CLIENT

DEDICATED FREIGHT CORRIDOR CORPORATION (I) LTD.

Eastern Dedicated Freight Corridor - Contract


PROJECT

Package - 303, Khurja to Pilkhani

TITLE Recommendation of Isolated Foundation for New Sakoti


DFCC Type-A Quarters on the basis of Plate Load
Test

CONSULTANT

CONTRACTOR

L&T Construction

PREPARED CHECKED APPROVED


DATE Rev.
No. MODIFICATIONS / PURPOSE OF ISSUE Name Signature Name Signature Name Signature

04-02-20 For Approval SP SAM AD

NAME DESIGNATION SIGNATURE

M K Majumdar AUTHORIZED REPRESENTATIVE

DATE PAGES DOC NO: Rev.No.


DOC/CP-303/1/PLT/0007 -
04.02.2020 4
STAFF QUARTERS TYPE-A (1,2,3) AT NEW SAKOTI, CP- 303 project (EDFC)

INDEX
Sr. No. Description Pg. No.

1 Introduction 2

2 Scope of the Report 2

3 Geological Information of the Region 2

4 Recommendation 3

Document No. Revision Date Page


DOC/CP-303/1/PLT/0007 - 04-02-20 Page 1 of 4
STAFF QUARTERS TYPE-A (1,2,3) AT NEW SAKOTI, CP- 303 project (EDFC)

1. INTRODUCTION

The dedicated freight corridor corporation of India (DFCCIL) has undertaken “Design and
construction of civil, structures and track works, involving formation in embankment /cutting,
ballast on formation, track works, bridges, structures, buildings, yards & integration with
Indian railway's existing railway system and testing & commissioning on design-build lump
sum basis of Khurja-Pilkhani section (approximately 220.71 route km of single line) of eastern
dedicated freight corridor”.

The Dedicated Freight corridor Corporation of India Ltd., has awarded the work of
Design and Construction (Civil and Structures) of CTP-303 Package of Eastern Dedicated
freight Corridor project from Khurja to Pilkhani to L&T Construction.

2. SCOPE OF THE REPORT

This report contains the following information


1. Introduction
2. Scope of work
3. General Geology and Topography of the area
4. Purpose of the Document
5. Recommendations

3. GEOLOGICAL INFORMATION OF THE REGION

3.1 Location

The site is referred to as KHURJA - PILKHANI SECTION of eastern dedicated freight


corridor in State of Uttar Pradesh. Index map showing location of the project stretch is
presented in Fig.1.

Fig.1: Index map showing project location

Document No. Revision Date Page


DOC/CP-303/1/PLT/0007 - 04-02-20 Page 2 of 4
STAFF QUARTERS TYPE-A (1,2,3) AT NEW SAKOTI, CP- 303 project (EDFC)

3.2 Climate

Project stretch is located on the Indo-Gangetic alluvial plains. Climate corresponds to


semi-arid with high variation between summer and winter temperatures. Average annual
rainfall is in a range of 20 – 40 cm.
Summer temperatures can be as high as 47°C, and winter temperatures as low as 0°C. The
weather is generally dry, but is very humid from mid-May to the end of August. Rainfall is
primarily from the south-west due to monsoon weather, and is concentrated in the period
July to mid-September.

3.3 Topography, Geography and General geology

The project site is part of Indo-Gangetic Plain. It is the world's most extensive tract of
uninterrupted alluvium. These deep, river-deposited sediments give rise to fertile soils. The
Indo-Gangetic Plain, with an area of about 270,000 square miles (700,000 square kilometers),
varies in width by several hundred miles. These deep, river-deposited sediments give rise to
fertile soils. In addition, they are rich in groundwater for well irrigation. The flat terrain also
makes the area ideal for canal irrigation.

4. RECOMMENDATION

Fig 2: Schematic Diagram for Building Foundation

Document No. Revision Date Page


DOC/CP-303/1/PLT/0007 - 04-02-20 Page 3 of 4
STAFF QUARTERS TYPE-A (1,2,3) AT NEW SAKOTI, CP- 303 project (EDFC)

1. Based on PLT, Isolated foundation resting on Natural Ground is recommended at the founding
level (Refer Approved Drawing).
2. The foundation is designed assuming 15 T/m2 SBC at founding level.

3. The PLT has been conducted at the founding level via RFI No. L&T/LOT-303/SECTION/P-
2/QS&OSB/2.7.1/56301 Dated 27.01.2020, validating the assumed SBC and the same has been
attached.

Document No. Revision Date Page


DOC/CP-303/1/PLT/0007 - 04-02-20 Page 4 of 4