use. Development for these uses is permitted in principle,
subject to receipt of planning permission. If the Abbotstown site had a similar
zoning its value would be significantly higher.
3.31
Across the road from the site in the Dunsink Tiphead which will be
unavailable for further development for the foreseeable future due to
methane gas omission. However, it would be possible to develop such a site
into an overflow car park, thereby making best use of the land available on
the Abbotstown site. Based on the proposed site layout, the National
Stadium together with the Campus of Sporting Excellence will require 220
acres of the chosen site plus the area for car parking at Dunsink. There is,
therefore, surplus land available at Abbotstown of approximately 275 acres.
3.32
On the assumption that this surplus land is re-zoned for commercial and/or
residential use, that there are no material planning restrictions imposed and
that the proposed infrastructure improvements (including those for the
National Stadium) are put in place, the value of the 275 acres is a minimum
of £80 million as a single lot. If the property was sold in smaller lots the total
price could be substantially higher.
3.33
In order to further enhance the potential receipts from the disposal of surplus
land, roads and services should be provided and the land sold in smaller lots.
Site Access
3.34
The main access to the Stadium will be from the N3 Blanchardstown By-Pass
at the roundabout junction with Main Street/ River Road. This entrance would
be used by both vehicles and pedestrians and will provide access to the
Stadium on both event days and non-event days
3.35
i. From Dunsink Lane at the entrance to Elmgreen Golf Course. The link from
Dunsink Lane to the site would be via an overbridge on the M50 taking
advantage of the elevation of Dunsink Lane over the motorway.
ii. From Snugboro Road between the access to the James Connolly Memorial
iii. Hospital and the access to the Abbotstown Veterinary Research Facility.
3.36
Car Parking
3.37
3.38
3.39
Coach Parking
3.40
3.41
Shuttle Bus
3.42
3.43
Rail
3.44
The Connolly - Maynooth railway line traverses the M50 junction south of the
Stadium. Thisline is currently being developed by Irish Rail and it is expected
that some 10% of spectators (8,000 persons) will access the Stadium by rail
on major event days.
3.45
To cater for these spectators, it is proposed that the existing rail station at
Blanchardstown be supplemented by the development of an additional
railway station off Navan Road east of the Dunsink Lane bridge.
Infrastructure Improvements
3.46
o Ballycollin Road
o Corduff Road
o Blanchardstown
Road North
o Rathoath Road
o Cappagh Road
o Castleheany Western
Distributor Road
o Ongar Way
3.47
(a) Roads
(b) Rail
(c) Bus
(d) Pedestrians
3.49
RESEARCH 100:
CRITERIA
Architectural Design 8
SUBMITTED BY:
Querubin. Mark Anthony V.
BSA-4B
SUBMITTED TO:
Arch. Mario L. Bonita
Instructor ARDES 8
DATE SUBMITTED:
RESEARCH 100:
AND
CRITERIA
Architectural Design 8
SUBMITTED BY:
Mayo, Jovie Ann R.
BSA-4B
SUBMITTED TO:
Arch. Mario L. Bonita
Instructor ARDES 8
DATE SUBMITTED:
November 15, 2010