Calculating Drainage Works Productivity
Calculating Drainage Works Productivity
ANT 01 EB Z2 Mid Whau & Patiki 3.2.1 to 3.2.2 (3) A1055 A1055 8/18/2014 4 1 375 1 0.5+0.5+1 2 Works completed
ANT 02 EB Z2 West of Patiki off 2.15.1 to 2.15.2 (3) A1035 A1035 8/21/2014 7 0 600 2 0.5+2+1 3.5 Works completed
ANT 03 EB Z2 West of Patiki off 2.4.1 to 2.4.4 (3) A1045 A1045 8/27/2014 46 2 375 1 0.5+1+1+3 5.5 Works completed
ANT 03 EB Z2 West of Patiki off 2.8.1 to 2.8.2 (part) (3) A1046 A1046 9/3/2014 15 0 600 1 0.5+1+1.5 3 Works completed
Constained by TTM on both sides. 5te Exc. ? Excavate and
backfill directly to/from 6 wheel trucks. No storage or passing
ANT 04 EB Patiki Gore 2.4.4 to 2.4.8 & 2.7.1 to 2.7.2 (4) A1721 A1721 11/25/2014 100 7 300 0.5+7+3.5+2(d) 13 x x 1.85/1.35 Tip x 50% shored Dry Yes Yes area 0.5+7+3.5+2(d) 13
51 375
ANT 05 EB Patiki to RT4 2.1.1 to 2.1.2 (sheet 4) A1980 A1980 12/19/2014 5 1 375 1 0.5+1+0.5 2 1.8 x x x Type B Open Dry No No Outfall required 0.5+1+0.5 2
ANT 05 EB Patiki to RT4 2.7.1 to 2.7.2 (sheet 5) A1980 A1980 12/19/2014 7 1 525 0.5+1+0.5 2 2.05 x x Tip x Shored Tidal No No Wingwall required 0.5+1+0.5 2
ANT 06 EB Z3 East of Whau 3.4.1 to 3.4.2 (2) A1483 A1483 9/10/2014 6 1 375 1 0.5+0.5+1+3+1 6 Works completed
Excavate and backfill directly to/from 6 wheel trucks. No storage
ANT 07 EB Z3 West of Whau 3.4.3 to 3.4.4 (1 & 2) A1241 A1241 11/17/2014 34 2 300 0 0.5+2+1+0.5 4 x x 1.45 x Type B Open Dry Yes Yes or passing area 0.5+2+1+0.5 4
ANT 08 EB Rosebank 1.27.6 to 1.27.13 (6 & 7) A41270 A41270 2/2/2015 99 7 300 5 0.5+3.5+2+2+7 15 x 1.25 x x Type B Open Dry No No Includes 6 single catchpits; = 6 x 0.33 = 2 additional days 0.5+7+3.5+2 13
75 375
11 450
ANT 09 WB Z3 West of Whau 3.3.3 to 3.3.4 (2) A6080 A6080 10/28/2014 10 2 300 0.5+0.5+1 2 x x 1.22 x Type B Open Dry No No 0.5+0.5+1 2
ANT10 A25210 A25210 Nov 15 ?? 232 14 375 0.5+7+17 24.5
100 450
ANT11 A20650 A20650 Mar 16 ?? 32 9 375 0.5+4.5+13 18
20 450
20 525
110 600
ANT12 A28300 A28300 Mar 16 ?? 96 13 300 0.5+6.5+25 32
111 375
65 450
94 525
67 600
ANT13 A28350 A28350 May 16 ?? 32 2 300 0.5+1+1.5 3
RYAN 01 WB Patiki Porters Yd SK 0828 A2770 A2770 7/15/2014 0
RYAN 02 WB Z2 Patiki 1st 2.25.1/2 & 2.11.1/3 (part) (5) A2780 A2780 10/6/2014 35 5 375 2 0.5+2.5+2+6 11
37 525
10 600
RYAN 03 WB Z2 Patiki 2.11.5 to 2.11.9 (5) A6090 A6090 10/22/2014 16 5 300 0.5+2.5+4.5 7.5
47 450
RYAN 04 WB Z2 Rosebank to Patiki 1.17.1 to 2.2.27 & TD1.1 (6 & 7) A43360 A2430 12/16/2014 59 21 225 1 9 1.5+10.5+1+3+42 58
A42970 210 300
436 375
103 450
4 525
RYAN 05 WB Z2 Patiki 2.12.1 to 2.11.2 part (5) A3180 A3180 3/20/2015 11 3 525 0 0 0.5+1.5+5.5 7.5
55 600
RYAN 06 WB Z2 Patiki 2.11.9 (part) to 1.18.3 (part) (6 & 7) A43400 A2470 3/10/2015 224 5 225 0 0 0.5+2.5+10 13
Includes 1 TD (Box vault type), extra 1 day due to shoring
RYAN 07 WB East of Whau (2) 3.3.1 to 3.3.2 (2) A4035 A4035 3/10/2015 22 1 375 1 0.5+2+1+1+1+3 8.5 x 2.13 x x Type B 50% shored Dry No No required 0.5+2+1+1+1+3 8.5
RYAN 08 WB Z2 Patiki 2.11.4 (part) to 2.11.5 (part) (5) A6100 A6100 3/28/2015 38 0 450 0 0 0.5+2.5 3
RYAN 09 WB Patiki to Whau 3.1.1-3.1.6 + SD + TD3.1 (3) A3440 A3440 1/29/2015 9 1 600 0.5+2.5+7+3 13 2.03 x x x type B Shored wingwall required, extra 1day due to shoring required, incl. 1TD 0.5+2.5+7+3 13
2 450
32 375
64 300
RYAN 10 WB Patiki to Whau 2.5.1 to 2.6.3 & 2.5.7 + SD + TD2.1 (3&4) A3441 A3441 2/12/2015 70 9 300 1 9 0.5+4.5+3.5+1+3+14 31
100 375
36 450
32 525
8 600
RYAN 11 WB Patiki to Whau 2.2.1 to 2.2.4 + TD2.2 (4 ) A3442 A3442 2/28/2015 8 2 675 1 0.5+1+3+1+2.5 8 2.4 x x tip x Shored Dry No No Includes 1TD(Box vault type), 1 outlet fall 0.5+1+3+1+2.5 8
12.5 600
4 375
Inculdes 600mm rocker from 2.2.4 to 2.2.5 and 375mm rocker
RYAN 11 WB Patiki to Whau 2.2.4-2.13.4+SD(4+5) A3442 A3442 2/28/2015 14 5 375 1 0.5+2.5+0.5+5.5 9 1.92 x x 50% 50% open cut Dry No No to CP2.10 --> extra 1 day 0.5+2.5+0.5+5.5 9
99 300
Includes 1 CP, Excavate and backfill directly to/from 6 wheel
RYAN 12 WB Patiki to Whau 3.5.1 to CP3.1 (3) A3540 A3540 5/14/2015 115 3 225 1 1 0.5+1+2+5 8.5 1 x x tip x Shored Dry Yes Yes trucks. No storage or passing area 0.5+2+11.5+2(d) 16
RYAN 13 WB Patiki to Whau 2.26.1 to CP2.14 (4) A3541 A3541 5/25/2015 4 6 300 1 2 0.5+3+1+1+10 15.5
158 375
7094 m 714 Days