YEARLY MAINTENANCE SCHEDULE

2018 2019 2020


No Equipment Q.ty
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

I Power system

1 MV & Tranformers lot 1D 1D

2 Low voltage (phase 1 & 2) lot 2D 2D

3 Earthing & Lightning (phase 1 & 2) lot 1D 1D

Generators (phase 1) 2 set 2D 2D 2D 2D 2D 2D 2D 2D


4
Generators (phase 2) 1 set 1D 1D 1D 1D

5 ATS test lot 1D 1D

II UPS & Battery

UPS 200 Kva, Battery, Dry type Tranformer (phase 1) 4 set 1D 1D 2D 2D 2D 2D 2D 2D 2D


1
UPS 200 Kva, Battery, Dry type Tranformer (phase 2) 4 set 2D 2D 2D 2D

2 DC voltage (48VDC, 110VDC) 1 set 1D 1D 1D 1D 1D 1D 1D 1D 1D

III Fire fighting system

1 Nitrogen Fire fighting system lot 3D 3D 3D 3D

2 Fire fighting by FOAM, water, fire extinguishing 3D 3D 3D 3D

Check and certified Fire extinguishing by fire protechtion and


3 lot 1D 1D
fire fighting Department

IV Extra Low voltage

1 Public address system lot 2D 2D 2D 2D

2 Access control system lot 3D 3D 3D 3D 3D 3D 3D 3D

3 Roller shutter door 2 set 1D 1D 1D 1D

4 CCTV system (Camera) lot 3D 3D 3D 3D

5 Fire arlarm & VESDA system lot 3D 3D 3D 3D

6 BMS system lot 3D 3D

V HVAC system & Others

Air conditioner server (phase 1) lot 5D 5D 5D 5D 5D 5D 5D 5D


1
Air conditioner server + Electric (phase 2) lot 4D 4D 4D 4D

2 Air conditioner Ofice & Electric (phase 1 ) 5D 5D 5D 5D

3 Water supply and Water drain system lot 2D 2D 2D 2D

4 Emergency Lighting lot 2D 2D

5 Lighting & socket lot 2D 2D

6 Clean outside Wall lot 10D 10D 10D 10D