Project wide drainage programme review Dated : 19th Nov 14

Expected drainage outputs, assuming no site constraints or access issues

m's/shif Depth 0-2m 2m+ Plus


Diameter Mobilise to site = 0.5 gang days
100-300 25 20 Headwall + rocker = 1 gang day
375-525 20 15 Chamber = 0.5 gang days
575-675 15 12.5 Single Catchpits = 0.33 gang days
1200 5 na Double Catchpits = 0.5 gang days
Treble catchpits = 1 gang day (x)d disruption add
Treatment Device(Box vault TD = 3 gang day, Manhole TD = 0.5 gang Day)
Area Work Work Prog. Installation Run No of Pipe No of No of Depth beneath Spoil relocated to Shored or Dry or Access Site Comments Time allowance Duaration
UPDATED
Duration(
ACTIVITY IDs material existing or
Engineer Area Extent Ref. Date length chambers Dia. Headwalls Catchpit time allowance only) FL Subgrade Pavement ag to tip type B open cut? dewatering? constraints? constraints? Days
Complete
d WB GNRI Area 1 outlet5.1.1 to CPMH5.1.3 N/A 25 1 450 1 0.5+0.5+1+2 4 Works completed
GNRI 01 EB GNRI Area 3A Outlet 5.18.1 to 5.18.5 (13) A2260 N/A 78 4 525 2 0.5+2+2+7 11.5 Works completed
30 600
GNRI 03 WB GNRI Area 2B Outlet 5.27.1 to 5.3.2 (14) WB1350 8/7/2014 51 4 375 2 0.5+2+2+5 9.5 Works completed
20 525
GNRI 04 WB GNRI Area 8A 5.1.3 to 5.1. 14 (14 & 15) WB2340 8/28/2014 2 12 450 0 0.5+6+12 18.5 Works completed
179 375
46 300
GNRI 05 EB GNRI Area 6B 5.9.2 to 5.9.4 (part only) (13) A41870 A5010 10/9/2014 19 2 375 0 0.5+2+6 8.5
13 525
40 600
GNRI 06 WB GNRI Area 2B 5.4.1 to 5.4.4 part (13) A2040 WB1690 11/1/2014 7 2 675 1 0.5+1+1+2 4.5
10 600
GNRI 07 EB GNRI Area 6D 5.8.1 to 5.8.3 (14) A41870 A4850 11/13/2014 57 2 300 1 2 0.5+1+1+1+3 6.5
GNRI 08 EB Area 10C 5.11.1 to 5.11.2 part (16) A5270 A5270 12/19/2014 23.5 1200 1 0.5+1+5 7.5
GNRI 09 WB GNRI Area 2C 5.3.3 to 5.2.5 (14) A2071 WB2050 3/1/2015 46.5 7 375 0 1 0.5+3.5+8 12
50 300
36 525
GNRI 10 WB GNRI Area 2C 5.4.3 to 5.4.4 part (13) A2076 WB2130 3/1/2015 22 600 0.5+2 2.5
GNRI 11 EB off ramp 5.20.1 to 5.20.2 (13) A41490 A41085 3/17/2014 4 1 300 0.5+1+0.5 2 x 0.89 x x type B Open Dry No No 0.5+1+0.5 2
GNRI 11 EB off ramp 5.19.1 to 5.19.2 (13) A41490 A41085 3/17/2014 4 1 300 0.5+1+0.5 2 x 1.07 x x type B Open Dry No No 0.5+1+0.5 2
Order 12 WB GNRI Area 2B 5.6.1 to 5.6.2 & 5.7.1 to TD5.5 (12&13) A2025 WB1350 8/7/2014 16 2 375 2 0.5+1+2 3.5
Order 13 EB GNRI Area 6B 5.9.1 to 5.9.4 part (13) A41870 A5010 10/9/2014
GNRI 13 EB on ramp loop 5.13.1 to 5.13.9 (16/17) A1470 A1470 3/1/2015 59 8 375 1 0.5+1+4+14 19.5
198 300
GNRI 14 EB on ramp loop 5.11.2 to 5.11.1 part (16) A5270 A41020 8/16/2016 23.5 1200 1 0.5+1+5 7.5
GNRI 15 Area 9 median East 5.3.12 to 5.3.19 (14 & 15) A41210 A41210 Jul 15 ?? 75 8 375 0 0.5+4+8 12.5
GNRI 16 Area 9 median Central 5.3.5 to 5.3.12 (14) A41210 ?? Jan 16 ?? 8 7 525 0 0.5+3.5+9 12
50 450
75 375
GNRI 17 Area 9 median West (EB) 5.10.4 to 5.9.9 &WCA limit (13 & 14) A43190 ?? Oct 15/Feb 16 126 10 300 0 0.5+5+13.5 19
94 375
3 450
8 525
GNRI 18 Area 9 median West (WB) 5.4.4 to 5.4.6 & WCA limit (13) A43200 ?? Oct 15/Feb 16 130 3 525 0 0.5+1.5+9 11
GNRI 19 Area 9 off ramp gore (EB) 5.12.1 to 5.12.4 (13) A43210 ?? Apr 16 ?? 123 3 300 1 0.5+1.5+1+6.5 9.5
Mike 01 EB Causeway 1.23.1 to 1.23.2 (9) A36241 A35710 9/25/2014 5 1 300 1 0.5+0.5+1 2 1.65 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 02 EB Causeway 1.26.1 to 1.24.1 (8) A35900 A35900 10/21/2014 5 2 600 1 0.5+1+1+1.5 4 x x x x x x x x x Included in Mike 03
26 375
Mike 03 EB Causeway TD1.5 & 525 (8) A35901 A35901 10/28/2014 2.5 0 600 0 0.5+1 1.5 1.55 x x x Type B Open Dry No No Includes 1 TD & 1 Wingwall & 1 outfall 0.5+2+10+3.5+3 19
9.5 525
Mike 04 EB Causeway 1.25.1 to 1.25.6 (8) A35902 A35902 11/3/2014 198 5 300 1 0.5+2.5+1+9 13 x x x x x x x x Included in Mike 03
Mike 05 EB Causeway 1.26.3 to SD 1.18 (8) A35903 A35903 11/17/2014 170 8 450 0.5+4+13 17.5 1.3 x x x Type B Open Dry Excl. existing settlement tank to be removed
35 375
65 300
Mike 06 EB Causeway 1.48.1 to 1.48.2 (10) A37510 A37510 12/1/2014 4 1 300 1 0.5+1+0.5 2 1.56 x x x Type B Open Dry x x 0.5+1+0.5 2
Mike 07 EB Causeway 1.22.1 to 1.22.2 (9) A36241 A36240 12/15/2014 4 1 300 1 0.5+1+0.5 2 1.57 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 08 WB Causeway 1.1.1/2 & 1.2.2/2 & 1.3.1/2 (10 & 11) A39710 A39710 9/15/2014 17 375 3 0.5+3+2 5.5
12 450
Mike 09 EB Causeway 1.49.1 to 1.49.2 (10) A37520 A37520 1/5/2015 4 1 300 1 0.5+1+0.5 2 1.56 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 10 EB Causeway 1.52.1 to 1.52.2 (11) A38080 A38080 7/6/2015 4 1 300 1 0.5+1+0.5 2 1.62 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 11 EB Causeway 1.51.1 to 1.51.2 (11) A39890 A39890 7/13/2015 4 1 300 1 0.5+1+0.5 2 1.56 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 12 EB Causeway 1.50.1 to 1.50.2 (11) A38180 A38180 8/11/2015 4 1 375 1 0.5+1+0.5 2 1.56 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 13 EB Causeway 1.53.1 to TD1.8 (12) A38280 A38280 9/21/2015 5 1 300 1 0.5+1+0.5 2 1.85 x x x Type B Open Dry No No Includes 1 TD 0.5+0.1+0.5+1 3
Mike 14 EB Causeway 5.22.1 to 5.22.2 (12) A37320 A37320 8/17/2015 4 1 300 1 0.5+0.1+0.5+1 3 2.17 x x x Type B Shored Dry No No Extra 1 gang day due to shoring required. 0.5+1+0.5+1 3
Mike 14 EB Causeway 5.21.1 to 5.21.2 (12) A37320 A37320 8/17/2015 5 1 300 1 0.5+1+0.5+1 3 1.78 x x x Type B Open Dry No No 0.5+1+0.5 2
Mike 15 WB Causeway 1.4.1 to 1.4.2 1.5.1 to 1.5.2 (9 & 10) A38670 A38670 8/3/2015 7.5 1 300 1 0.5+1+0.5 2
7.5 1 300 1 0.5+1+0.5 2
Mike 16 WB Causeway 1.8.1 to TD1.7 & 1.12.1 to TD1.6 (8) A40410 A40410 7/9/2015 6 525 1 0.5+1+3+0.5 5
5.5 525 1 0.5+1+3+0.5 5
Mike 17 WB Causeway 1.6.1 to 1.6.2 (9) A37220 A37220 8/31/2015 7.5 1 300 1 0.5+1+0.5 2
Partially under existing ramp. Includes 1 TD & 1 wingwall & 1
double & 1 treble catchpit. Plus 160m2 of 200mm RC protection
Dwayne 01 EB Causeway 1.27.1 to 1.62.1 & 1.27.6 + TD1.3 (7) A41590 A41590 7/21/2015 30 6 375 1 2 0.5+1+9+3+3+0.5+1 18 x 1.4 x 50% 50% Open Some tidal No Yes slab! 0.5+1+9+3+3+0.5+1 18
25 450
95 525
16 600
Mike 18 WB Causeway ch 2380 to 2460 A43220 ?? Oct 15 ?? 17 4 300 4 0.5+2+7 9.5
63 375
11 525
Mike 19 WB Causeway ch 2520 to 2760 A43230 ?? Oct 15 ?? 9 7 525 0.5+3.5+12 16
70 375
126.5 300
Mike 20 Median Causeway ch 2380 to 2580 A43240 ?? Nov 15 ?? 24 7 525 0.5+3.5+11 15
Area Work Work Prog. Installation Run No of Pipe No of No of Depth beneath Spoil relocated to Shored or Dry or Access Site Comments Time allowance Duaration
UPDATED Duration(
ACTIVITY IDs
material existing or
Engineer Area Extent Ref. Date length chambers Dia. Headwalls Catchpit time allowance only) FL Subgrade Pavement ag to tip type B open cut? dewatering? constraints? constraints? Days
116 375
25 300
Mike 21 Median Causeway ch 2600 to 2800 A43250 ?? Nov 15 ?? 25 7 525 0.5+3.5+10 14
103 375
25 300
AMY 01 WB Z1 under Rosebank 1.18.1 to 1.19.1 (7) A37430 A37430 12/18/2014 9 3 450 1 0.5+1.5+1+5 8
57 525
AMY 02 WB Z1 under Rosebank 1.20.1 to 1.21.1 & 1.20.5 (7) A39730 & A39730 11/17/2014 112 5 300 1 3 0.5+2.5+1+1.5+6 11.5
A37420 9 375
AMY 03 WB Z1 under Rosebank 1.70.1 to 1.70.2 (7) A41480 A41480 7/13/2015 9.5 0 1200 2 0.5+2+2 4.5
AMY 04 WB Z1 under Rosebank 1.16.1 to CP1.2 & 1.20 + TD1.2 (7) A41470 A41470 9/14/2015 115 7 300 1 6 0.5+3.5+1+3+3+7 18
20 375
5 450
AMY 05 WB Causeway 1.1.2, 1.2.2, & 1.3.2 to 1.3.3 (10 & 11) A41560 A41460 2/11/2015 85 3 300 0.5+3+4 7.5

ANT 01 EB Z2 Mid Whau & Patiki 3.2.1 to 3.2.2 (3) A1055 A1055 8/18/2014 4 1 375 1 0.5+0.5+1 2 Works completed
ANT 02 EB Z2 West of Patiki off 2.15.1 to 2.15.2 (3) A1035 A1035 8/21/2014 7 0 600 2 0.5+2+1 3.5 Works completed
ANT 03 EB Z2 West of Patiki off 2.4.1 to 2.4.4 (3) A1045 A1045 8/27/2014 46 2 375 1 0.5+1+1+3 5.5 Works completed
ANT 03 EB Z2 West of Patiki off 2.8.1 to 2.8.2 (part) (3) A1046 A1046 9/3/2014 15 0 600 1 0.5+1+1.5 3 Works completed
Constained by TTM on both sides. 5te Exc. ? Excavate and
backfill directly to/from 6 wheel trucks. No storage or passing
ANT 04 EB Patiki Gore 2.4.4 to 2.4.8 & 2.7.1 to 2.7.2 (4) A1721 A1721 11/25/2014 100 7 300 0.5+7+3.5+2(d) 13 x x 1.85/1.35 Tip x 50% shored Dry Yes Yes area 0.5+7+3.5+2(d) 13
51 375
ANT 05 EB Patiki to RT4 2.1.1 to 2.1.2 (sheet 4) A1980 A1980 12/19/2014 5 1 375 1 0.5+1+0.5 2 1.8 x x x Type B Open Dry No No Outfall required 0.5+1+0.5 2
ANT 05 EB Patiki to RT4 2.7.1 to 2.7.2 (sheet 5) A1980 A1980 12/19/2014 7 1 525 0.5+1+0.5 2 2.05 x x Tip x Shored Tidal No No Wingwall required 0.5+1+0.5 2
ANT 06 EB Z3 East of Whau 3.4.1 to 3.4.2 (2) A1483 A1483 9/10/2014 6 1 375 1 0.5+0.5+1+3+1 6 Works completed
Excavate and backfill directly to/from 6 wheel trucks. No storage
ANT 07 EB Z3 West of Whau 3.4.3 to 3.4.4 (1 & 2) A1241 A1241 11/17/2014 34 2 300 0 0.5+2+1+0.5 4 x x 1.45 x Type B Open Dry Yes Yes or passing area 0.5+2+1+0.5 4
ANT 08 EB Rosebank 1.27.6 to 1.27.13 (6 & 7) A41270 A41270 2/2/2015 99 7 300 5 0.5+3.5+2+2+7 15 x 1.25 x x Type B Open Dry No No Includes 6 single catchpits; = 6 x 0.33 = 2 additional days 0.5+7+3.5+2 13
75 375
11 450
ANT 09 WB Z3 West of Whau 3.3.3 to 3.3.4 (2) A6080 A6080 10/28/2014 10 2 300 0.5+0.5+1 2 x x 1.22 x Type B Open Dry No No 0.5+0.5+1 2
ANT10 A25210 A25210 Nov 15 ?? 232 14 375 0.5+7+17 24.5
100 450
ANT11 A20650 A20650 Mar 16 ?? 32 9 375 0.5+4.5+13 18
20 450
20 525
110 600
ANT12 A28300 A28300 Mar 16 ?? 96 13 300 0.5+6.5+25 32
111 375
65 450
94 525
67 600
ANT13 A28350 A28350 May 16 ?? 32 2 300 0.5+1+1.5 3
RYAN 01 WB Patiki Porters Yd SK 0828 A2770 A2770 7/15/2014 0
RYAN 02 WB Z2 Patiki 1st 2.25.1/2 & 2.11.1/3 (part) (5) A2780 A2780 10/6/2014 35 5 375 2 0.5+2.5+2+6 11
37 525
10 600
RYAN 03 WB Z2 Patiki 2.11.5 to 2.11.9 (5) A6090 A6090 10/22/2014 16 5 300 0.5+2.5+4.5 7.5
47 450
RYAN 04 WB Z2 Rosebank to Patiki 1.17.1 to 2.2.27 & TD1.1 (6 & 7) A43360 A2430 12/16/2014 59 21 225 1 9 1.5+10.5+1+3+42 58
A42970 210 300
436 375
103 450
4 525
RYAN 05 WB Z2 Patiki 2.12.1 to 2.11.2 part (5) A3180 A3180 3/20/2015 11 3 525 0 0 0.5+1.5+5.5 7.5
55 600
RYAN 06 WB Z2 Patiki 2.11.9 (part) to 1.18.3 (part) (6 & 7) A43400 A2470 3/10/2015 224 5 225 0 0 0.5+2.5+10 13
Includes 1 TD (Box vault type), extra 1 day due to shoring
RYAN 07 WB East of Whau (2) 3.3.1 to 3.3.2 (2) A4035 A4035 3/10/2015 22 1 375 1 0.5+2+1+1+1+3 8.5 x 2.13 x x Type B 50% shored Dry No No required 0.5+2+1+1+1+3 8.5
RYAN 08 WB Z2 Patiki 2.11.4 (part) to 2.11.5 (part) (5) A6100 A6100 3/28/2015 38 0 450 0 0 0.5+2.5 3
RYAN 09 WB Patiki to Whau 3.1.1-3.1.6 + SD + TD3.1 (3) A3440 A3440 1/29/2015 9 1 600 0.5+2.5+7+3 13 2.03 x x x type B Shored wingwall required, extra 1day due to shoring required, incl. 1TD 0.5+2.5+7+3 13
2 450
32 375
64 300
RYAN 10 WB Patiki to Whau 2.5.1 to 2.6.3 & 2.5.7 + SD + TD2.1 (3&4) A3441 A3441 2/12/2015 70 9 300 1 9 0.5+4.5+3.5+1+3+14 31
100 375
36 450
32 525
8 600
RYAN 11 WB Patiki to Whau 2.2.1 to 2.2.4 + TD2.2 (4 ) A3442 A3442 2/28/2015 8 2 675 1 0.5+1+3+1+2.5 8 2.4 x x tip x Shored Dry No No Includes 1TD(Box vault type), 1 outlet fall 0.5+1+3+1+2.5 8
12.5 600
4 375
Inculdes 600mm rocker from 2.2.4 to 2.2.5 and 375mm rocker
RYAN 11 WB Patiki to Whau 2.2.4-2.13.4+SD(4+5) A3442 A3442 2/28/2015 14 5 375 1 0.5+2.5+0.5+5.5 9 1.92 x x 50% 50% open cut Dry No No to CP2.10 --> extra 1 day 0.5+2.5+0.5+5.5 9
99 300
Includes 1 CP, Excavate and backfill directly to/from 6 wheel
RYAN 12 WB Patiki to Whau 3.5.1 to CP3.1 (3) A3540 A3540 5/14/2015 115 3 225 1 1 0.5+1+2+5 8.5 1 x x tip x Shored Dry Yes Yes trucks. No storage or passing area 0.5+2+11.5+2(d) 16
RYAN 13 WB Patiki to Whau 2.26.1 to CP2.14 (4) A3541 A3541 5/25/2015 4 6 300 1 2 0.5+3+1+1+10 15.5
158 375
7094 m 714 Days

Still to consider programme/weather calendar


slot drain
Dwayne 01 RC protection slab
beware double crew days for TD's!

You might also like